10 resultados para Total Maximum Daily Load Program (Ill.)
em Instituto Politécnico do Porto, Portugal
Resumo:
Distributed generation unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to load centers, interchanging electric power with the network. This work presents a probabilistic methodology conceived to assist the electric system planning engineers in the selection of the distributed generation location, taking into account the hourly load changes or the daily load cycle. The hourly load centers, for each of the different hourly load scenarios, are calculated deterministically. These location points, properly weighted according to their load magnitude, are used to calculate the best fit probability distribution. This distribution is used to determine the maximum likelihood perimeter of the area where each source distributed generation point should preferably be located by the planning engineers. This takes into account, for example, the availability and the cost of the land lots, which are factors of special relevance in urban areas, as well as several obstacles important for the final selection of the candidates of the distributed generation points. The proposed methodology has been applied to a real case, assuming three different bivariate probability distributions: the Gaussian distribution, a bivariate version of Freund’s exponential distribution and the Weibull probability distribution. The methodology algorithm has been programmed in MATLAB. Results are presented and discussed for the application of the methodology to a realistic case and demonstrate the ability of the proposed methodology for efficiently handling the determination of the best location of the distributed generation and their corresponding distribution networks.
Resumo:
This paper presents an electricity medium voltage (MV) customer characterization framework supportedby knowledge discovery in database (KDD). The main idea is to identify typical load profiles (TLP) of MVconsumers and to develop a rule set for the automatic classification of new consumers. To achieve ourgoal a methodology is proposed consisting of several steps: data pre-processing; application of severalclustering algorithms to segment the daily load profiles; selection of the best partition, corresponding tothe best consumers’ segmentation, based on the assessments of several clustering validity indices; andfinally, a classification model is built based on the resulting clusters. To validate the proposed framework,a case study which includes a real database of MV consumers is performed.
Resumo:
Trabalho de Projeto apresentado ao Instituto Superior de Contabilidade e Administração do Porto para obtenção do grau de Mestre em Auditoria Orientado por: Doutora Alcina Augusta de Sena Portugal Dias
Fuzzy Monte Carlo mathematical model for load curtailment minimization in transmission power systems
Resumo:
This paper presents a methodology which is based on statistical failure and repair data of the transmission power system components and uses fuzzyprobabilistic modeling for system component outage parameters. Using statistical records allows developing the fuzzy membership functions of system component outage parameters. The proposed hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzy-probabilistic models allows catching both randomness and fuzziness of component outage parameters. A network contingency analysis to identify any overloading or voltage violation in the network is performed once obtained the system states by Monte Carlo simulation. This is followed by a remedial action algorithm, based on optimal power flow, to reschedule generations and alleviate constraint violations and, at the same time, to avoid any load curtailment, if possible, or, otherwise, to minimize the total load curtailment, for the states identified by the contingency analysis. In order to illustrate the application of the proposed methodology to a practical case, the paper will include a case study for the Reliability Test System (RTS) 1996 IEEE 24 BUS.
