21 resultados para Vias bus way

em Instituto Politécnico do Porto, Portugal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In competitive electricity markets with deep concerns at the efficiency level, demand response programs gain considerable significance. In the same way, distributed generation has gained increasing importance in the operation and planning of power systems. Grid operators and utilities are taking new initiatives, recognizing the value of demand response and of distributed generation for grid reliability and for the enhancement of organized spot market´s efficiency. Grid operators and utilities become able to act in both energy and reserve components of electricity markets. This paper proposes a methodology for a joint dispatch of demand response and distributed generation to provide energy and reserve by a virtual power player that operates a distribution network. The proposed method has been computationally implemented and its application is illustrated in this paper using a 32 bus distribution network with 32 medium voltage consumers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increasing importance given by environmental policies to the dissemination and use of wind power has led to its fast and large integration in power systems. In most cases, this integration has been done in an intensive way, causing several impacts and challenges in current and future power systems operation and planning. One of these challenges is dealing with the system conditions in which the available wind power is higher than the system demand. This is one of the possible applications of demand response, which is a very promising resource in the context of competitive environments that integrates even more amounts of distributed energy resources, as well as new players. The methodology proposed aims the maximization of the social welfare in a smart grid operated by a virtual power player that manages the available energy resources. When facing excessive wind power generation availability, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. The proposed method is especially useful when actual and day-ahead wind forecast differ significantly. The proposed method has been computationally implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20310 consumers and 548 distributed generators, some of them with must take contracts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we present a Constraint Logic Programming (CLP) based model, and hybrid solving method for the Scheduling of Maintenance Activities in the Power Transmission Network. The model distinguishes from others not only because of its completeness but also by the way it models and solves the Electric Constraints. Specifically we present a efficient filtering algorithm for the Electrical Constraints. Furthermore, the solving method improves the pure CLP methods efficiency by integrating a type of Local Search technique with CLP. To test the approach we compare the method results with another method using a 24 bus network, which considerers 42 tasks and 24 maintenance periods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper aims to present a contrastive approach between three different ways of building concepts after proving the similar syntactic possibilities that coexist in terms. However, from the semantic point of view we can see that each language family has a different distribution in meaning. But the most important point we try to show is that the differences found in the psychological process when communicating concepts should guide the translator and the terminologist in the target text production and the terminology planning process. Differences between languages in the information transmission process are due to the different roles the different types of knowledge play. We distinguish here the analytic-descriptive knowledge and the analogical knowledge among others. We also state that none of them is the best when determining the correctness of a term, but there has to be adequacy criteria in the selection process. This concept building or term building success is important when looking at the linguistic map of the information society.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A empresa Petibol, S.A. – Embalagens de plástico centra-se na produção de embalagens de plástico a partir da matéria-prima Poliestireno Expandido (EPS) e Polipropileno Expandido (EPP). A empresa possui uma preocupação ao nível da qualidade da água e do aproveitamento energético, tendo desta forma surgido a realização do estudo na unidade industrial, com o objectivo de anular e/ou diminuir as possíveis lacunas existentes na unidade industrial. Numa primeira etapa foi realizada uma caracterização global à qualidade da água e à empresa, actualizando-se os esquemas já existentes, contabilizando-se os custos actuais relativamente aos processos no circuito da água (arrefecimento, aquecimento e pressurização), e por fim, efectuou-se um levantamento in loco do circuito de água, relativamente à pressão, temperatura e caudal. Numa fase posterior, foram propostos equipamentos e processos, tendo em vista a colmatação dos problemas identificados, realizando-se um subsequente estudo relativamente aos custos inerentes a esses novos processos. A caracterização à água foi avaliada em diferentes pontos do circuito industrial, tendo-se determinado na Sala de Bombagem que o filtro de areia não possuía as dimensões mais apropriadas, existindo também um problema a nível mecânico associado ao processo de contra-lavagem. Tais factos podem ser a causa da ocorrência de um aumento do teor de sólidos após a passagem na camada filtrante. Relativamente ao amaciador, este deveria amaciar de forma completa