4 resultados para data movement problem

em Instituto Politécnico do Porto, Portugal


Relevância:

30.00% 30.00%

Publicador:

Resumo:

In recent years, Power Systems (PS) have experimented many changes in their operation. The introduction of new players managing Distributed Generation (DG) units, and the existence of new Demand Response (DR) programs make the control of the system a more complex problem and allow a more flexible management. An intelligent resource management in the context of smart grids is of huge important so that smart grids functions are assured. This paper proposes a new methodology to support system operators and/or Virtual Power Players (VPPs) to determine effective and efficient DR programs that can be put into practice. This method is based on the use of data mining techniques applied to a database which is obtained for a large set of operation scenarios. The paper includes a case study based on 27,000 scenarios considering a diversity of distributed resources in a 32 bus distribution network.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

To maintain a power system within operation limits, a level ahead planning it is necessary to apply competitive techniques to solve the optimal power flow (OPF). OPF is a non-linear and a large combinatorial problem. The Ant Colony Search (ACS) optimization algorithm is inspired by the organized natural movement of real ants and has been successfully applied to different large combinatorial optimization problems. This paper presents an implementation of Ant Colony optimization to solve the OPF in an economic dispatch context. The proposed methodology has been developed to be used for maintenance and repairing planning with 48 to 24 hours antecipation. The main advantage of this method is its low execution time that allows the use of OPF when a large set of scenarios has to be analyzed. The paper includes a case study using the IEEE 30 bus network. The results are compared with other well-known methodologies presented in the literature.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Cluster scheduling and collision avoidance are crucial issues in large-scale cluster-tree Wireless Sensor Networks (WSNs). The paper presents a methodology that provides a Time Division Cluster Scheduling (TDCS) mechanism based on the cyclic extension of RCPS/TC (Resource Constrained Project Scheduling with Temporal Constraints) problem for a cluster-tree WSN, assuming bounded communication errors. The objective is to meet all end-to-end deadlines of a predefined set of time-bounded data flows while minimizing the energy consumption of the nodes by setting the TDCS period as long as possible. Sinceeach cluster is active only once during the period, the end-to-end delay of a given flow may span over several periods when there are the flows with opposite direction. The scheduling tool enables system designers to efficiently configure all required parameters of the IEEE 802.15.4/ZigBee beaconenabled cluster-tree WSNs in the network design time. The performance evaluation of thescheduling tool shows that the problems with dozens of nodes can be solved while using optimal solvers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Introdução: A síndrome dolorosa miofascial é um dos principais problemas encontrados na prática clínica, tendo como principais características os pontos gatilho (PG), ativos ou latentes. Os PG latentes têm uma elevada prevalência na musculatura da cintura escapular, nomeadamente ao nível do trapézio superior (TS), influenciando o controlo motor do ombro. A compressão isquémica aplicada no PG do TS poderá influenciar o comportamento muscular dos sinergistas durante o movimento de abdução no plano da omoplata. Objetivos: Este estudo visa estudar a influência da compressão isquémica aplicada no PG do TS na magnitude de ativação dos músculos TS, trapézio inferior (TI), grande dentado (GD), infra-espinhoso (IE) e deltóide médio (DM), assim como a relação muscular através da razão entre o TS e os restantes músculos em análise, durante o movimento de abdução no plano da omoplata. Métodos: O presente estudo é experimental, aleatório e controlado. Foram criados dois grupos, grupo controlo (GC) (n=14) e grupo experimental (GE) (n=15), a partir de uma amostra de 67 indivíduos. No GC foi aplicado um procedimento placebo e no GE foi aplicada no PG latente do TS a técnica de compressão isquémica. Antes e após a intervenção foi recolhida a atividade eletromiográfica dos músculos em análise, assim como os dados cinemáticos, durante o movimento de elevação do ombro no plano da omoplata. Para a análise registou-se a amplitude máxima de abdução e foi analisada a atividade muscular individual dos músculos em estudo assim como a razão entre o TS e os restantes músculos. Esta análise foi realizada em intervalos de 30° até ao final do movimento. Resultados: Não se verificaram diferenças na amplitude máxima de abdução, nem entre grupos (1º momento p=0,608, t=0,816; 2º momento p=0,119; t=1,252) nem entre os dois momentos em cada grupo (GC, t=-1,119; p=0,256; GE, t=-1,604, p=0,135). Na magnitude de ativação individual de cada músculo também não se verificaram diferenças significativas com a aplicação da técnica, tendo-se verificado no DM uma tendência para o aumento da ativação aquando da intervenção, ao longo de todo o arco de movimento, em comparação com a pré-intervenção, já no GC de controlo não se verificaram alterações entre momentos. Também na análise da razão entre músculos não se verificaram diferenças entre grupos. Conclusão: A intervenção realizada não influenciou nenhum dos parâmetros em análise do complexo articular do ombro nem a amplitude de movimento de abdução.