11 resultados para Planning System
em Instituto Politécnico do Porto, Portugal
Resumo:
In this paper we present a mobile recommendation and planning system, named PSiS Mobile. It is designed to provide effective support during a tourist visit through context-aware information and recommendations about points of interest, exploiting tourist preferences and context. Designing a tool like this brings several challenges that must be addressed. We discuss how these challenges have been overcame, present the overall system architecture, since this mobile application extends the PSiS project website, and the mobile application architecture.
Resumo:
Os sistemas de recomendação têm vindo a ser cada vez mais utilizados nos últimos anos. Por isso, é imprescindível que estes sistemas se adaptem à evolução da sociedade incluindo cada vez mais novas funcionalidades, tais como a adaptação do sistema ao contexto da pessoa. Esta adaptação pode ser feita através de, por exemplo, dispositivos móveis, que têm vindo a apresentar uma taxa de crescimento de vendas muito grande. Dada a crescente integração dos sistemas de recomendação com os sistemas móveis, foi elaborado um estudo sobre o estado da arte dos sistemas de auxílio ao turista que utilizam dispositivos móveis, sendo apresentadas as suas vantagens e desvantagens. Estes sistemas móveis de auxílio a turistas foram divididos em dois grupos: os que apresentam apenas a informação sobre pontos de interesse e os sistemas que são capazes de efectuar recomendações, com base no perfil do turista. Um breve estudo sobre os sistemas operativos para dispositivos móveis é apresentado, sendo especialmente focado o sistema operativo Android que foi o escolhido para esta implementação. Como os dispositivos móveis, actualmente, ainda possuem várias limitações, estas foram descritas e apresentadas as boas práticas no desenvolvimento de aplicações para este tipo de sistemas. É também apresentado um estudo que visa descobrir qual é o método mais leve e mais rápido para trocar dados entre a parte servidora e a parte móvel. Com a parte introdutória apresentada, é exposto o projecto desenvolvido nesta tese, o PSiS Mobile. Este sistema é um módulo que faz parte do projecto PSiS e pretende trazer todas as vantagens dos sistemas móveis para o sistema base já implementado. O projecto PSiS foca-se no estabelecimento de planos de visita personalizados com indicação de percursos para turistas com tempo limitado. Apoiando a definição de planos de visitas de acordo com o perfil do turista (interesses, valores pessoais, desejos, restrições, deficiências, etc.) combinando os produtos de turismo mais adequados (locais de interesse, eventos, restaurantes, etc.) em itinerários eficientes. A utilização de dispositivos móveis para acompanhamento da visita permite uma rápida interacção entre o turista e o sistema. Assim, o PSiS poderá recolher informação contextual do utilizador para que o perfil do mesmo seja enriquecido. O sistema apresentado é composto por duas partes: a parte cliente e a parte servidora. Toda a informação, como por exemplo o perfil do turista, histórico de viagens e valores de similaridade entre utilizadores está presente na parte servidora. O processo de recomendação também é efectuado pela aplicação servidora, sendo esta a responsável pela atribuição de uma classificação aos pontos de interesse tendo em conta o perfil do utilizador em causa. A base de dados do PSiS possui toda a informação relativa aos pontos de interesse numa determinada cidade ou região e o portfólio completo do histórico de visitas de cada utilizador. A componente móvel é uma parte muito importante para o sistema, pois interage com o utilizador no terreno. Um dispositivo móvel como o PDA, não só permite a apresentação de informação relevante ao utilizador, como também permite a recolha automática de informação contextual (por exemplo, a localização). Toda esta informação contribui para a definição de um perfil completo e para uma melhor adaptação do sistema às necessidades do utilizador. De forma a nem sempre estar dependente do servidor, a aplicação móvel possui rotinas para a realização de recomendações básicas. Ou seja, a aplicação móvel não realiza a classificação dos pontos de interesse, mas apenas mostra os principais resultados já formados pela parte servidora. Por exemplo, se um utilizador gostar de comida Chinesa, um restaurante Chinês nas imediações irá ter uma boa classificação e, por isso, ser recomendado. A aplicação móvel mostra ao turista o percurso definido para o dia em que o mesmo se encontra, sendo feito o rastreio do trajecto que o mesmo efectua. Assim, o sistema consegue saber se o horário do planeamento está a ser cumprido ou não. Caso não esteja, é invocado um algoritmo de planeamento que irá tentar corrigir o atraso ou o adiantamento perante o horário inicial. Depois de visitar um ponto de interesse, é pedido ao utilizador para fornecer feedback sobre o mesmo. Se desejado também é possível mostrar os pontos de interesse existentes perto do turista (usando as coordenadas GPS obtidas pelo dispositivo móvel) organizados por categorias, raio de distância, etc. Apesar dos dispositivos móveis possuírem várias restrições, pretendeu-se proporcionar ao utilizador uma boa experiência, através de uma aplicação rápida, de fácil utilização e adaptável, incluindo funcionalidades de planeamento, realidade aumentada e integração com a rede social do sistema. Todos estes factores contribuem para a disponibilização de informação detalhada ao turista.
