4 resultados para REGULATORY INFRASTRUCTURE
em RUN (Repositório da Universidade Nova de Lisboa) - FCT (Faculdade de Cienecias e Technologia), Universidade Nova de Lisboa (UNL), Portugal
Resumo:
Immunological tolerance, that is, the failure to mount an immune response to an otherwise immunogenic molecule, is one of the fundamental questions in immunology. The fact that lymphocytes express antigen receptors that are generated randomly and have the potential to recognize any conceivable antigen, adds another puzzle to the physiology of immunological tolerance. The other side of the coin, the general absence of immune responses to self antigens, is ensured by a tight regulation and several selection steps during T and B cell differentiation. One of these processes is the differentiation of regulatory T cells (Treg). While developing in the thymus, T cell clones bearing receptors with high affinity/avidity to antigens present at the time of differentiation may be eliminated by apoptosis or, alternatively, express Foxp3 and become Treg. Treg are key players in the regulation of immunological tolerance since humans and mice with complete loss of function variants of this gene develop fatal autoimmune conditions early in life.(...)
Resumo:
Portugal, having responsibilities at European level, needs to ensure compliance with European standards, particularly with regard to the European Security Plan for Critical Infrastructures. National critical infrastructures should be a focus of attention with regard to the management of public risks, since these represent "a set of services that are essential to the functioning of the country and the functioning of the forces that ensure national defense." (Soares, 2008) This contribution on national critical infrastructures (CI) has the essential objective of clarifying the development of the strategy adopted by Portugal in pursuit of the security of these fundamental infrastructures. The goal lies not only through producing a descriptive document, but also carry a brief confrontation between the legal framework related to these subjects and the reality in which the Critical Infrastructure Operators and the National Civil Protection Authority (ANPC) operate. It is intended, in this sense, to understand the development of the project for the national security program of critical infrastructures and what effects of its measures on operators. As for the methodology, we followed a methodological strategy, where we combine the literature with data obtained through semi-structured interviews. Portugal, being a geographically peripheral country and having no record of incidents capable of causing major contingencies in key services for the normal development of society, does not have a structured and regulator plan that substantiates the need for operators responsible for CI to invest in security. This same approach is expected at the State level, believing that even though this theme has be widely explored by international institutions, Portugal has not yet tried to give the attention it deserves. Without the existence of an institution and a regulatory system, CI operators can become less available to comply with the legal framework.
Resumo:
In broad sense, Project Financing1 as a mean of financing large scale infrastructural projects worldwide has had a steady growth in popularity for the last 20 years. This growth has been relatively unscathed from most economic cycles. However in the wake of the 2007 systemic Financial Crisis, Project Financing was also in trouble. The liquidity freeze and credit crunch that ensued affected all parties involved. Traditional Lenders, of this type of financial instrument, locked-in long-term contractual obligations, were severely hit with scarcity of funding compounded by rapidly increasing cost of funding. All the while, Banks were “rescued” by the concerted actions of Central Banks and other Multi-Lateral Agencies around the world but at the same time “stressed” by upcoming regulatory effort (Basel Committee). This impact resulted in specific changes to this type of long-term financing. Changes such as Commercial Banks’ increased risk aversion; pricing increase and maturities decrease of credit facilities; enforcement of Market Disruption Event clauses; partial responsibility for project risk by Multilateral Agencies; and adoption of utility-like availability payments in other industrial sectors such as transportation and even social infrastructure. To the extent possible, this report is then divided in three parts. First, it begins with a more instructional part, touching academic literature (theory) and giving the Banks perspective (practice), but mostly as an overview of Project Finance for awareness’ sake. The renowned Harvard Business School professor – Benjamin Esty, states2 that Project Finance is a “relatively unexplored territory for both empirical and theoretical research” which means that academic research efforts are lagging the practice of Project Finance. Second, the report presents a practical case regarding the first Road Concession in Portugal in 1998 ending with the lessons learned 10 years after Financial Close. Lastly, the report concludes with the analysis of the current trends and changes to the industry post Financial Crisis of the late 2000’s. To achieve this I’ll reference relevant papers, books on the subject, online articles and my own experience in the Project Finance Department at a major Portuguese Investment Bank. Regarding the latter, with the signing of a confidentiality agreement, I’m duly omitting sensitive and proprietary bank information.
Resumo:
Companies seeking to continue growing and developing need to consider the possibility of international expansion and what that represents to their future. To tackle this challenge it becomes necessary to establish the company’s interests and priorities as well as defining and assessing the foreign market opportunities of a specific industry. This directed research internship proposes and conducts a simulation of the preliminary foreign market assessment and selection within the Juncker Plan: country filtering and ranking having as a frame of reference the second largest construction company in Brazil, Andrade Gutierrez.