47 resultados para Schemes
em Instituto Politécnico do Porto, Portugal
Resumo:
Amulti-residue methodology based on a solid phase extraction followed by gas chromatography–tandem mass spectrometry was developed for trace analysis of 32 compounds in water matrices, including estrogens and several pesticides from different chemical families, some of them with endocrine disrupting properties. Matrix standard calibration solutions were prepared by adding known amounts of the analytes to a residue-free sample to compensate matrix-induced chromatographic response enhancement observed for certain pesticides. Validation was done mainly according to the International Conference on Harmonisation recommendations, as well as some European and American validation guidelines with specifications for pesticides analysis and/or GC–MS methodology. As the assumption of homoscedasticity was not met for analytical data, weighted least squares linear regression procedure was applied as a simple and effective way to counteract the greater influence of the greater concentrations on the fitted regression line, improving accuracy at the lower end of the calibration curve. The method was considered validated for 31 compounds after consistent evaluation of the key analytical parameters: specificity, linearity, limit of detection and quantification, range, precision, accuracy, extraction efficiency, stability and robustness.
Resumo:
A vital role is being played by SCADA Communication for Supervisory Control and Data acquisition (SCADA) Monitoring Ststems. Devices that are designed to operate in safety-critical environments are usually designed to failsafe, but security vulnerabilities could be exploited by an attacker to disable the fail-safe mechanisms. Thus these devices must not onlybe designed for safety but also for security. This paper presents a study of the comparison of different Encryption schemes for securing SCADA Component Communication. The encryption schemes such as Symetric Key Encrypton in Wireless SCADA Environment, Assymmetric-key Encryption to Internet SCADA, and the Cross Crypto Scheme Cipher to secure communication for SCADA are analysed and the outcome is evaluated.
Resumo:
The design and development of simulation models and tools for Demand Response (DR) programs are becoming more and more important for adequately taking the maximum advantages of DR programs use. Moreover, a more active consumers’ participation in DR programs can help improving the system reliability and decrease or defer the required investments. DemSi, a DR simulator, designed and implemented by the authors of this paper, allows studying DR actions and schemes in distribution networks. It undertakes the technical validation of the solution using realistic network simulation based on PSCAD. DemSi considers the players involved in DR actions, and the results can be analyzed from each specific player point of view.
Resumo:
In competitive electricity markets with deep concerns for the efficiency level, demand response programs gain considerable significance. As demand response levels have decreased after the introduction of competition in the power industry, new approaches are required to take full advantage of demand response opportunities. This paper presents DemSi, a demand response simulator that allows studying demand response actions and schemes in distribution networks. It undertakes the technical validation of the solution using realistic network simulation based on PSCAD. The use of DemSi by a retailer in a situation of energy shortage, is presented. Load reduction is obtained using a consumer based price elasticity approach supported by real time pricing. Non-linear programming is used to maximize the retailer’s profit, determining the optimal solution for each envisaged load reduction. The solution determines the price variations considering two different approaches, price variations determined for each individual consumer or for each consumer type, allowing to prove that the approach used does not significantly influence the retailer’s profit. The paper presents a case study in a 33 bus distribution network with 5 distinct consumer types. The obtained results and conclusions show the adequacy of the used methodology and its importance for supporting retailers’ decision making.
Resumo:
Demand response can play a very relevant role in future power systems in which distributed generation can help to assure service continuity in some fault situations. This paper deals with the demand response concept and discusses its use in the context of competitive electricity markets and intensive use of distributed generation. The paper presents DemSi, a demand response simulator that allows studying demand response actions and schemes using a realistic network simulation based on PSCAD. Demand response opportunities are used in an optimized way considering flexible contracts between consumers and suppliers. A case study evidences the advantages of using flexible contracts and optimizing the available generation when there is a lack of supply.
