4 resultados para Patient Experiences in ED
em Instituto Politécnico do Porto, Portugal
Resumo:
Objective Patient-centredness has become an important aspect of health service delivery; however, there are a limited number of studies that focus on this concept in the domain of hearing healthcare. The objective of this study was to examine and compare audiologists’ preferences for patient-centredness in Portugal, India and Iran. Design The study used a cross-sectional survey design with audiologists recruited from three different countries. Participants A total of 191 fully-completed responses were included in the analysis (55 from Portugal, 78 from India and 58 from Iran). Main outcome measure The Patient–Practitioner Orientation Scale (PPOS). Results PPOS mean scores suggest that audiologists have a preference for patient-centredness (ie, mean of 3.6 in a 5-point scale). However, marked differences were observed between specific PPOS items suggesting these preferences vary across clinical situations. A significant level of difference (p<0.001) was found between audiologists’ preferences for patient-centredness in three countries. Audiologists in Portugal had a greater preference for patient-centredness when compared to audiologists in India and Iran, although no significant differences were found in terms of age and duration of experience among these sample populations. Conclusions There are differences and similarities in audiologists’ preferences for patient-centredness among countries. These findings may have implications for the training of professionals and also for clinical practice in terms of optimising hearing healthcare across countries.
Resumo:
Currently, power systems (PS) already accommodate a substantial penetration of distributed generation (DG) and operate in competitive environments. In the future, as the result of the liberalisation and political regulations, PS will have to deal with large-scale integration of DG and other distributed energy resources (DER), such as storage and provide market agents to ensure a flexible and secure operation. This cannot be done with the traditional PS operational tools used today like the quite restricted information systems Supervisory Control and Data Acquisition (SCADA) [1]. The trend to use the local generation in the active operation of the power system requires new solutions for data management system. The relevant standards have been developed separately in the last few years so there is a need to unify them in order to receive a common and interoperable solution. For the distribution operation the CIM models described in the IEC 61968/70 are especially relevant. In Europe dispersed and renewable energy resources (D&RER) are mostly operated without remote control mechanisms and feed the maximal amount of available power into the grid. To improve the network operation performance the idea of virtual power plants (VPP) will become a reality. In the future power generation of D&RER will be scheduled with a high accuracy. In order to realize VPP decentralized energy management, communication facilities are needed that have standardized interfaces and protocols. IEC 61850 is suitable to serve as a general standard for all communication tasks in power systems [2]. The paper deals with international activities and experiences in the implementation of a new data management and communication concept in the distribution system. The difficulties in the coordination of the inconsistent developed in parallel communication and data management standards - are first addressed in the paper. The upcoming unification work taking into account the growing role of D&RER in the PS is shown. It is possible to overcome the lag in current practical experiences using new tools for creating and maintenance the CIM data and simulation of the IEC 61850 protocol – the prototype of which is presented in the paper –. The origin and the accuracy of the data requirements depend on the data use (e.g. operation or planning) so some remarks concerning the definition of the digital interface incorporated in the merging unit idea from the power utility point of view are presented in the paper too. To summarize some required future work has been identified.
Resumo:
João Vinagre, Vasco Pinto and Ricardo Celestino contributed equally to the manuscript.