8 resultados para War, Cost of

em Instituto Politécnico do Porto, Portugal


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The present work aims at evaluating the efficiency of an organic polymer from vegetal source used as coagulant for treating different types of industrial effluents. This coagulant (Flox-QT) is obtained from the Black Acacia (Acacia mearnsii). The effluents studied were produced in petrochemical, leather, cork stoppers, metalworking, olive oil, glue, paint (printing), textile and paper industries. The parameters analyzed in the effluents before and after treatment were selected according to the type of wastewater and included pH, conductivity, apparent colour, turbidity, total suspended solids (TSS), chemical oxygen demand (COD) and some metals. The coagulant proved to be efficient for almost all effluents tested. The best results were obtained for the paper industry wastewater, with 91% removal of chemical oxygen demand and 95% of total suspended solids removal. The estimated cost of this treatment would be only 0.24 Euro per cubic meter of treated effluent, only regarding the price of the coagulant and the required dosage. The use of this coagulant is also adequate for the valorisation of the sludge obtained, which in this case could be recycled for paper production.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The presented work was conducted within the Dissertation / Internship, branch of Environmental Protection Technology, associated to the Master thesis in Chemical Engineering by the Instituto Superior de Engenharia do Porto and it was developed in the Aquatest a.s, headquartered in Prague, in Czech Republic. The ore mining exploitation in the Czech Republic began in the thirteenth century, and has been extended until the twentieth century, being now evident the consequences of the intensive extraction which includes contamination of soil and sub-soil by high concentrations of heavy metals. The mountain region of Zlaté Hory was chosen for the implementation of the remediation project, which consisted in the construction of three cells (tanks), the first to raise the pH, the second for the sedimentation of the formed precipitates and a third to increase the process efficiency in order to reduce high concentrations of metals, with special emphasis on iron, manganese and sulfates. This project was initiated in 2005, being pioneer in this country and is still ongoing due to the complex chemical and biological phenomenon’s inherent to the system. At the site where the project was implemented, there is a natural lagoon, thereby enabling a comparative study of the two systems (natural and artificial) regarding the efficiency of both in the reduction/ removal of the referred pollutants. The study aimed to assist and cooperate in the ongoing investigation at the company Aquatest, in terms of field work conducted in Zlaté Hory and in terms of research methodologies used in it. Thereby, it was carried out a survey and analysis of available data from 2005 to 2008, being complemented by the treatment of new data from 2009 to 2010. Moreover, a theoretical study of the chemical and biological processes that occurs in both systems was performed. Regarding the field work, an active participation in the collection and in situ sample analyzing of water and soil from the natural pond has been attained, with the supervision of Engineer, Irena Šupiková. Laboratory analysis of water and soil were carried out by laboratory technicians. It was found that the natural lagoon is more efficient in reducing iron and manganese, being obtained removal percentages of 100%. The artificial lagoon had a removal percentage of 90% and 33% for iron and manganese respectively. Despite the minor efficiency of the constructed wetland, it must be pointed out that this system was designed for the treatment and consequent reduction of iron. In this context, it can conclude that the main goal has been achieved. In the case of sulphates, the removal optimization is yet a goal to be achieved not only in the Czech Republic but also in other places where this type of contamination persists. In fact, in the natural lagoon and in the constructed wetland, removal efficiencies of 45% and 7% were obtained respectively. It has been speculated that the water at the entrance of both systems has different sources. The analysis of the collected data shows at the entrance of the natural pond, a concentration of 4.6 mg/L of total iron, 14.6 mg/L of manganese and 951 mg/L of sulphates. In the artificial pond, the concentrations are 27.7 mg/L, 8.1 mg/L and 382 mg/L respectively for iron, manganese and sulphates. During 2010 the investigation has been expanded. The study of soil samples has started in order to observe and evaluate the contribution of bacteria in the removal of heavy metals being in its early phase. Summarizing, this technology has revealed to be an interesting solution, since in addition to substantially reduce the mentioned contaminants, mostly iron, it combines the low cost of implementation with an reduced maintenance, and it can also be installed in recreation parks, providing habitats for plants and birds.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The introduction of electricity markets and integration of Distributed Generation (DG) have been influencing the power system’s structure change. Recently, the smart grid concept has been introduced, to guarantee a more efficient operation of the power system using the advantages of this new paradigm. Basically, a smart grid is a structure that integrates different players, considering constant communication between them to improve power system operation and management. One of the players revealing a big importance in this context is the Virtual Power Player (VPP). In the transportation sector the Electric Vehicle (EV) is arising as an alternative to conventional vehicles propel by fossil fuels. The power system can benefit from this massive introduction of EVs, taking advantage on EVs’ ability to connect to the electric network to charge, and on the future expectation of EVs ability to discharge to the network using the Vehicle-to-Grid (V2G) capacity. This thesis proposes alternative strategies to control these two EV modes with the objective of enhancing the management of the power system. Moreover, power system must ensure the trips of EVs that will be connected to the electric network. The EV user specifies a certain amount of energy that will be necessary to charge, in order to ensure the distance to travel. The introduction of EVs in the power system turns the Energy Resource Management (ERM) under a smart grid environment, into a complex problem that can take several minutes or hours to reach the optimal solution. Adequate optimization techniques are required to accommodate this kind of complexity while solving the ERM problem in a reasonable execution time. This thesis presents a tool that solves the ERM considering the intensive use of EVs in the smart grid context. The objective is to obtain the minimum cost of ERM considering: the operation cost of DG, the cost of the energy acquired to external suppliers, the EV users payments and remuneration and penalty costs. This tool is directed to VPPs that manage specific network areas, where a high penetration level of EVs is expected to be connected in these areas. The ERM is solved using two methodologies: the adaptation of a deterministic technique proposed in a previous work, and the adaptation of the Simulated Annealing (SA) technique. With the purpose of improving the SA performance for this case, three heuristics are additionally proposed, taking advantage on the particularities and specificities of an ERM with these characteristics. A set of case studies are presented in this thesis, considering a 32 bus distribution network and up to 3000 EVs. The first case study solves the scheduling without considering EVs, to be used as a reference case for comparisons with the proposed approaches. The second case study evaluates the complexity of the ERM with the integration of EVs. The third case study evaluates the performance of scheduling with different control modes for EVs. These control modes, combined with the proposed SA approach and with the developed heuristics, aim at improving the quality of the ERM, while reducing drastically its execution time. The proposed control modes are: uncoordinated charging, smart charging and V2G capability. The fourth and final case study presents the ERM approach applied to consecutive days.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Wind energy is considered a hope in future as a clean and sustainable energy, as can be seen by the growing number of wind farms installed all over the world. With the huge proliferation of wind farms, as an alternative to the traditional fossil power generation, the economic issues dictate the necessity of monitoring systems to optimize the availability and profits. The relatively high cost of operation and maintenance associated to wind power is a major issue. Wind turbines are most of the time located in remote areas or offshore and these factors increase the referred operation and maintenance costs. Good maintenance strategies are needed to increase the health management of wind turbines. The objective of this paper is to show the application of neural networks to analyze all the wind turbine information to identify possible future failures, based on previous information of the turbine.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Existing work in the context of energy management for real-time systems often ignores the substantial cost of making DVFS and sleep state decisions in terms of time and energy and/or assume very simple models. Within this paper we attempt to explore the parameter space for such decisions and possible constraints faced.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A methodology to increase the probability of delivering power to any load point through the identification of new investments in distribution network components is proposed in this paper. The method minimizes the investment cost as well as the cost of energy not supplied in the network. A DC optimization model based on mixed integer non-linear programming is developed considering the Pareto front technique in order to identify the adequate investments in distribution networks components which allow increasing the probability of delivering power for any customer in the distribution system at the minimum possible cost for the system operator, while minimizing the energy not supplied cost. Thus, a multi-objective problem is formulated. To illustrate the application of the proposed methodology, the paper includes a case study which considers a 180 bus distribution network