Resumo:
Com o aumento da concorrência, a crise económica que atravessamos e com a conquista de novos mercados no horizonte, surge a necessidade de responder a essas situações com uma melhor prestação do sistema produtivo no sentido de reduzir tempos de produção e de baixar os custos dos mesmos, podendo assim dar uma resposta mais rápida e competitiva às expectativas dos clientes. Esta dissertação tem como objectivo analisar todo o sistema produtivo da empresa, desenvolvendo um estudo adequado ao sistema actual de fabrico de mobiliário, propondo melhorias que proporcionem uma melhor organização e uma redução dos custos de fabrico. Fez-se também um levantamento do sistema de planeamento existente, detectando pontos de melhoria que, para além de um maior controlo e organização, permitem, em alguns aspectos, a melhoria do sistema produtivo. Foi apresentada uma proposta de um processo de reengenharia aplicado ao sistema produtivo, tendo em vista implementar as medidas de melhoria, indo ao encontro das situações identificadas, tornando assim o sistema produtivo mais eficiente.
Resumo:
No âmbito da unidade curricular Dissertação/Projeto/Estágio do 2ºano do Mestrado em Engenharia mecânica – Ramo Gestão Industrial do Instituto Superior de Engenharia do Porto, o presente trabalho de dissertação foi enquadrado num projeto industrial de melhoria com Instituto Kaizen, empresa de consultoria operacional. O projeto foi desenvolvido numa empresa de produção de componentes em ferro nodular destinados à indústria automóvel do mercado europeu, a Sakthi Portugal,SA. A realização deste projeto teve como objetivo a implementação do sistema de planeamento em Pull (produção puxada) na logística interna da Sakthi Portugal,SA recorrendo à metodologia Kaizen. Esta metodologia consiste na aplicação de ferramentas de TFM - Total Flow Management, integradas no Kaizen Management System. Neste projeto recorreu-se especialmente a um dos pilares que o constituem, o pilar do “Fluxo da Logística Interna”. Neste pilar encontram-se as várias metodologias utilizadas na otimização do fluxo de material e informação na logística interna. Estas metodologias foram aplicadas, com o objetivo do sistema produtivo operar de acordo com a necessidade do cliente, obtendo deste modo a minimização dos custo e o aumento da produtividade e qualidade. Em resultado da aplicação da metodologia seguida, foi possível atingir-se os objetivos definidos inicialmente e em alguns casos foi possível superar esses objetivos. Em função da abordagem integrada que foi seguida, conseguiu-se uma diminuição do “lead time” do processo de fabrico, redução dos produtos em curso de fabrico, libertação de espaço e redução de inventários. Estas melhorias resultaram numa movimentação interna na fábrica mais facilitada e num aumento global da produtividade. Como consequência positiva dos efeitos deste trabalho, pode-se apontar o facto de que a Sakthi Portugal SA aumentou a sua competitividade por tornar-se numa empresa mais dinâmica, mais adaptada ao mercado e com níveis de satisfação do cliente muito superiores.
Resumo:
In this work, the impact of distributed generation in the transmission expansion planning will be simulated through the performance of an optimization process for three different scenarios: the first without distributed generation, the second with distributed generation equivalent to 1% of the load, and the third with 5% of distributed generation. For modeling the expanding problem the load flow linearized method using genetic algorithms for optimization has been chosen. The test circuit used is a simplification of the south eastern Brazilian electricity system with 46 buses.
