22 resultados para Down-sample algorithm

em RUN (Reposit


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this work project is to analyze the current algorithm used by EDP to estimate their clients’ electrical energy consumptions, create a new algorithm and compare the advantages and disadvantages of both. This new algorithm is different from the current one as it incorporates some effects from temperature variations. The results of the comparison show that this new algorithm with temperature variables performed better than the same algorithm without temperature variables, although there is still potential for further improvements of the current algorithm, if the prediction model is estimated using a sample of daily data, which is the case of the current EDP algorithm.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Animal Cognition, V.6, pp. 259–267

Relevância:

20.00% 20.00%

Publicador:

Resumo:

IEEE International Symposium on Circuits and Systems, pp. 724 – 727, Seattle, EUA

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Informática

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores

Relevância:

20.00% 20.00%

Publicador:

Resumo:

RESUMO - A consciência de uma necessidade clara em rentabilizar a capacidade instalada e os meios tecnológicos e humanos disponíveis no Bloco Operatório e face ao imperativo de um cabal desempenho e de uma adequada efectividade nestes serviços levou-nos à realização deste estudo. Objectivos: O trabalho de projecto centrou-se em quatro objectivos concretos: Elaboração de uma grelha de observação de Modelos de Gestão de Bloco Operatório; Observação de seis Modelos de Gestão de Blocos Operatórios em experiências nacionais e in-loco, de acordo com a grelha de observação; Avaliação da qualidade gestionária na amostra seleccionada à luz dos modelos existentes; Criação de uma grelha de indicadores para a monitorização e avaliação do Bloco Operatório. Metodologia: Na elaboração da grelha de observação dos Blocos Operatórios recorremos a um grupo de peritos, à bibliografia disponível e à informação recolhida em entrevistas. Aplicámos a grelha de observação aos seis Blocos Operatórios e analisámos as informações referentes a cada modelo com a finalidade de encontrar os pontos-chave que mais se destacavam em cada um deles. Para a elaboração da grelha de indicadores de monitorização do Bloco Operatório realizámos uma reunião recorrendo à técnica de grupo nominal para encontrar o nível de consenso entre os peritos. Resultados: Criámos uma grelha de observação de Modelos de Gestão de Bloco Operatório que permite comparar as características de gestão. Esta grelha foi aplicada a seis Blocos Operatórios o que permitiu destacar como elementos principais e de diferenciação: o sistema de incentivos implementado; o sistema informático, de comunicação entre os serviços e de débito directo dos gastos; a existência de uma equipa de gestão de Bloco Operatório e de Gestão de Risco; a importância de um planeamento cirúrgico semanal e da existência de um regulamento do Bloco Operatório. Desenhámos um painel de indicadores para uma monitorização do Bloco Operatório, de onde destacamos: tempo médio de paragem por razões técnicas, tempo médio de paragem por razões operacionais, tempo médio por equipa e tempo médio por procedimento. Considerações finais: Os Blocos Operatórios devem ponderar a existência das componentes mais importantes dos Modelos, bem como recolher exaustivamente indicadores de monitorização. A investigação futura deverá debruçar-se sobre a relação entre os indicadores de monitorização e os Modelos de Gestão, recorrendo à técnicas de benchmarking. -------------------ABSTRACT - This study was driven by the need to optimise available capacity, technology and human resources in the Operating Room and to address the corresponding goals of adequate performance and effectiveness. Objectives: This project focuses on four specific objectives: development of an observation grid of operating room management models; in-loco observation and documentation of six national operating room, according to the grid; assess the quality of management in the selected sample relative to existing management models; create a set of indicators for monitoring and evaluating operating rooms. Methodology: The design of the observation grid was based on experts’ consultation, a literature survey and information gathered in various interviews. The observation grid was applied to six operating rooms and the information for each management model was analysed in order to find its key characteristics. We used the Nominal Group Technique in order to develop a set of indicators for monitoring and evaluating operating rooms. Results: An observation grid was created for operating rooms management models, which allowed comparing management characteristics. This grid was applied to six operating rooms allowing disentangle its main features and differentiating characteristics: implementation of incentive systems; IT systems including information flow between services; inventory and expense management; existence of a management team and effective risk management; importance of weekly planning and regulations. We designed a set control indicators, whose major characteristics are the following: the average down time due to technical reasons, the average down time due to operational reasons, the average time per team and the average time per procedure. Final Conclusions: Operating rooms should consider the most relevant characteristics of management models and collect exhaustive information on control indicators. Future research should be devoted to assessing the operating room performance according to management models, using control indicators and benchmarking techniques.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Thesis submitted to the Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia, for the degree of Doctor of Philosophy in Biochemistry

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho apresentado no âmbito do Mestrado em Engenharia Informática, como requisito parcial para obtenção do grau de Mestre em Engenharia Informática

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Informática

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertation submitted in partial fulfillment of the requirements for the Degree of Master of Science in Geospatial Technologies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Biomédica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertation submitted in partial fulfillment of the requirements for the Degree of Master of Science in Geospatial Technologies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Doutor em Engenharia Química e Bioquímica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Biomédica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Eletrotécnica e Computadores