Resumo:
Mestrado em Engenharia Electrotécnica – Sistemas Eléctricos de Energia
Resumo:
A empresa Petibol, S.A. – Embalagens de plástico centra-se na produção de embalagens de plástico a partir da matéria-prima Poliestireno Expandido (EPS) e Polipropileno Expandido (EPP). A empresa possui uma preocupação ao nível da qualidade da água e do aproveitamento energético, tendo desta forma surgido a realização do estudo na unidade industrial, com o objectivo de anular e/ou diminuir as possíveis lacunas existentes na unidade industrial. Numa primeira etapa foi realizada uma caracterização global à qualidade da água e à empresa, actualizando-se os esquemas já existentes, contabilizando-se os custos actuais relativamente aos processos no circuito da água (arrefecimento, aquecimento e pressurização), e por fim, efectuou-se um levantamento in loco do circuito de água, relativamente à pressão, temperatura e caudal. Numa fase posterior, foram propostos equipamentos e processos, tendo em vista a colmatação dos problemas identificados, realizando-se um subsequente estudo relativamente aos custos inerentes a esses novos processos. A caracterização à água foi avaliada em diferentes pontos do circuito industrial, tendo-se determinado na Sala de Bombagem que o filtro de areia não possuía as dimensões mais apropriadas, existindo também um problema a nível mecânico associado ao processo de contra-lavagem. Tais factos podem ser a causa da ocorrência de um aumento do teor de sólidos após a passagem na camada filtrante. Relativamente ao amaciador, este deveria amaciar de forma completa a água para alimentação à caldeira, embora se tenha registado à saída do amaciador uma dureza de 21,3 mg/L, denunciando problemas na troca iónica. No que toca à água de alimentação à caldeira, verifica-se a existência de parâmetros que não se encontram de acordo com os critérios enunciados para uma óptima qualidade, sendo eles o pH (10,14), condutividade (363 μS/cm), teor de ferro (1,21 mg/L) e a dureza (16 mg/L). De salientar que somente o teor de cobre, que se encontra em quantidades vestigiais, apresenta-se de acordo com os valores impostos. No que respeita à água da caldeira, esta apresenta parâmetros incompatíveis com os recomendados, sendo eles a condutividade (7350 μS/cm), teor de sólidos dissolvidos (5248 mg/L) e alcalinidade total (780 mg/L). De referir que o valor de pH (11,8) não se encontra de acordo com a aplicação do tratamento “fosfato-pH coordenado”. Em relação aos parâmetros com valores que se encontram dentro dos limites, estes correspondem à dureza (0 mg/L), ao teor de fosfatos (45 mg/L) e teor de sílica (0 mg/L). A água do circuito de arrefecimento foi sujeita a uma análise microbiológica, que corroborou a presença de um biofilme. Um dos problemas enunciados pela empresa, prendia-se com a impossibilidade de descarga, no colector municipal, dos condensados dos compressores, visto apresentarem uma quantidade de óleo de cerca de 43,3 mg/L, equivalente a quatro vezes o valor limite de emissão, de acordo com a legislação municipal. Por fim, o efluente de descarga industrial apresenta um valor de pH (10,3) acima do intervalo permitido por lei (6,0 – 9,0), sendo que a corrente que mais contribui para este acréscimo de pH corresponde à corrente proveniente da água de purga, visto esta apresentar um valor de pH de 12,22. De maneira a contornar os parâmetros enunciados, é proposto a substituição do filtro de areia da Sala de Bombagem, assim como a inserção de um conjunto de medidas de remoção de ferro e desinfecção, sendo a conjugação de arejamento, coagulação, filtração e desinfecção, por parte do hipoclorito, a proposta apresentada. Aos condensados dos compressores é apresentado um sistema de separação, que possibilita a remoção do óleo da água, e uma consequente descarga da mesma. Actualmente, não existe qualquer filtro de areia no circuito de arrefecimento da água, sendo proposto assim esse equipamento, de forma a minorar o desenvolvimento da população microbiana, bem como a permitir uma maior eficiência na transferência de calor na torre de arrefecimento. Relativamente à descarga industrial, é recomendável a colocação de um sistema de regularização automática de pH. A inserção de uma válvula de três vias permite um aproveitamento energético e de água, a partir da confluência da água oriunda dos furos com a água do tanque de água fria, sendo posteriormente alimentada à central de vácuo. No estudo da recuperação energética, um outro equipamento avaliado correspondeu à serpentina, no entanto, verificou-se que a poupança no consumo de gás natural era de apenas 0,005%, o que não se mostrou uma proposta viável. O orçamento de todos os equipamentos é de 11.720,76 €, possibilitando não só um melhor funcionamento industrial, como um menor impacto a nível ambiental. Os custos futuros de funcionamento aumentam em 3,36%, tendo a pressurização um aumento do seu custo em 3,4% em relação ao custo actual, verificando-se um custo anual de 10.781,21€, em relação aos processos de arejamento, coagulação e desinfecção.