Resumo:
This chapter addresses the resolution of scheduling in manufacturing systems subject to perturbations. The planning of Manufacturing Systems involves frequently the resolution of a huge amount and variety of combinatorial optimisation problems with an important impact on the performance of manufacturing organisations. Examples of those problems are the sequencing and scheduling problems in manufacturing management, routing and transportation, layout design and timetabling problems.
Resumo:
In recent decades, all over the world, competition in the electric power sector has deeply changed the way this sector’s agents play their roles. In most countries, electric process deregulation was conducted in stages, beginning with the clients of higher voltage levels and with larger electricity consumption, and later extended to all electrical consumers. The sector liberalization and the operation of competitive electricity markets were expected to lower prices and improve quality of service, leading to greater consumer satisfaction. Transmission and distribution remain noncompetitive business areas, due to the large infrastructure investments required. However, the industry has yet to clearly establish the best business model for transmission in a competitive environment. After generation, the electricity needs to be delivered to the electrical system nodes where demand requires it, taking into consideration transmission constraints and electrical losses. If the amount of power flowing through a certain line is close to or surpasses the safety limits, then cheap but distant generation might have to be replaced by more expensive closer generation to reduce the exceeded power flows. In a congested area, the optimal price of electricity rises to the marginal cost of the local generation or to the level needed to ration demand to the amount of available electricity. Even without congestion, some power will be lost in the transmission system through heat dissipation, so prices reflect that it is more expensive to supply electricity at the far end of a heavily loaded line than close to an electric power generation. Locational marginal pricing (LMP), resulting from bidding competition, represents electrical and economical values at nodes or in areas that may provide economical indicator signals to the market agents. This article proposes a data-mining-based methodology that helps characterize zonal prices in real power transmission networks. To test our methodology, we used an LMP database from the California Independent System Operator for 2009 to identify economical zones. (CAISO is a nonprofit public benefit corporation charged with operating the majority of California’s high-voltage wholesale power grid.) To group the buses into typical classes that represent a set of buses with the approximate LMP value, we used two-step and k-means clustering algorithms. By analyzing the various LMP components, our goal was to extract knowledge to support the ISO in investment and network-expansion planning.
Resumo:
Important research effort has been devoted to the topic of optimal planning of distribution systems. The non linear nature of the system, the need to consider a large number of scenarios and the increasing necessity to deal with uncertainties make optimal planning in distribution systems a difficult task. Heuristic techniques approaches have been proposed to deal with these issues, overcoming some of the inherent difficulties of classic methodologies. This paper considers several methodologies used to address planning problems of electrical power distribution networks, namely mixedinteger linear programming (MILP), ant colony algorithms (AC), genetic algorithms (GA), tabu search (TS), branch exchange (BE), simulated annealing (SA) and the Bender´s decomposition deterministic non-linear optimization technique (BD). Adequacy of theses techniques to deal with uncertainties is discussed. The behaviour of each optimization technique is compared from the point of view of the obtained solution and of the methodology performance. The paper presents results of the application of these optimization techniques to a real case of a 10-kV electrical distribution system with 201 nodes that feeds an urban area.
Resumo:
Currently, power systems (PS) already accommodate a substantial penetration of distributed generation (DG) and operate in competitive environments. In the future, as the result of the liberalisation and political regulations, PS will have to deal with large-scale integration of DG and other distributed energy resources (DER), such as storage and provide market agents to ensure a flexible and secure operation. This cannot be done with the traditional PS operational tools used today like the quite restricted information systems Supervisory Control and Data Acquisition (SCADA) [1]. The trend to use the local generation in the active operation of the power system requires new solutions for data management system. The relevant standards have been developed separately in the last few years so there is a need to unify them in order to receive a common and interoperable solution. For the distribution operation the CIM models described in the IEC 61968/70 are especially relevant. In Europe dispersed and renewable energy resources (D&RER) are mostly operated without remote control mechanisms and feed the maximal amount of available power into the grid. To improve the network operation performance the idea of virtual power plants (VPP) will become a reality. In the future power generation of D&RER will be scheduled with a high accuracy. In order to realize VPP decentralized energy management, communication facilities are needed that have standardized interfaces and protocols. IEC 61850 is suitable to serve as a general standard for all communication tasks in power systems [2]. The paper deals with international activities and experiences in the implementation of a new data management and communication concept in the distribution system. The difficulties in the coordination of the inconsistent developed in parallel communication and data management standards - are first addressed in the paper. The upcoming unification work taking into account the growing role of D&RER in the PS is shown. It is possible to overcome the lag in current practical experiences using new tools for creating and maintenance the CIM data and simulation of the IEC 61850 protocol – the prototype of which is presented in the paper –. The origin and the accuracy of the data requirements depend on the data use (e.g. operation or planning) so some remarks concerning the definition of the digital interface incorporated in the merging unit idea from the power utility point of view are presented in the paper too. To summarize some required future work has been identified.
