5 resultados para exploit

em Instituto Politécnico do Porto, Portugal


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Learning and teaching processes, like all human activities, can be mediated through the use of tools. Information and communication technologies are now widespread within education. Their use in the daily life of teachers and learners affords engagement with educational activities at any place and time and not necessarily linked to an institution or a certificate. In the absence of formal certification, learning under these circumstances is known as informal learning. Despite the lack of certification, learning with technology in this way presents opportunities to gather information about and present new ways of exploiting an individual’s learning. Cloud technologies provide ways to achieve this through new architectures, methodologies, and workflows that facilitate semantic tagging, recognition, and acknowledgment of informal learning activities. The transparency and accessibility of cloud services mean that institutions and learners can exploit existing knowledge to their mutual benefit. The TRAILER project facilitates this aim by providing a technological framework using cloud services, a workflow, and a methodology. The services facilitate the exchange of information and knowledge associated with informal learning activities ranging from the use of social software through widgets, computer gaming, and remote laboratory experiments. Data from these activities are shared among institutions, learners, and workers. The project demonstrates the possibility of gathering information related to informal learning activities independently of the context or tools used to carry them out.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In real-time systems, there are two distinct trends for scheduling task sets on unicore systems: non-preemptive and preemptive scheduling. Non-preemptive scheduling is obviously not subject to any preemption delay but its schedulability may be quite poor, whereas fully preemptive scheduling is subject to preemption delay, but benefits from a higher flexibility in the scheduling decisions. The time-delay involved by task preemptions is a major source of pessimism in the analysis of the task Worst-Case Execution Time (WCET) in real-time systems. Preemptive scheduling policies including non-preemptive regions are a hybrid solution between non-preemptive and fully preemptive scheduling paradigms, which enables to conjugate both world's benefits. In this paper, we exploit the connection between the progression of a task in its operations, and the knowledge of the preemption delays as a function of its progression. The pessimism in the preemption delay estimation is then reduced in comparison to state of the art methods, due to the increase in information available in the analysis.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Preemptions account for a non-negligible overhead during system execution. There has been substantial amount of research on estimating the delay incurred due to the loss of working sets in the processor state (caches, registers, TLBs) and some on avoiding preemptions, or limiting the preemption cost. We present an algorithm to reduce preemptions by further delaying the start of execution of high priority tasks in fixed priority scheduling. Our approaches take advantage of the floating non-preemptive regions model and exploit the fact that, during the schedule, the relative task phasing will differ from the worst-case scenario in terms of admissible preemption deferral. Furthermore, approximations to reduce the complexity of the proposed approach are presented. Substantial set of experiments demonstrate that the approach and approximations improve over existing work, in particular for the case of high utilisation systems, where savings of up to 22% on the number of preemption are attained.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dissertação de Mestrado Apresentado ao Instituto de Contabilidade e Administração do Porto para a obtenção do grau de Mestre em Marketing Digital, sob orientação de Professor Doutor Freitas Santos

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O BIM – Building Information Modeling – é um conceito de controlo e gestão de informação desenvolvida, entre diferentes especialidades e intervenientes envolventes, durante o ciclo de vida das construções. A utilização das tecnologias BIM, no ramo da Engenharia Mecânica e Civil, tem sido uma aposta constante, e cada vez mais concisa, nos projetos de construção. A justificação para a adoção destas metodologias mais eficientes, em substituição dos processos convencionais, prende-se com o facto desses processos convencionais, ainda hoje, apresentarem muitas dificuldades e problemas associados, por exemplo, à falta de comunicação entre os intervenientes e ao ineficiente controlo na gestão de projetos. O objetivo desta dissertação centra-se na análise da interoperabilidade de softwares BIM, ou seja, na verificação da viabilidade de exportação de dados dos modelos produzidos, entre as ferramentas BIM. Para este campo de ação contribuirá a análise da passagem de informação, relativa ao modelo de uma Nave Industrial modelada, em alguns dos softwares BIM, correntemente mais utilizados. O conhecimento adquirido com a modelação do caso de estudo do presente trabalho irá permitir identificar algumas lacunas existentes ao nível da falta de recomendações práticas que sirvam de orientação na modelação recorrendo a ferramentas informáticas BIM-compatíveis. Assim, a base deste trabalho consiste na criação de uma série de recomendações ou de um roteiro de modelação em específico para a disciplina de estruturas enquanto área de aplicação concreta do estudo efetuado. Nesse sentido, a proposta deste trabalho é de apresentar alguns critérios de modelação onde são definidos os elementos a modelar em cada fase do projeto.