a água para alimentação à caldeira, embora se tenha registado à saída do amaciador uma dureza de 21,3 mg/L, denunciando problemas na troca iónica. No que toca à água de alimentação à caldeira, verifica-se a existência de parâmetros que não se encontram de acordo com os critérios enunciados para uma óptima qualidade, sendo eles o pH (10,14), condutividade (363 μS/cm), teor de ferro (1,21 mg/L) e a dureza (16 mg/L). De salientar que somente o teor de cobre, que se encontra em quantidades vestigiais, apresenta-se de acordo com os valores impostos. No que respeita à água da caldeira, esta apresenta parâmetros incompatíveis com os recomendados, sendo eles a condutividade (7350 μS/cm), teor de sólidos dissolvidos (5248 mg/L) e alcalinidade total (780 mg/L). De referir que o valor de pH (11,8) não se encontra de acordo com a aplicação do tratamento “fosfato-pH coordenado”. Em relação aos parâmetros com valores que se encontram dentro dos limites, estes correspondem à dureza (0 mg/L), ao teor de fosfatos (45 mg/L) e teor de sílica (0 mg/L). A água do circuito de arrefecimento foi sujeita a uma análise microbiológica, que corroborou a presença de um biofilme. Um dos problemas enunciados pela empresa, prendia-se com a impossibilidade de descarga, no colector municipal, dos condensados dos compressores, visto apresentarem uma quantidade de óleo de cerca de 43,3 mg/L, equivalente a quatro vezes o valor limite de emissão, de acordo com a legislação municipal. Por fim, o efluente de descarga industrial apresenta um valor de pH (10,3) acima do intervalo permitido por lei (6,0 – 9,0), sendo que a corrente que mais contribui para este acréscimo de pH corresponde à corrente proveniente da água de purga, visto esta apresentar um valor de pH de 12,22. De maneira a contornar os parâmetros enunciados, é proposto a substituição do filtro de areia da Sala de Bombagem, assim como a inserção de um conjunto de medidas de remoção de ferro e desinfecção, sendo a conjugação de arejamento, coagulação, filtração e desinfecção, por parte do hipoclorito, a proposta apresentada. Aos condensados dos compressores é apresentado um sistema de separação, que possibilita a remoção do óleo da água, e uma consequente descarga da mesma. Actualmente, não existe qualquer filtro de areia no circuito de arrefecimento da água, sendo proposto assim esse equipamento, de forma a minorar o desenvolvimento da população microbiana, bem como a permitir uma maior eficiência na transferência de calor na torre de arrefecimento. Relativamente à descarga industrial, é recomendável a colocação de um sistema de regularização automática de pH. A inserção de uma válvula de três vias permite um aproveitamento energético e de água, a partir da confluência da água oriunda dos furos com a água do tanque de água fria, sendo posteriormente alimentada à central de vácuo. No estudo da recuperação energética, um outro equipamento avaliado correspondeu à serpentina, no entanto, verificou-se que a poupança no consumo de gás natural era de apenas 0,005%, o que não se mostrou uma proposta viável. O orçamento de todos os equipamentos é de 11.720,76 €, possibilitando não só um melhor funcionamento industrial, como um menor impacto a nível ambiental. Os custos futuros de funcionamento aumentam em 3,36%, tendo a pressurização um aumento do seu custo em 3,4% em relação ao custo actual, verificando-se um custo anual de 10.781,21€, em relação aos processos de arejamento, coagulação e desinfecção.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of multicores is becoming widespread inthe field of embedded systems, many of which have real-time requirements. Hence, ensuring that real-time applications meet their timing constraints is a pre-requisite before deploying them on these systems. This necessitates the consideration of the impact of the contention due to shared lowlevel hardware resources like the front-side bus (FSB) on the Worst-CaseExecution Time (WCET) of the tasks. Towards this aim, this paper proposes a method to determine an upper bound on the number of bus requests that tasks executing on a core can generate in a given time interval. We show that our method yields tighter upper bounds in comparison with the state of-the-art. We then apply our method to compute the extra contention delay incurred by tasks, when they are co-scheduled on different cores and access the shared main memory, using a shared bus, access to which is granted using a round-robin arbitration (RR) protocol.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The usage of COTS-based multicores is becoming widespread in the field of embedded systems. Providing realtime guarantees at design-time is a pre-requisite to deploy real-time systems on these multicores. This necessitates the consideration of the impact of the contention due to shared low-level hardware resources on the Worst-Case Execution Time (WCET) of the tasks. As a step towards this aim, this paper first identifies the different factors that make the WCET analysis a challenging problem in a typical COTS-based multicore system. Then, we propose and prove, a mathematically correct method to determine tight upper bounds on the WCET of the tasks, when they are co-scheduled on different cores.