Resumo:
In the last twenty years genetic algorithms (GAs) were applied in a plethora of fields such as: control, system identification, robotics, planning and scheduling, image processing, and pattern and speech recognition (Bäck et al., 1997). In robotics the problems of trajectory planning, collision avoidance and manipulator structure design considering a single criteria has been solved using several techniques (Alander, 2003). Most engineering applications require the optimization of several criteria simultaneously. Often the problems are complex, include discrete and continuous variables and there is no prior knowledge about the search space. These kind of problems are very more complex, since they consider multiple design criteria simultaneously within the optimization procedure. This is known as a multi-criteria (or multiobjective) optimization, that has been addressed successfully through GAs (Deb, 2001). The overall aim of multi-criteria evolutionary algorithms is to achieve a set of non-dominated optimal solutions known as Pareto front. At the end of the optimization procedure, instead of a single optimal (or near optimal) solution, the decision maker can select a solution from the Pareto front. Some of the key issues in multi-criteria GAs are: i) the number of objectives, ii) to obtain a Pareto front as wide as possible and iii) to achieve a Pareto front uniformly spread. Indeed, multi-objective techniques using GAs have been increasing in relevance as a research area. In 1989, Goldberg suggested the use of a GA to solve multi-objective problems and since then other researchers have been developing new methods, such as the multi-objective genetic algorithm (MOGA) (Fonseca & Fleming, 1995), the non-dominated sorted genetic algorithm (NSGA) (Deb, 2001), and the niched Pareto genetic algorithm (NPGA) (Horn et al., 1994), among several other variants (Coello, 1998). In this work the trajectory planning problem considers: i) robots with 2 and 3 degrees of freedom (dof ), ii) the inclusion of obstacles in the workspace and iii) up to five criteria that are used to qualify the evolving trajectory, namely the: joint traveling distance, joint velocity, end effector / Cartesian distance, end effector / Cartesian velocity and energy involved. These criteria are used to minimize the joint and end effector traveled distance, trajectory ripple and energy required by the manipulator to reach at destination point. Bearing this ideas in mind, the paper addresses the planning of robot trajectories, meaning the development of an algorithm to find a continuous motion that takes the manipulator from a given starting configuration up to a desired end position without colliding with any obstacle in the workspace. The chapter is organized as follows. Section 2 describes the trajectory planning and several approaches proposed in the literature. Section 3 formulates the problem, namely the representation adopted to solve the trajectory planning and the objectives considered in the optimization. Section 4 studies the algorithm convergence. Section 5 studies a 2R manipulator (i.e., a robot with two rotational joints/links) when the optimization trajectory considers two and five objectives. Sections 6 and 7 show the results for the 3R redundant manipulator with five goals and for other complementary experiments are described, respectively. Finally, section 8 draws the main conclusions.
Resumo:
In this work the mission control and supervision system developed for the ROAZ Autonomous Surface Vehicle is presented. Complexity in mission requirements coupled with flexibility lead to the design of a modular hierarchical mission control system based on hybrid systems control. Monitoring and supervision control for a vehicle such as ROAZ mission is not an easy task using tools with low complexity and yet powerful enough. A set of tools were developed to perform both on board mission control and remote planning and supervision. “ROAZ- Mission Control” was developed to be used in support to bathymetric and security missions performed in river and at seas.