5 resultados para floor plans
em Instituto Politécnico do Porto, Portugal
Resumo:
International guidelines recommend a first line therapy in the treatment of female stress urinary incontinence (SUI), the pelvic floor muscle (PFM) training. This case report assesses the effects of the PFM training program in treating women with severe SUI. The urodynamic parameters allow diagnosed intrinsic sphincter deficiency and urethral hypermobility. The subjective and objective parameters were assessed at the beginning and after six-month of PFM training program. This case report confirms the efficiency of the intensive training program in severe SUI. The medical implications of the PFM training as first treatment option reflect favourable individual results and additionally contribute to the selection of the non-invasive treatment, the reduction of the incidence collateral effects, low costs and that does not prevent future treatment options.
Resumo:
In this paper we describe a real-time industrial communication network able to support both controlrelated and multimedia traffic. The industrial communication network is based on the PROFIBUS standard, with multimedia capabilities being provided by an adequate integration of TCP/IP protocols into the PROFIBUS stack. From the operational point of view the integration of TCP/IP into PROFIBUS is by itself a challenge, since the master-slave nature of the PROFIBUS MAC makes complex the implementation of the symmetry inherent to IP communications. From the timeliness point of view the challenge is two folded. On one hand the multimedia traffic should not interfere with the timing requirements of the "native" control-related PROFIBUS traffic (typically hard real-time). On the other hand multimedia traffic requires certain levels of quality-of-service to be attained. In this paper we provide a methodology that enables fulfilling the timing requirements for both types of traffic in these real-time industrial LAN. Moreover, we describe suitable algorithms for the scheduling support of concurrent multimedia streams.
Resumo:
In the past few years, a significant amount of work has been devoted to the timing analysis of Ethernet-based technologies. However, none of these address the problem of timeliness evaluation at a holistic level. This paper describes a research framework embracing this objective. It is advocated that, simulation models can be a powerful tool, not only for timeliness evaluation, but also to enable the introduction of less pessimistic assumptions in an analytical response time approach, which, most often, are afflicted with simplifications leading to pessimistic assumptions and, therefore, delusive results. To this end, we address a few inter-linked research topics with the purpose of setting a framework for developing tools suitable to extract temporal properties of commercial-off-the-shelf (COTS) factory-floor communication systems.
Resumo:
Field communication systems (fieldbuses) are widely used as the communication support for distributed computer-controlled systems (DCCS) within all sort of process control and manufacturing applications. There are several advantages in the use of fieldbuses as a replacement for the traditional point-to-point links between sensors/actuators and computer-based control systems, within which the most relevant is the decentralisation and distribution of the processing power over the field. A widely used fieldbus is the WorldFIP, which is normalised as European standard EN 50170. Using WorldFIP to support DCCS, an important issue is “how to guarantee the timing requirements of the real-time traffic?” WorldFIP has very interesting mechanisms to schedule data transfers, since it explicitly distinguishes periodic and aperiodic traffic. In this paper, we describe how WorldFIP handles these two types of traffic, and more importantly, we provide a comprehensive analysis on how to guarantee the timing requirements of the real-time traffic.
Resumo:
The painting activity is one of the most complex and important activities in automobile manufacturing. The inherent complexity of the painting activity and the frequent need for repainting usually turn the painting process into a bottleneck in automobile assembly plants, which is reflected in higher operating costs and longer overall cycle times. One possible approach for optimizing the performance of the paint shop is to improve the efficiency of the color planning. This can be accomplished by evaluating the relative merits of a set of vehicle painting plans. Since this problem has a multicriteria nature, we resort to the multicriteria decision analysis (MCDA) methodology to tackle it. A recent trend in the MCDA field is the development of hybrid approaches that are used to achieve operational synergies between different methods. Here we apply, for the first time, an integrated approach that combines the strengths of the analytic hierarchy process (AHP) and the Preference Ranking Organization METHod for Enrichment Evaluations (PROMETHEE), aided by Geometrical Analysis for Interactive Aid (GAIA), to the problem of assessing alternative vehicle painting plans. The management of the assembly plant found the results of value and is currently using them in order to schedule the painting activities such that an enhancement of the operational efficiency of the paint shop is obtained. This efficiency gain has allowed the management to bid for a new automobile model to be assembled at this specific plant.