240 resultados para Scheduling, heuristic algorithms, blocking flow shop
em Instituto Politécnico do Porto, Portugal
Resumo:
Esta dissertação apresenta um estudo sobre os problemas de sequenciamento de tarefas de produção do tipo job shop scheduling. Os problemas de sequenciamento de tarefas de produção pretendem encontrar a melhor sequência para o processamento de uma lista de tarefas, o instante de início e término de cada tarefa e a afetação de máquinas para as tarefas. Entre estes, encontram-se os problemas com máquinas paralelas, os problemas job shop e flow shop. As medidas de desempenho mais comuns são o makespan (instante de término da execução de todas as tarefas), o tempo de fluxo total, a soma dos atrasos (tardiness), o atraso máximo, o número de tarefas que são completadas após a data limite, entre outros. Num problema do tipo job shop, as tarefas (jobs) consistem num conjunto de operações que têm de ser executadas numa máquina pré-determinada, obedecendo a um determinado sequenciamento com tempos pré-definidos. Estes ambientes permitem diferentes cenários de sequenciamento das tarefas. Normalmente, não são permitidas interrupções no processamento das tarefas (preemption) e pode ainda ser necessário considerar tempos de preparação dependentes da sequência (sequence dependent setup times) ou atribuir pesos (prioridades) diferentes em função da importância da tarefa ou do cliente. Pretende-se o estudo dos modelos matemáticos existentes para várias variantes dos problemas de sequenciamento de tarefas do tipo job shop e a comparação dos resultados das diversas medidas de desempenho da produção. Este trabalho contribui para demonstrar a importância que um bom sequenciamento da produção pode ter na sua eficiência e consequente impacto financeiro.
Resumo:
This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
Atualmente o sistema produtivo do tipo job shop é muito comum nas PMEs (Pequenas e Médias Empresas). Estas empresas trabalham por encomenda. Produzem grande variedade de modelos, e em pequenas quantidades. Os prazos de entrega são um fator de elevada importância, pois os clientes exigem um produto de qualidade no tempo certo. O presente trabalho, pretende criar uma ferramenta de programação da produção para a secção da costura, usando dados reais da empresa, que tem uma implantação do tipo job shop com máquinas multi-operação (Multi-Purpose -Machines Job Shop). No final, são reunidas as principais conclusões e perspetivados futuros desenvolvimentos. Os resultados obtidos comprovam que o algoritmo desenvolvido, com base no algoritmo de Giffler & Thompson, consegue obter com grande precisão e de forma rápida o escalonamento / balanceamento da secção da costura. Com a ferramenta criada, a empresa otimiza a programação da secção da costura e fornece informação importante á gestão da produção, possibilitando uma melhoria do planeamento da empresa.
Resumo:
This paper presents an optimization approach for the job shop scheduling problem (JSSP). The JSSP is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. The proposed approach is based on a genetic algorithm technique. The scheduling rules such as SPT and MWKR are integrated into the process of genetic evolution. The chromosome representation of the problem is based on random keys. The schedules are constructed using a priority rule in which the priorities and delay times of the operations are defined by the genetic algorithm. Schedules are constructed using a procedure that generates parameterized active schedules. After a schedule is obtained a local search heuristic is applied to improve the solution. The approach is tested on a set of standard instances taken from the literature and compared with other approaches. The computation results validate the effectiveness of the proposed approach.
Resumo:
This paper presents a methodology for applying scheduling algorithms using Monte Carlo simulation. The methodology is based on a decision support system (DSS). The proposed methodology combines a genetic algorithm with a new local search using Monte Carlo Method. The methodology is applied to the job shop scheduling problem (JSSP). The JSSP is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. The methodology is tested on a set of standard instances taken from the literature and compared with others. The computation results validate the effectiveness of the proposed methodology. The DSS developed can be utilized in a common industrial or construction environment.
Resumo:
The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.
Resumo:
In this paper we discuss challenges and design principles of an implementation of slot-based tasksplitting algorithms into the Linux 2.6.34 version. We show that this kernel version is provided with the required features for implementing such scheduling algorithms. We show that the real behavior of the scheduling algorithm is very close to the theoretical. We run and discuss experiments on 4-core and 24-core machines.
Resumo:
Multiprocessors, particularly in the form of multicores, are becoming standard building blocks for executing reliable software. But their use for applications with hard real-time requirements is non-trivial. Well-known realtime scheduling algorithms in the uniprocessor context (Rate-Monotonic [1] or Earliest-Deadline-First [1]) do not perform well on multiprocessors. For this reason the scientific community in the area of real-time systems has produced new algorithms specifically for multiprocessors. In the meanwhile, a proposal [2] exists for extending the Ada language with new basic constructs which can be used for implementing new algorithms for real-time scheduling; the family of task splitting algorithms is one of them which was emphasized in the proposal [2]. Consequently, assessing whether existing task splitting multiprocessor scheduling algorithms can be implemented with these constructs is paramount. In this paper we present a list of state-of-art task-splitting multiprocessor scheduling algorithms and, for each of them, we present detailed Ada code that uses the new constructs.
Resumo:
The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm
Resumo:
Mestrado em Engenharia Electrotécnica – Sistemas Eléctricos de Energia
Resumo:
Computerized scheduling methods and computerized scheduling systems according to exemplary embodiments. A computerized scheduling method may be stored in a memory and executed on one or more processors. The method may include defining a main multi-machine scheduling problem as a plurality of single machine scheduling problems; independently solving the plurality of single machine scheduling problems thereby calculating a plurality of near optimal single machine scheduling problem solutions; integrating the plurality of near optimal single machine scheduling problem solutions into a main multi-machine scheduling problem solution; and outputting the main multi-machine scheduling problem solution.