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The electric utilities have large revenue losses annually due to commercial losses, which are caused mainly by fraud on the part of consumers and faulty meters. Automatic detection of such losses where there is a complex problem, given the large number of consumers and the high cost of each inspection, not to mention the wear of the relationship between company and consumer. Given the above, this paper aims to briefly present some methodologies applied by utilities to identify consumer frauds.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Azores archipelago is a zone with a vast cultural heritage, presenting a building stock mainly constructed in traditional stone masonry. It is known that this type of construction exhibits poor behaviour under seismic excitations; however it is extensively used in seismic prone areas, such as this case. The 9th of July of 1998 earthquake was the last seismic event in the islands, leaving many traditional stone constructions severely damaged or totally destroyed. This scenario led to an effort by the local government of improving the seismic resistance of these constructions, with the application of several reinforcement techniques. This work aims to study some of the most used reinforcement schemes after the 1998 earthquake, and to assess their effectiveness in the mitigation of the construction’s seismic vulnerability. A brief evaluation of the cost versus benefit of these retrofitting techniques is also made, seeking to identify those that are most suitable for each building typology. Thus, it was sought to analyze the case of real structures with different geometrical and physical characteristics, by establishing a comparison between the seismic performance of reinforced and non-reinforced structures. The first section contains the analysis of a total of six reinforcement scenarios for each building chosen. Using the recorded 1998 earthquake accelerograms, a linear time-history analysis was performed for each reinforcement scenario. A comparison was then established between the maximum displacements, inter-storey drift and maximum stress obtained, in order to evaluate the global seismic response of each reinforced structure. In the second part of the work, the examination of the performance obtained in the previous section, in relation to the cost of implementing each reinforcement technique, allowed to draw conclusions concerning the viability of implementing each reinforcement method, based on the book value of the buildings in study.