2 resultados para geographic variation

em Instituto Politécnico do Porto, Portugal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we study the modifications that occurred in some forest soil properties after a prescribed fire. The research focused on the alterations of soil pH, soil moisture and soil organic matter content during a two-year span, from 2008 to 2009. The study site is located in Anjos, Vieira do Minho municipality, a forest site that has suffered from recurrent wildfires for several decades. Furze (Ulex, sp.), broom (Cytisus, sp.), gorse (Chamaespartum tridentatum) and a very few disperse adult pine (Pinus sylvestris) are the predominant vegetation type in the study area. The average height of this shrub vegetation is around 1.5 m. The prescribed fire was conducted by the National Forestry Authority (AFN) in November 2008. Fuzzy Boolean Nets (FBN) were used to evaluate the alteration in soil parameters when compared with adjacent spots where: i) no fire occurrence was registered since 1998; ii) fire occurrence was registered in 2008; and iii) vegetation pruning by mechanical cut was done in Spring six months prior to the prescribed fire event. Results suggest that in the particular case of the studied site, Anjos, the observed soil properties alterations cannot be related with the prescribed fire.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The intensive use of distributed generation based on renewable resources increases the complexity of power systems management, particularly the short-term scheduling. Demand response, storage units and electric and plug-in hybrid vehicles also pose new challenges to the short-term scheduling. However, these distributed energy resources can contribute significantly to turn the shortterm scheduling more efficient and effective improving the power system reliability. This paper proposes a short-term scheduling methodology based on two distinct time horizons: hour-ahead scheduling, and real-time scheduling considering the point of view of one aggregator agent. In each scheduling process, it is necessary to update the generation and consumption operation, and the storage and electric vehicles status. Besides the new operation condition, more accurate forecast values of wind generation and consumption are available, for the resulting of short-term and very short-term methods. In this paper, the aggregator has the main goal of maximizing his profits while, fulfilling the established contracts with the aggregated and external players.