6 resultados para Interconnected electric utility systems Queensland


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Física

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A Thesis submitted for the co-tutelle degree of Doctor in Physics at Universidade Nova de Lisboa and Université Pierre et Marie Curie

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Based on the presentation and discussion at the 3rd Winter School on Technology Assessment, December 2012, Universidade Nova de Lisboa (Portugal), Caparica Campus, PhD programme on Technology Assessment

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Paper presented at the Colloquium Gerpisa 2013, Paris (http://gerpisa.org/node/2085), Session n°: 19 New kinds of mobility: old and new business models

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Based on the report for the unit “Project IV” of the PhD programme on Technology Assessment under the supervision of Dr.-Ing. Marcel Weil and Prof. Dr. António Brandão Moniz. The report was presented and discussed at the Doctorate Conference on Technologogy Assessment in July 2013 at the University Nova Lisboa, Caparica campus.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Work Project seeks to analyze the viability, utility and best way of implementing mechanisms of double accounting and of insertion of low (or null) sales objectives in an incentives program. The main findings are that both processes are possible and to a certain extent advisable, although in very specific ways and with some limitations. Double accounting processes are especially effective between different segments and networks and should have a greater impact in the first evaluation periods of each case and the null objectives, albeit usable, are recommended to be always substituted by positive objectives, even if quite small. Moreover, it is concluded that the formal structure of the incentives program influences significantly these concepts, namely concerning the duration of the evaluation periods and the interaction of the objectives of different entities for both the vertical (hierarchic) and horizontal (individual and collective) levels.