29 resultados para implementation of shared services


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação apresentada para obtenção do Grau de Mestre em Engenharia Electrotécnica e de Computadores, pela Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Finance from the NOVA – School of Business and Economics

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Work Project studies the Continuous Improvement and Processes (CIP) department at TAP Maintenance & Engineering. The project has the objective to provide insights to align the activities of the department with the strategy of the organization. For such, two focuses were taken: (i) an internal analysis which highlighted a need for transversal change to ensure the adoption of Continuous Improvement at TAP, and (ii) a process which outlined objectives and projects to be pursued to prioritize CIP’s activities in accordance with the organization’s goals. The outcome includes (a) important recommendations concerning strategic planning and competition evaluation and (b) a process’ output that reflects a balance among factors influencing the priority of projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

‘’Fruta com Cheiro’’ is an idea for a new brand of fruit that would be introduced in the Portuguese market that would differentiate itself from the brands already in the market and from other non-branded fruit producers. In order to prove that the idea was valid and would have a place in the market, two methods of exploratory research were used – in-depth interviews and focus groups – to understand attitudes and behaviors regarding fruit selection and purchase and also people’s perceptions to ‘’Fruta com Cheiro’’. After these two steps, several considerations were made in relation to preliminary marketing aspects such as brand creation and positioning. There was also a final remark on the fact that this thesis is not a business plan and its purpose was to show how viable would the project be.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An energy harvesting system requires an energy storing device to store the energy retrieved from the surrounding environment. This can either be a rechargeable battery or a supercapcitor. Due to the limited lifetime of rechargeable batteries, they need to be periodically replaced. Therefore, a supercapacitor, which has ideally a limitless number of charge/discharge cycles can be used to store the energy; however, a voltage regulator is required to obtain a constant output voltage as the supercapacitor discharges. This can be implemented by a Switched-Capacitor DC-DC converter which allows a complete integration in CMOS technology, although it requires several topologies in order to obtain a high efficiency. This thesis presents the complete analysis of four different topologies in order to determine expressions that allow to design and determine the optimum input voltage ranges for each topology. To better understand the parasitic effects, the implementation of the capacitors and the non-ideal effect of the switches, in 130 nm technology, were carefully studied. With these two analysis a multi-ratio SC DC-DC converter was designed with an output power of 2 mW, maximum efficiency of 77%, and a maximum output ripple, in the steady state, of 23 mV; for an input voltage swing of 2.3 V to 0.85 V. This proposed converter has four operation states that perform the conversion ratios of 1/2, 2/3, 1/1 and 3/2 and its clock frequency is automatically adjusted to produce a stable output voltage of 1 V. These features are implemented through two distinct controller circuits that use asynchronous time machines (ASM) to dynamically adjust the clock frequency and to select the active state of the converter. All the theoretical expressions as well as the behaviour of the whole system was verified using electrical simulations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

ABSTRACT - Objectives: We attempted to show how the implementation of the key elements of the World Health Organization Patient Safety Curriculum Guide Multi-professional Edition in an undergraduate curriculum affected the knowledge, skills, and attitudes towards patient safety in a graduate entry Portuguese Medical School. Methods: After receiving formal recognition by the WHO as a Complementary Test Site and approval of the organizational ethics committee , the validated pre-course questionnaires measuring the knowledge, skills, and attitudes to patient safety were administered to the 2nd and3rd year students pursuing a four-year course (N = 46). The key modules of the curriculum were implemented over the academic year by employing a variety of learning strategies including expert lecturers, small group problem-based teaching sessions, and Simulation Laboratory sessions. The identical questionnaires were then administered and the impact was measured. The Curriculum Guide was evaluated as a health education tool in this context. Results: A significant number of the respondents, 47 % (n = 22), reported having received some form of prior patient safety training. The effect on Patient Safety Knowledge was assessed by using the percentage of correct pre- and post-course answers to construct 2 × 2 contingency tables and by applying Fishers’ test (two-tailed). No significant differences were detected (p < 0.05). To assess the effect of the intervention on Patient Safety skills and attitudes, the mean and standard deviation were calculated for the pre and post-course responses, and independent samples were subjected to Mann-Whitney’s test. The attitudinal survey indicated a very high baseline incidence of desirable attitudes and skills toward patient safety. Significant changes were detected (p < 0.05) regarding what should happen if an error is made (p = 0.016), the role of healthcare organizations in error reporting (p = 0.006), and the extent of medical error (p = 0.005). Conclusions: The implementation of selected modules of the WHO Patient Safety Curriculum was associated with a number of positive changes regarding patient safety skills and attitudes, with a baseline incidence of highly desirable patient safety attitudes, but no measureable change on the patient safety knowledge, at the University of Algarve Medical School. The significance of these results is discussed along with implications and suggestions for future research.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The EM3E Master is an Education Programme supported by the European Commission, the European Membrane Society (EMS), the European Membrane House (EMH), and a large international network of industrial companies, research centres and universities (http://www.em3e.eu)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present Working Project aims at studying the topic of assurance mapping in a specific organizational context of a Portuguese retail company. For this purpose, an assurance map framework was designed to support the decision making process of stakeholders, through the delivery of comfort concerning risks, operations and control. In the end, the framework was successfully implemented for the process sourcing of goods in two business units of the company. Although, further implementation of the framework proved not to be feasible during the project’s timespan, it is expected to occur in the near future.