Resumo:
Este trabalho teve como propósito fazer uma avaliação do desempenho energético e da qualidade do ar no interior das instalações de uma Piscina Municipal Coberta, localizada na zona norte de Portugal, sendo estabelecidos os seguintes objetivos: caracterização geral da piscina, no que respeita aos seus diferentes espaços e equipamentos, cálculo dos consumos térmicos e elétricos bem como o registo das concentrações de elementos poluentes para controlo da qualidade do ar no interior da piscina, tendo como base a legislação atualmente em vigor. A caracterização geral da piscina permitiu verificar algumas inconformidades como a temperatura da água nos tanques de natação que tem valores superiores aos recomendados e a sala de primeiros socorros que não possui acesso direto ao exterior. Acrescente-se que o pavimento nos chuveiros da casa de banho feminina e os valores de pH para água do tanque grande e pequeno não estão sempre dentro da gama de recomendação. O caudal da renovação de ar está a ser operado manualmente e quando está a funcionar a 50% da sua capacidade máxima, que acontece numa parte do dia, apenas consegue renovar 77,5% do caudal recomendado pelo RSECE. Para se obter o valor recomendado é necessário ter pelo menos 7 horas com o caudal a 100% da capacidade máxima. A avaria na UTA2 originou que 40% dos registos diários da humidade relativa interior estivessem fora da gama de valores recomendados e que esta é fortemente dependente da humidade no exterior e pode ser agravada quando as portas dos envidraçados da nave são abertas. Analisando ainda a quantidade de água removida na desumidificação do ar com a água evaporada em condições de Outono-Inverno ou Primavera-Verão, este estudo permitiu concluir que todas as combinações demonstraram a necessidade de desumidificação salvo a combinação Outono-Inverno e UTA2 a funcionar a 100% da sua capacidade máxima. Os isolamentos das tubagens na sala das caldeiras foram observados e comparados com as soluções recomendadas pelas empresas especialistas e verificou-se que alguns estão mal colocados com parcial ou total degradação, promovendo perdas térmicas. No caso das perdas calorificas por evaporação, estas representaram cerca de 67,78% das perdas totais. Como tal, estudou-se a aplicação de uma cobertura sobre o plano de água durante o período de inatividade da piscina (8 horas) e verificou-se que o resultado seria uma poupança de 654,8 kWh/dia, na ausência de evaporação da água, mais 88,00 kWh/dia do período da UTA2 a funcionar a 50% da sua capacidade, perfazendo um total de 742,8 kWh/dia. A aplicação da cobertura permite obter um VAL de valor positivo, uma TIR de 22,77% e sendo este valor superior ao WACC (Weight Average Cost of Capital), o projeto torna-se viável com um Pay-Back de 3,17 anos. Caracterizou-se também o consumo total diário em eletricidade, e verificou-se que as unidades de climatização, as bombas de circulação de água, a iluminação, e outros equipamentos representam, respetivamente, cerca de 67,81, 25,26, 2,68 e 3,91% da energia elétrica total consumida. Por fim, a análise à qualidade do ar no interior da nave em Maio e Setembro identificou que as concentrações de ozono apresentavam valores no limite do aceitável em Maio e superiores ao valor de emissão em Setembro. Os compostos orgânicos voláteis também apresentavam valores em Maio 4,98 vezes superior e em Setembro 6,87 vezes superior aos valores máximos exigidos pelo D.L. nº 79/2006. Houve ainda altas concentrações de radão registadas na casa dos filtros, em Maio com um valor 11,49 vezes superior, no entanto esse valor desceu em Setembro para 1,08 vezes, mesmo assim superior ao exigido pelo D.L. nº 79/2006.
Resumo:
The impact of effluent wastewaters from four different hospitals: a university (1456 beds), a general (350 beds), a pediatric (110 beds) and a maternity hospital (96 beds), which are conveyed to the same wastewater treatment plant (WWTP), was evaluated in the receiving urban wastewaters. The occurrence of 78 pharmaceuticals belonging to several therapeutic classes was assessed in hospital effluents and WWTP wastewaters (influent and effluent) as well as the contribution of each hospital in WWTP influent in terms of pharmaceutical load. Results indicate that pharmaceuticals are widespread pollutants in both hospital and urban wastewaters. The contribution of hospitals to the input of pharmaceuticals in urban wastewaters widely varies, according to their dimension. The estimated total mass loadings were 306 g d− 1 for the university hospital, 155 g d− 1 for the general one, 14 g d− 1 for the pediatric hospital and 1.5 g d− 1 for the maternity hospital, showing that the biggest hospitals have a greater contribution to the total mass load of pharmaceuticals. Furthermore, analysis of individual contributions of each therapeutic group showed that NSAIDs, analgesics and antibiotics are among the groups with the highest inputs. Removal efficiency can go from over 90% for pharmaceuticals like acetaminophen and ibuprofen to not removal for β-blockers and salbutamol. Total mass load of pharmaceuticals into receiving surface waters was estimated between 5 and 14 g/d/1000 inhabitants. Finally, the environmental risk posed by pharmaceuticals detected in hospital and WWTP effluents was assessed by means of hazard quotients toward different trophic levels (algae, daphnids and fish). Several pharmaceuticals present in the different matrices were identified as potentially hazardous to aquatic organisms, showing that especial attention should be paid to antibiotics such as ciprofloxacin, ofloxacin, sulfamethoxazole, azithromycin and clarithromycin, since their hazard quotients in WWTP effluent revealed that they could pose an ecotoxicological risk to algae.
