6 resultados para HOUSING FINANCE

em RUN (Repositório da Universidade Nova de Lisboa) - FCT (Faculdade de Cienecias e Technologia), Universidade Nova de Lisboa (UNL), Portugal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Masters Thesis, presented as part of the requirements for the award of a Research Masters Degree in Economics from NOVA – School of Business and Economics

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Currently, Angola portrays a notorious economic growth and due to recent innovative legislations, it has become the major investment attracting pole, especially in Sub-Saharan Africa, having, thus, an extraordinary potentiality for a rapid and sustainable development, likely to place her in outstanding positions in the world economic ranking. Yet, such economic growth entails demanding levels of intensive investment in infrastructure, what has been reported of the Angolan Government to be unable to respond to, save if recurring to very high index of external debt, poisoning, in this way, the future budgeting of the country. Due to these infrastructure investment shortages, the cost of production remains highly onerous and the cost of life extremely unaffordable. On this account, the current study disserts about the contract of Project Finance; an alternative finance resource given as a viable solution for the private financing of infrastructure, aiming to demonstrate that such contractual figure, likewise the experience of several emerging economies and others, is a contract bid framework to take into account in today’s world. It refers to a financing technique – through which the Government may satisfy a common need (for example, the construction of a public domain or public servicing), without having to pay neither offer any collateral – based on a complex legal-financial engineering, arranged throughout a coalition of typical and atypical agreements, whereby it is mandatory to look back at the basic concepts of corporate law. More than just a simple financial study, the dissertation at stake analyses the nature and legal framework of Project Finance, which is a legally atypical and innominate contract, concluding that there is a relevant need for regulating and devoting a special legal regime in the Angolan jurisdiction for this promising legal form in the contemporary corporate finance world.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Natural disasters are events that cause general and widespread destruction of the built environment and are becoming increasingly recurrent. They are a product of vulnerability and community exposure to natural hazards, generating a multitude of social, economic and cultural issues of which the loss of housing and the subsequent need for shelter is one of its major consequences. Nowadays, numerous factors contribute to increased vulnerability and exposure to natural disasters such as climate change with its impacts felt across the globe and which is currently seen as a worldwide threat to the built environment. The abandonment of disaster-affected areas can also push populations to regions where natural hazards are felt more severely. Although several actors in the post-disaster scenario provide for shelter needs and recovery programs, housing is often inadequate and unable to resist the effects of future natural hazards. Resilient housing is commonly not addressed due to the urgency in sheltering affected populations. However, by neglecting risks of exposure in construction, houses become vulnerable and are likely to be damaged or destroyed in future natural hazard events. That being said it becomes fundamental to include resilience criteria, when it comes to housing, which in turn will allow new houses to better withstand the passage of time and natural disasters, in the safest way possible. This master thesis is intended to provide guiding principles to take towards housing recovery after natural disasters, particularly in the form of flood resilient construction, considering floods are responsible for the largest number of natural disasters. To this purpose, the main structures that house affected populations were identified and analyzed in depth. After assessing the risks and damages that flood events can cause in housing, a methodology was proposed for flood resilient housing models, in which there were identified key criteria that housing should meet. The same methodology is based in the US Federal Emergency Management Agency requirements and recommendations in accordance to specific flood zones. Finally, a case study in Maldives – one of the most vulnerable countries to sea level rise resulting from climate change – has been analyzed in light of housing recovery in a post-disaster induced scenario. This analysis was carried out by using the proposed methodology with the intent of assessing the resilience of the newly built housing to floods in the aftermath of the 2004 Indian Ocean Tsunami.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Management

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In broad sense, Project Financing1 as a mean of financing large scale infrastructural projects worldwide has had a steady growth in popularity for the last 20 years. This growth has been relatively unscathed from most economic cycles. However in the wake of the 2007 systemic Financial Crisis, Project Financing was also in trouble. The liquidity freeze and credit crunch that ensued affected all parties involved. Traditional Lenders, of this type of financial instrument, locked-in long-term contractual obligations, were severely hit with scarcity of funding compounded by rapidly increasing cost of funding. All the while, Banks were “rescued” by the concerted actions of Central Banks and other Multi-Lateral Agencies around the world but at the same time “stressed” by upcoming regulatory effort (Basel Committee). This impact resulted in specific changes to this type of long-term financing. Changes such as Commercial Banks’ increased risk aversion; pricing increase and maturities decrease of credit facilities; enforcement of Market Disruption Event clauses; partial responsibility for project risk by Multilateral Agencies; and adoption of utility-like availability payments in other industrial sectors such as transportation and even social infrastructure. To the extent possible, this report is then divided in three parts. First, it begins with a more instructional part, touching academic literature (theory) and giving the Banks perspective (practice), but mostly as an overview of Project Finance for awareness’ sake. The renowned Harvard Business School professor – Benjamin Esty, states2 that Project Finance is a “relatively unexplored territory for both empirical and theoretical research” which means that academic research efforts are lagging the practice of Project Finance. Second, the report presents a practical case regarding the first Road Concession in Portugal in 1998 ending with the lessons learned 10 years after Financial Close. Lastly, the report concludes with the analysis of the current trends and changes to the industry post Financial Crisis of the late 2000’s. To achieve this I’ll reference relevant papers, books on the subject, online articles and my own experience in the Project Finance Department at a major Portuguese Investment Bank. Regarding the latter, with the signing of a confidentiality agreement, I’m duly omitting sensitive and proprietary bank information.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Double Degree