2 resultados para Complex problems

em Galway Mayo Institute of Technology, Ireland


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The threats posed by climate change are placing governments under increasing pressure to meet electricity demand from low carbon sources. Wind energy has been has been identified as one of the main technologies to help in meeting these demands. The public in general favour wind energy yet proposed targets for generation capacity lag behind proposed goals. The N IM B Y phenomenon has been suggested as one of the reasons why we are behind our wind generation capacity targets. It is a common mistake to take general support for granted and expect the public to support developments when confronted with them in their local area. In many cases it is not unheard of that governing bodies whether social, political, regulatory, environmental, or cultural can overrule general public support and halt developments. Motives to halt developments will vary depending on the institutional body involved. The problem with the term N IM B Y is that it is too basic a term to describe the broad spectrum of complex motives that various institutions including the public may have against a development. This research focuses on a case study where the developer had major problems with the local county council and its wind energy policies when he was erecting a wind turbine despite having gained planning permission. A survey questionnaire was also used as part o f the research to seek the perception a rural community had on wind energy. The research findings and results are discussed with respect to the literature review highlighting a general public support for wind energy and the influence institutional bodies have over the progress of developments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study was to evaluate the determinism of the AS-lnterface network and the 3 main families of control systems, which may use it, namely PLC, PC and RTOS. During the course of this study the PROFIBUS and Ethernet field level networks were also considered in order to ensure that they would not introduce unacceptable latencies into the overall control system. This research demonstrated that an incorrectly configured Ethernet network introduces unacceptable variable duration latencies into the control system, thus care must be exercised if the determinism of a control system is not to be compromised. This study introduces a new concept of using statistics and process capability metrics in the form of CPk values, to specify how suitable a control system is for a given control task. The PLC systems, which were tested, demonstrated extremely deterministic responses, but when a large number of iterations were introduced in the user program, the mean control system latency was much too great for an AS-I network. Thus the PLC was found to be unsuitable for an AS-I network if a large, complex user program Is required. The PC systems, which were tested were non-deterministic and had latencies of variable duration. These latencies became extremely exaggerated when a graphing ActiveX was included in the control application. These PC systems also exhibited a non-normal frequency distribution of control system latencies, and as such are unsuitable for implementation with an AS-I network. The RTOS system, which was tested, overcame the problems identified with the PLC systems and produced an extremely deterministic response, even when a large number of iterations were introduced in the user program. The RTOS system, which was tested, is capable of providing a suitable deterministic control system response, even when an extremely large, complex user program is required.