Resumo:
This study compared the ground reaction forces (GRF) and plantar pressures between unloaded and occasional loaded gait. The GRF and plantar pressures of 60 participants were recorded during unloaded gait and occasional loaded gait (wearing a backpack that raised their body mass index to 30); this load criterion was adopted because is considered potentially harmful in permanent loaded gait (obese people). The results indicate an overall increase (absolute values) of GRF and plantar pressures during occasional loaded gait (p < 0.05); also, higher normalized (by total weight) values in the medial midfoot and toes, and lower values in the lateral rearfoot region were observed. During loaded gait the magnitude of the vertical GRF (impact and thrust maximum) decreased and the shear forces increased more than did the proportion of the load (normalized values). These data suggest a different pattern of GRF and plantar pressure distribution during occasional loaded compared to unloaded gait.
Resumo:
A distributed, agent-based intelligent system models and simulates a smart grid using physical players and computationally simulated agents. The proposed system can assess the impact of demand response programs.
Resumo:
In future power systems, in the smart grid and microgrids operation paradigms, consumers can be seen as an energy resource with decentralized and autonomous decisions in the energy management. It is expected that each consumer will manage not only the loads, but also small generation units, heating systems, storage systems, and electric vehicles. Each consumer can participate in different demand response events promoted by system operators or aggregation entities. This paper proposes an innovative method to manage the appliances on a house during a demand response event. The main contribution of this work is to include time constraints in resources management, and the context evaluation in order to ensure the required comfort levels. The dynamic resources management methodology allows a better resources’ management in a demand response event, mainly the ones of long duration, by changing the priorities of loads during the event. A case study with two scenarios is presented considering a demand response with 30 min duration, and another with 240 min (4 h). In both simulations, the demand response event proposes the power consumption reduction during the event. A total of 18 loads are used, including real and virtual ones, controlled by the presented house management system.
Resumo:
A tese de mestrado teve como objetivo o estudo e análise do funcionamento das centrais de cogeração e térmica da fábrica da Unicer em Leça do Balio, com o intuito de melhorar a sua eficiência, propondo alterações processuais. O trabalho realizado consistiu no reconhecimento das instalações, seguido da formulação e resolução dos balanços de energia globais. Com o acompanhamento diário do funcionamento foi possível propor melhorias sem custos que se revelaram muito benéficas, registando-se um aumento nas recuperações térmicas e por consequência no Rendimento Elétrico Equivalente (R.E.E.), na eficiência da instalação da cogeração e da central térmica. Na cogeração registou-se um aumento de 36,2% na potência recuperada em água quente, aproximadamente 600 kW, sendo já superior à prevista pelo projeto. Na caldeira recuperativa registou-se um ligeiro aumento de 4,0% na potência recuperada. Deste modo o rendimento térmico da central aumentou 6,4%, atingindo os 40,8% e superando os 40,4% projetados. O rendimento global final foi de 83,1% o que representa um aumento de 6,3%. O R.E.E. em Maio de 2014 foi de 76,3%, superior ao valor em Junho de 2013 em 8,7%. Tendo como referência o valor alvo de 70,5% para o R.E.E. apontado no início do estágio, nos últimos 8 meses o seu valor tem sido sempre superior e em crescimento. Existe ainda a possibilidade de aproveitar a energia térmica de baixa temperatura que está a ser dissipada numa torre de arrefecimento, no mínimo 40 kW, num investimento com um período de retorno de investimento máximo de 8,1 meses. Na central térmica registou-se um aumento do rendimento para a mesma quantidade de energia produzida na central, pois esta é a principal variável do processo. Em 2014 a produção de energia apresentou um valor inferior a 2013, 6,9%, e a eficiência registou um acréscimo de 2,0%. A incorporação de biogás na alimentação de combustível à caldeira bifuel não pareceu comprometer significativamente a eficiência da central térmica, pelo que a sua utilização é benéfica. Com o aumento das recuperações térmicas na central de cogeração foram estimadas poupanças de gás natural equivalentes a 3,3 GWh, o que significa 120.680€ economizados nos últimos 11 meses do trabalho. É esperado uma poupança de 18.000€ mensais com a melhoria do funcionamento obtida nas duas centrais.