3 resultados para case characteristics
em Instituto Politécnico do Porto, Portugal
Resumo:
Despite a massive expansion of education in Portugal, since the 1970’s, educational attainment of the adult population in the country remains low. The numbers of working-age people in some form of continuing education are among the lowest, according to the OECD and EU-27 statistics. Technological Schools(TS), initially created in the 1990’s, under the umbrella of the Ministry of Economy in partnership with industry and industrial associations, aimed to prepare qualified staff for industries and services in the country, particularly in the engineering sector, through the provision of post secondary non-university programmes of studies, the CET (Technological Specialization Courses). Successful CET students are awarded a DET(Diploma of Technological Specialization), which corresponds to Vocational Qualification level IV of the EU, according to the latest alteration (2005) of the Education Systems Act (introduced in 1986). In this, CET’s are also clearly defined as one of the routes for access to Higher Education (HE), in Portugal. The PRILHE (Promoting Reflective and Independent Learning in Higher Education) multinational project, funded by the European Socrates Grundtvig Programme, aimed to identify the learning processes which enable adult students in higher education to become autonomous reflective learners and search best practices to support these learning processes. During this research, both quantitative and qualitative methods were used to determine how students organise their studies and develop their learning skills. The Portuguese partner in the project’ consortium used a two case studies approach, one with students of Higher Education Institutions and other with students of TS. This paper only applies to students of TS, as these have a predominant bias towards engineering. Results show that student motivation and professional teaching support contribute equally to the development of an autonomous and reflective approach to learning in adult students; this is essential for success in a knowledge economy, where lifelong learning is the key to continuous employment.
Resumo:
Time-sensitive Wireless Sensor Network (WSN) applications require finite delay bounds in critical situations. This paper provides a methodology for the modeling and the worst-case dimensioning of cluster-tree WSNs. We provide a fine model of the worst-case cluster-tree topology characterized by its depth, the maximum number of child routers and the maximum number of child nodes for each parent router. Using Network Calculus, we derive “plug-and-play” expressions for the endto- end delay bounds, buffering and bandwidth requirements as a function of the WSN cluster-tree characteristics and traffic specifications. The cluster-tree topology has been adopted by many cluster-based solutions for WSNs. We demonstrate how to apply our general results for dimensioning IEEE 802.15.4/Zigbee cluster-tree WSNs. We believe that this paper shows the fundamental performance limits of cluster-tree wireless sensor networks by the provision of a simple and effective methodology for the design of such WSNs.
Resumo:
The integration of growing amounts of distributed generation in power systems, namely at distribution networks level, has been fostered by energy policies in several countries around the world, including in Europe. This intensive integration of distributed, non-dispatchable, and natural sources based generation (including wind power) has caused several changes in the operation and planning of power systems and of electricity markets. Sometimes the available non-dispatchable generation is higher than the demand. This generation must be used; otherwise it is wasted if not stored or used to supply additional demand. New policies and market rules, as well as new players, are needed in order to competitively integrate all the resources. The methodology proposed in this paper aims at the maximization of the social welfare in a distribution network operated by a virtual power player that aggregates and manages the available energy resources. When facing a situation of excessive non-dispatchable generation, including wind power, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. This method is especially useful when actual and day-ahead resources forecast differ significantly. The distribution network characteristics and concerns are addressed by including the network constraints in the optimization model. The proposed methodology has been implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20.310 consumers and 548 distributed generators, some of them non-dispatchable and with must take contracts. The implemented scenario corresponds to a real day in Portuguese power system.