2 resultados para Cost-benefits analysis

em Galway Mayo Institute of Technology, Ireland


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The objective of this dissertation is to investigate the effect wind energy has on the Electricity Supply Industry in Ireland. Wind power generation is a source of renewable energy that is in abundant supply in Ireland and is fast becoming a resource that Ireland is depending on as a diverse and secure of supply of energy. However, wind is an intermittent resource and coupled with a variable demand, there are integration issues with balancing demand and supply effectively. To maintain a secure supply of electricity to customers, it is necessary that wind power has an operational reserve to ensure appropriate backup for situations where there is low wind but high demand. This dissertation examines the affect of this integration by comparing wind generation to that of conventional generation in the national grid. This is done to ascertain the cost benefits of wind power generation against a scenario with no wind generation. Then, the analysis examines to see if wind power can meet the pillars of sustainability. This entails looking at wind in a practical scenario to observe how it meets these pillars under the criteria of environmental responsibility, displacement of conventional fuel, cost competitiveness and security of supply.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy management is the process of monitoring, controlling and conserving energy in a building or organisation. The main reasons for this are for cost purposes and benefit to the environment. Through various techniques and solutions for lighting, heating, office equipment, the building fabric etc along with a change in people’s attitudes there can be a substantial saving in the amount spent on energy. A good example o f energy waste in GMIT is the lighting situation in the library. All the lights are switched on all day on even in places where that is adequate daylighting, which is a big waste o f energy. Also the lights for book shelves are left on. Surely all these books won’t be searched for all at the one time. It would make much more sense to have local switches that the users can control when they are searching for a particular book. Heating controls for the older parts o f the college are badly needed. A room like 834 needs a TRV to prevent it from overheating as temperatures often reach the high twenties due to the heat from the radiators, computers, solar gains and heat from users o f the room. Also in the old part o f the college it is missing vital insulation, along with not being air tight due to the era when it was built. Pumped bonded bead insulation and sealant around services and gaps can greatly improve the thermal performance o f the building and help achieve a higher BER cert. GMIT should also look at the possibility o f installing a CHP plant to meet the base heating loads. It would meet the requirement o f running 4500 hours a year and would receive some financial support from the Accelerated Capital Allowance. I f people’s attitudes are changed through energy awareness campaigns and a few changes made for more energy efficient equipment, substantial savings can be made in the energy expenditure.