Resumo:
Over the last two decades the research and development of legged locomotion robots has grown steadily. Legged systems present major advantages when compared with ‘traditional’ vehicles, because they allow locomotion in inaccessible terrain to vehicles with wheels and tracks. However, the robustness of legged robots, and especially their energy consumption, among other aspects, still lag behind mechanisms that use wheels and tracks. Therefore, in the present state of development, there are several aspects that need to be improved and optimized. Keeping these ideas in mind, this paper presents the review of the literature of different methods adopted for the optimization of the structure and locomotion gaits of walking robots. Among the distinct possible strategies often used for these tasks are referred approaches such as the mimicking of biological animals, the use of evolutionary schemes to find the optimal parameters and structures, the adoption of sound mechanical design rules, and the optimization of power-based indexes.
Resumo:
Multi-objective particle swarm optimization (MOPSO) is a search algorithm based on social behavior. Most of the existing multi-objective particle swarm optimization schemes are based on Pareto optimality and aim to obtain a representative non-dominated Pareto front for a given problem. Several approaches have been proposed to study the convergence and performance of the algorithm, particularly by accessing the final results. In the present paper, a different approach is proposed, by using Shannon entropy to analyzethe MOPSO dynamics along the algorithm execution. The results indicate that Shannon entropy can be used as an indicator of diversity and convergence for MOPSO problems.
Resumo:
O presente trabalho integra-se no âmbito dos requisitos definidos na unidade curricular DIPRE que faz parte do 2º ano do Curso de Mestrado em Tecnologia e Gestão das Construções do Instituto Superior de Engenharia do Porto do Politécnico do Porto. Este trabalho consistiu na elaboração do projecto de estabilidade de um edifício de habitação multifamiliar, tendo-se também realizado uma análise comparativa de dois programas de cálculo estrutural. O trabalho foi subdividido em parte escrita e parte desenhada. Sendo a primeira constituída pelos seguintes capítulos: 1 – Memória descritiva e justificativa de cálculo 2 – Mapa de quantidades de trabalho e de materiais 3 – Estimativa orçamental 4 – Condições técnicas do projecto de fundações e estruturas A parte desenhada incluí 16 desenhos, representativos dos esquemas estruturais adoptados e dos pormenores construtivos dos elementos estruturais
Resumo:
Este trabalho é baseado no simulador de redes PST2200 do Laboratório de Sistemas de Energia (LSE) pois está avariado com vários problemas conhecidos, designadamente: - Defeito de isolamento (disparo de diferencial), - Desregulação da velocidade da máquina primária (motor DC), - Circuito de excitação da máquina síncrona inoperacional, - Inexistência de esquemas elétricos dos circuitos do simulador, - Medidas desreguladas e com canais de medida com circuito impresso queimado. O trabalho executado foi: - O levantamento e desenho de raiz (não existe qualquer manual) dos esquemas dos 10 módulos do simulador, designadamente naqueles com avaria ou com desempenho problemático a fim de que se possa ter uma visão mais pormenorizada dos circuitos e seus problemas, por forma a intervir para os minimizar e resolver, - Foi realizado o diagnóstico de avaria do simulador e foram propostas soluções para os mesmos, - Realizaram-se as intervenções propostas e aprovadas. Nas intervenções realizadas, os princípios orientadores foram: - Aumentar a robustez do equipamento por forma a garantir a sua integridade a utilizações menos apropriados e manobras 'exóticas' próprias de alunos, que pela sua condição, estão em fase de aprendizagem, - Atualizar o equipamento, colocando-o em sintonia com o 'estado da arte', - Como fator de valorização suplementar, foi concebida e aplicada a supervisão remota do funcionamento do simulador através da rede informática. Foram detetados inúmeros erros: - Má ligação do motor de corrente continua ao variador, resultando a falta de controlo da frequência da rede do sistema, - Ligações entre painéis trocadas resultando em avarias diversas das fontes de alimentação, - Cartas eletrónicas de medidas avariadas e que além de se reparar, foram também calibradas. Devido ao mecenato da empresa Schnitt + Sohn participando monetariamente, fez-se o projeto de alteração e respetiva execução de grande parte do simulador aumentando a fiabilidade do mesmo, diminuindo assim a frequência das avarias naturais mais as que acontecem involuntariamente devido a este ser um instrumento didático. Além do trabalho elétrico, foi feito muito trabalho de chaparia para alteração de estrutura e suporte do material com diferenças de posicionamento. Neste trabalho dá-se também alguns exemplos de cálculo e simulação das redes de transporte que se pode efetuar no simulador como estudo e simulação de avarias num sistema produtivo real. Realizou-se a monitorização de dois aparelhos indicadores de parâmetros de energia (Janitza UMG96S) através duma rede com dois protocolos ethernet e profibus utilizando o plc (Omron CJ2M) como valorização do trabalho.
