6 resultados para resource based view
em Instituto Politécnico do Porto, Portugal
Resumo:
Understanding the determinants of international performance, and in particular, export performance is key for the success of international companies. Research in this area focuses mainly on how resources and capabilities allow companies to gain competitive advantage and superior performance in external markets. Building on the Resource-Based View (RBV) and the Dynamic Capabilities Approach (DCA), this study aims at analysing the effect of intangible resources and capabilities on export performance. Specifically, this study focuses on the proposition that entrepreneurial orientation potentiates the attraction of intangible resources, namely relational and informational resources. Moreover, we propose that these resources impact export performance both directly and indirectly through dynamic capabilities.
Resumo:
Aim of the paper: The purpose of this paper is to examine human resources management practices (HRM practices) in small firms and to improve the understanding of the relationship between this kind of practices and business growth. This exploratory study is based on the resource-based view of the firm and empirical work carried out in two small firms by relating HRM practices with the firms’ results. Contribution to the literature: This is an in-depth study of HRM practices and its impact on performance growth in micro firms, isolating and controlling for most of the contextual and internal variables considered in the literature that relate HRM to growth. Firm growth analysis was broadened by the use of several dependent variables: employment growth and operational and financial performance growth. Some hypotheses for further research in identifying HRM practices in small business and its relation with firm growth are suggested. Methodology: Case study methodology was used to study two firms. The techniques used to collect data were semi-structured interviews to the owner and all the employees, unstructured observation at the firms’ facilities (during two days), entrepreneur profile definition (survey answer) and document data collection (on demographic characterization and performance results). Data was analyzed through content analysis methodology, and categories derived from the interviews’ protocols and literature. Results and implications: Results revealed that despite the firms’ organizational characteristics similarities, they differ significantly in owners’ motivation to grow, HRM practices and organizational performance and growth. Future studies should pay special attention to owner willingness to grow, to firms’ years of experience in business, to staff’s years of experience in their field of work and turnover. HRM practices in micro/small firms should be better defined and characterized. The external image of management posture relating to longitudinal financial results and growth should also be explored.
Resumo:
The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.
Resumo:
This paper proposes a simulated annealing (SA) approach to address energy resources management from the point of view of a virtual power player (VPP) operating in a smart grid. Distributed generation, demand response, and gridable vehicles are intelligently managed on a multiperiod basis according to V2G user´s profiles and requirements. Apart from using the aggregated resources, the VPP can also purchase additional energy from a set of external suppliers. The paper includes a case study for a 33 bus distribution network with 66 generators, 32 loads, and 1000 gridable vehicles. The results of the SA approach are compared with a methodology based on mixed-integer nonlinear programming. A variation of this method, using ac load flow, is also used and the results are compared with the SA solution using network simulation. The proposed SA approach proved to be able to obtain good solutions in low execution times, providing VPPs with suitable decision support for the management of a large number of distributed resources.
Resumo:
Future distribution systems will have to deal with an intensive penetration of distributed energy resources ensuring reliable and secure operation according to the smart grid paradigm. SCADA (Supervisory Control and Data Acquisition) is an essential infrastructure for this evolution. This paper proposes a new conceptual design of an intelligent SCADA with a decentralized, flexible, and intelligent approach, adaptive to the context (context awareness). This SCADA model is used to support the energy resource management undertaken by a distribution network operator (DNO). Resource management considers all the involved costs, power flows, and electricity prices, allowing the use of network reconfiguration and load curtailment. Locational Marginal Prices (LMP) are evaluated and used in specific situations to apply Demand Response (DR) programs on a global or a local basis. The paper includes a case study using a 114 bus distribution network and load demand based on real data.
Resumo:
This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.