Resumo:
An intensive use of dispersed energy resources is expected for future power systems, including distributed generation, especially based on renewable sources, and electric vehicles. The system operation methods and tool must be adapted to the increased complexity, especially the optimal resource scheduling problem. Therefore, the use of metaheuristics is required to obtain good solutions in a reasonable amount of time. This paper proposes two new heuristics, called naive electric vehicles charge and discharge allocation and generation tournament based on cost, developed to obtain an initial solution to be used in the energy resource scheduling methodology based on simulated annealing previously developed by the authors. The case study considers two scenarios with 1000 and 2000 electric vehicles connected in a distribution network. The proposed heuristics are compared with a deterministic approach and presenting a very small error concerning the objective function with a low execution time for the scenario with 2000 vehicles.
Resumo:
A função de escalonamento desempenha um papel importante nos sistemas de produção. Os sistemas de escalonamento têm como objetivo gerar um plano de escalonamento que permite gerir de uma forma eficiente um conjunto de tarefas que necessitam de ser executadas no mesmo período de tempo pelos mesmos recursos. Contudo, adaptação dinâmica e otimização é uma necessidade crítica em sistemas de escalonamento, uma vez que as organizações de produção têm uma natureza dinâmica. Nestas organizações ocorrem distúrbios nas condições requisitos de trabalho regularmente e de forma inesperada. Alguns exemplos destes distúrbios são: surgimento de uma nova tarefa, cancelamento de uma tarefa, alteração na data de entrega, entre outros. Estes eventos dinâmicos devem ser tidos em conta, uma vez que podem influenciar o plano criado, tornando-o ineficiente. Portanto, ambientes de produção necessitam de resposta imediata para estes eventos, usando um método de reescalonamento em tempo real, para minimizar o efeito destes eventos dinâmicos no sistema de produção. Deste modo, os sistemas de escalonamento devem de uma forma automática e inteligente, ser capazes de adaptar o plano de escalonamento que a organização está a seguir aos eventos inesperados em tempo real. Esta dissertação aborda o problema de incorporar novas tarefas num plano de escalonamento já existente. Deste modo, é proposta uma abordagem de otimização – Hiper-heurística baseada em Seleção Construtiva para Escalonamento Dinâmico- para lidar com eventos dinâmicos que podem ocorrer num ambiente de produção, a fim de manter o plano de escalonamento, o mais robusto possível. Esta abordagem é inspirada em computação evolutiva e hiper-heurísticas. Do estudo computacional realizado foi possível concluir que o uso da hiper-heurística de seleção construtiva pode ser vantajoso na resolução de problemas de otimização de adaptação dinâmica.
Resumo:
Nos dias de hoje, os sistemas de tempo real crescem em importância e complexidade. Mediante a passagem do ambiente uniprocessador para multiprocessador, o trabalho realizado no primeiro não é completamente aplicável no segundo, dado que o nível de complexidade difere, principalmente devido à existência de múltiplos processadores no sistema. Cedo percebeu-se, que a complexidade do problema não cresce linearmente com a adição destes. Na verdade, esta complexidade apresenta-se como uma barreira ao avanço científico nesta área que, para já, se mantém desconhecida, e isto testemunha-se, essencialmente no caso de escalonamento de tarefas. A passagem para este novo ambiente, quer se trate de sistemas de tempo real ou não, promete gerar a oportunidade de realizar trabalho que no primeiro caso nunca seria possível, criando assim, novas garantias de desempenho, menos gastos monetários e menores consumos de energia. Este último fator, apresentou-se desde cedo, como, talvez, a maior barreira de desenvolvimento de novos processadores na área uniprocessador, dado que, à medida que novos eram lançados para o mercado, ao mesmo tempo que ofereciam maior performance, foram levando ao conhecimento de um limite de geração de calor que obrigou ao surgimento da área multiprocessador. No futuro, espera-se que o número de processadores num determinado chip venha a aumentar, e como é óbvio, novas técnicas de exploração das suas inerentes vantagens têm de ser desenvolvidas, e a área relacionada com os algoritmos de escalonamento não é exceção. Ao longo dos anos, diferentes categorias de algoritmos multiprocessador para dar resposta a este problema têm vindo a ser desenvolvidos, destacando-se principalmente estes: globais, particionados e semi-particionados. A perspectiva global, supõe a existência de uma fila global que é acessível por todos os processadores disponíveis. Este fato torna disponível a migração de tarefas, isto é, é possível parar a execução de uma tarefa e resumir a sua execução num processador distinto. Num dado instante, num grupo de tarefas, m, as tarefas de maior prioridade são selecionadas para execução. Este tipo promete limites de utilização altos, a custo elevado de preempções/migrações de tarefas. Em contraste, os algoritmos particionados, colocam as tarefas em partições, e estas, são atribuídas a um dos processadores disponíveis, isto é, para cada processador, é atribuída uma partição. Por essa razão, a migração de tarefas não é possível, acabando por fazer com que o limite de utilização não seja tão alto quando comparado com o caso anterior, mas o número de preempções de tarefas decresce significativamente. O esquema semi-particionado, é uma resposta de caráter hibrido entre os casos anteriores, pois existem tarefas que são particionadas, para serem executadas exclusivamente por um grupo de processadores, e outras que são atribuídas a apenas um processador. Com isto, resulta uma solução que é capaz de distribuir o trabalho a ser realizado de uma forma mais eficiente e balanceada. Infelizmente, para todos estes casos, existe uma discrepância entre a teoria e a prática, pois acaba-se por se assumir conceitos que não são aplicáveis na vida real. Para dar resposta a este problema, é necessário implementar estes algoritmos de escalonamento em sistemas operativos reais e averiguar a sua aplicabilidade, para caso isso não aconteça, as alterações necessárias sejam feitas, quer a nível teórico quer a nível prá