Resumo:
In this paper we survey the most relevant results for the prioritybased schedulability analysis of real-time tasks, both for the fixed and dynamic priority assignment schemes. We give emphasis to the worst-case response time analysis in non-preemptive contexts, which is fundamental for the communication schedulability analysis. We define an architecture to support priority-based scheduling of messages at the application process level of a specific fieldbus communication network, the PROFIBUS. The proposed architecture improves the worst-case messages’ response time, overcoming the limitation of the first-come-first-served (FCFS) PROFIBUS queue implementations.
Resumo:
Fieldbus communication networks aim to interconnect sensors, actuators and controllers within distributed computer-controlled systems. Therefore, they constitute the foundation upon which real-time applications are to be implemented. A specific class of fieldbus communication networks is based on a simplified version of token-passing protocols, where each station may transfer, at most, a single message per token visit (SMTV). In this paper, we establish an analogy between non-preemptive task scheduling in single processors and the scheduling of messages on SMTV token-passing networks. Moreover, we clearly show that concepts such as blocking and interference in non-preemptive task scheduling have their counterparts in the scheduling of messages on SMTV token-passing networks. Based on this task/message scheduling analogy, we provide pre-run-time schedulability conditions for supporting real-time messages with SMTV token-passing networks. We provide both utilisation-based and response time tests to perform the pre-run-time schedulability analysis of real-time messages on SMTV token-passing networks, considering RM/DM (rate monotonic/deadline monotonic) and EDF (earliest deadline first) priority assignment schemes
Resumo:
Secure group communication is a paradigm that primarily designates one-to-many communication security. The proposed works relevant to secure group communication have predominantly considered the whole network as being a single group managed by a central powerful node capable of supporting heavy communication, computation and storage cost. However, a typical Wireless Sensor Network (WSN) may contain several groups, and each one is maintained by a sensor node (the group controller) with constrained resources. Moreover, the previously proposed schemes require a multicast routing support to deliver the rekeying messages. Nevertheless, multicast routing can incur heavy storage and communication overheads in the case of a wireless sensor network. Due to these two major limitations, we have reckoned it necessary to propose a new secure group communication with a lightweight rekeying process. Our proposal overcomes the two limitations mentioned above, and can be applied to a homogeneous WSN with resource-constrained nodes with no need for a multicast routing support. Actually, the analysis and simulation results have clearly demonstrated that our scheme outperforms the previous well-known solutions.
Resumo:
Wireless Sensor Networks (WSN) are being used for a number of applications involving infrastructure monitoring, building energy monitoring and industrial sensing. The difficulty of programming individual sensor nodes and the associated overhead have encouraged researchers to design macro-programming systems which can help program the network as a whole or as a combination of subnets. Most of the current macro-programming schemes do not support multiple users seamlessly deploying diverse applications on the same shared sensor network. As WSNs are becoming more common, it is important to provide such support, since it enables higher-level optimizations such as code reuse, energy savings, and traffic reduction. In this paper, we propose a macro-programming framework called Nano-CF, which, in addition to supporting in-network programming, allows multiple applications written by different programmers to be executed simultaneously on a sensor networking infrastructure. This framework enables the use of a common sensing infrastructure for a number of applications without the users having to worrying about the applications already deployed on the network. The framework also supports timing constraints and resource reservations using the Nano-RK operating system. Nano- CF is efficient at improving WSN performance by (a) combining multiple user programs, (b) aggregating packets for data delivery, and (c) satisfying timing and energy specifications using Rate- Harmonized Scheduling. Using representative applications, we demonstrate that Nano-CF achieves 90% reduction in Source Lines-of-Code (SLoC) and 50% energy savings from aggregated data delivery.