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The current industry trend is towards using Commercially available Off-The-Shelf (COTS) based multicores for developing real time embedded systems, as opposed to the usage of custom-made hardware. In typical implementation of such COTS-based multicores, multiple cores access the main memory via a shared bus. This often leads to contention on this shared channel, which results in an increase of the response time of the tasks. Analyzing this increased response time, considering the contention on the shared bus, is challenging on COTS-based systems mainly because bus arbitration protocols are often undocumented and the exact instants at which the shared bus is accessed by tasks are not explicitly controlled by the operating system scheduler; they are instead a result of cache misses. This paper makes three contributions towards analyzing tasks scheduled on COTS-based multicores. Firstly, we describe a method to model the memory access patterns of a task. Secondly, we apply this model to analyze the worst case response time for a set of tasks. Although the required parameters to obtain the request profile can be obtained by static analysis, we provide an alternative method to experimentally obtain them by using performance monitoring counters (PMCs). We also compare our work against an existing approach and show that our approach outperforms it by providing tighter upper-bound on the number of bus requests generated by a task.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Contention on the memory bus in COTS based multicore systems is becoming a major determining factor of the execution time of a task. Analyzing this extra execution time is non-trivial because (i) bus arbitration protocols in such systems are often undocumented and (ii) the times when the memory bus is requested to be used are not explicitly controlled by the operating system scheduler; they are instead a result of cache misses. We present a method for finding an upper bound on the extra execution time of a task due to contention on the memory bus in COTS based multicore systems. This method makes no assumptions on the bus arbitration protocol (other than assuming that it is work-conserving).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Demand response is assumed as an essential resource to fully achieve the smart grids operating benefits, namely in the context of competitive markets and of the increasing use of renewable-based energy sources. Some advantages of Demand Response (DR) programs and of smart grids can only be achieved through the implementation of Real Time Pricing (RTP). The integration of the expected increasing amounts of distributed energy resources, as well as new players, requires new approaches for the changing operation of power systems. The methodology proposed in this paper aims the minimization of the operation costs in a distribution network operated by a virtual power player that manages the available energy resources focusing on hour ahead re-scheduling. When facing lower wind power generation than expected from day ahead forecast, demand response is used in order to minimize the impacts of such wind availability change. In this way, consumers actively participate in regulation up and spinning reserve ancillary services through demand response programs. Real time pricing is also applied. The proposed model is especially useful when actual and day ahead wind forecast differ significantly. Its application is illustrated in this paper implementing the characteristics of a real resources conditions scenario in a 33 bus distribution network with 32 consumers and 66 distributed generators.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A presente tese descreve diferentes soluções que permitem a reutilização da energia recuperada em ascensores eléctricos de roda de aderência dotados de conversores electrónicos de frequência e dessa forma contribuir para a melhoria da eficiência energética nos ascensores. Nos ascensores, a energia potencial é constantemente transferida enquanto a cabina está em movimento. Se a cabina se estiver a movimentar em sentido descendente com plena carga, ou em sentido ascendente, mas vazia, o motor estará em modo gerador. Quando a cabina se movimenta em sentido descendente, e o peso na cabina é superior ao peso do contrapeso, então o binário do motor encontra-se em sentido contrário à velocidade, isto é, o motor está a travar, havendo lugar à recuperação de energia. Igualmente, se a cabina subir vazia, também se poderá recuperar energia eléctrica. A energia acumulada em forma de energia potencial nas pessoas e no contrapeso pode ser recuperada, dado que o motor estará a funcionar como um gerador. De modo a estudar a viabilidade técnica e económica das diferentes soluções foram realizadas medições a uma amostra representativa de ascensores eléctricos de roda de aderência. Esta amostra é constituída por 39 ascensores que estão instalados em diferentes tipos de edifícios e que pertencem a diferentes categorias de utilização, de acordo com a norma VDI 4707:2009. Para cada ascensor foi medida a energia consumida e a energia gerada para uma manobra completa – a descida e a subida da cabina sem carga. A partir das medições, e com base na norma VDI 4707:2009 foram calculados os valores anualizados de energia eléctrica consumidos e produzidos por cada ascensor. A partir das 5 hipóteses identificadas para a utilização da energia recuperada (carregamento de bateria para alimentação dos circuitos em stand-by; carregamento de supercondensador para alimentação dos circuitos em stand-by; carregamento de supercondensador para alimentar o barramento DC; reinjecção da energia no barramento DC de um conjunto de ascensores em grupo; reinjecção da energia na rede eléctrica do edifício onde o ascensor está instalado) foi realizada a avaliação técnica e a avaliação económico-financeira para cada um dos ascensores. Por último, foi desenvolvido um simulador que permite definir a solução de recuperação de energia que seja técnica e economicamente mais viável, para um dado ascensor eléctrico de roda de aderência instalado, mediante a introdução dos parâmetros técnicos do ascensor em avaliação.