111 resultados para Partial time jamming
em Instituto Politécnico do Porto, Portugal
Resumo:
Dynamically reconfigurable systems have benefited from a new class of FPGAs recently introduced into the market, which allow partial and dynamic reconfiguration at run-time, enabling multiple independent functions from different applications to share the same device, swapping resources as needed. When the sequence of tasks to be performed is not predictable, resource allocation decisions have to be made on-line, fragmenting the FPGA logic space. A rearrangement may be necessary to get enough contiguous space to efficiently implement incoming functions, to avoid spreading their components and, as a result, degrading their performance. This paper presents a novel active replication mechanism for configurable logic blocks (CLBs), able to implement on-line rearrangements, defragmenting the available FPGA resources without disturbing those functions that are currently running.
Resumo:
Reconfigurable computing experienced a considerable expansion in the last few years, due in part to the fast run-time partial reconfiguration features offered by recent SRAM-based Field Programmable Gate Arrays (FPGAs), which allowed the implementation in real-time of dynamic resource allocation strategies, with multiple independent functions from different applications sharing the same logic resources in the space and temporal domains. However, when the sequence of reconfigurations to be performed is not predictable, the efficient management of the logic space available becomes the greatest challenge posed to these systems. Resource allocation decisions have to be made concurrently with system operation, taking into account function priorities and optimizing the space currently available. As a consequence of the unpredictability of this allocation procedure, the logic space becomes fragmented, with many small areas of free resources failing to satisfy most requests and so remaining unused. A rearrangement of the currently running functions is therefore necessary, so as to obtain enough contiguous space to implement incoming functions, avoiding the spreading of their components and the resulting degradation of system performance. A novel active relocation procedure for Configurable Logic Blocks (CLBs) is herein presented, able to carry out online rearrangements, defragmenting the available FPGA resources without disturbing functions currently running.
Resumo:
in RoboCup 2007: Robot Soccer World Cup XI
Resumo:
Dissertação para obtenção do Grau de Mestre em Contabilidade e Finanças Orientador: Mestre Paulino Manuel Leite da Silva
Resumo:
The introduction of wind power generation in several countries around the world, including in European countries, where energy policy directives have encouraged the use of renewables, led to several changes in market and power systems operation. The intensive integration of these sources has led to situations in which the demand is lower than the available renewable resources. In these situations a part of the available generation is wasted if not used for storage or to supply additional demand. This paper proposes a real time demand response methodology based on changing the electricity price for the consumers expecting an increase in the demand in the periods in which that demand is lower than the available renewable generation. The consumers response to the changes in electricity price is characterized by their price elasticity of demand considered distinct for each consumer type. The proposed methodology is applied to the Portuguese power system, in the context of the Iberian electricity market (MIBEL). The renewable-based producers are considered as special producers, with special tariffs, and so it is important to use the energy available as it will be paid anyway. In this context, consumers are entities actively participating in the operation of the market.
Resumo:
The use of distributed energy resources, based on natural intermittent power sources, like wind generation, in power systems imposes the development of new adequate operation management and control methodologies. A short-term Energy Resource Management (ERM) methodology performed in two phases is proposed in this paper. The first one addresses the day-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. The ERM scheduling is a complex optimization problem due to the high quantity of variables and constraints. In this paper the main goal is to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixedinteger non-linear programming approach. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units and 1000 electric vehicles has been implemented in a simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.
Resumo:
This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process it is necessary the update of generation and consumption operation and of the storage and electric vehicles storage status. Besides the new operation condition, it is important more accurate forecast values of wind generation and of consumption using results of in short-term and very short-term methods. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented.
Resumo:
The increasing importance given by environmental policies to the dissemination and use of wind power has led to its fast and large integration in power systems. In most cases, this integration has been done in an intensive way, causing several impacts and challenges in current and future power systems operation and planning. One of these challenges is dealing with the system conditions in which the available wind power is higher than the system demand. This is one of the possible applications of demand response, which is a very promising resource in the context of competitive environments that integrates even more amounts of distributed energy resources, as well as new players. The methodology proposed aims the maximization of the social welfare in a smart grid operated by a virtual power player that manages the available energy resources. When facing excessive wind power generation availability, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. The proposed method is especially useful when actual and day-ahead wind forecast differ significantly. The proposed method has been computationally implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20310 consumers and 548 distributed generators, some of them with must take contracts.
Resumo:
Recent changes in power systems mainly due to the substantial increase of distributed generation and to the operation in competitive environments has created new challenges to operation and planning. In this context, Virtual Power Players (VPP) can aggregate a diversity of players, namely generators and consumers, and a diversity of energy resources, including electricity generation based on several technologies, storage and demand response. Demand response market implementation has been done in recent years. Several implementation models have been considered. An important characteristic of a demand response program is the trigger criterion. A program for which the event trigger depends on the Locational Marginal Price (LMP) used by the New England Independent System operator (ISO-NE) inspired the present paper. This paper proposes a methodology to support VPP demand response programs management. The proposed method has been computationally implemented and its application is illustrated using a 32 bus network with intensive use of distributed generation. Results concerning the evaluation of the impact of using demand response events are also presented.
Resumo:
In competitive electricity markets with deep concerns for the efficiency level, demand response programs gain considerable significance. As demand response levels have decreased after the introduction of competition in the power industry, new approaches are required to take full advantage of demand response opportunities. This paper presents DemSi, a demand response simulator that allows studying demand response actions and schemes in distribution networks. It undertakes the technical validation of the solution using realistic network simulation based on PSCAD. The use of DemSi by a retailer in a situation of energy shortage, is presented. Load reduction is obtained using a consumer based price elasticity approach supported by real time pricing. Non-linear programming is used to maximize the retailer’s profit, determining the optimal solution for each envisaged load reduction. The solution determines the price variations considering two different approaches, price variations determined for each individual consumer or for each consumer type, allowing to prove that the approach used does not significantly influence the retailer’s profit. The paper presents a case study in a 33 bus distribution network with 5 distinct consumer types. The obtained results and conclusions show the adequacy of the used methodology and its importance for supporting retailers’ decision making.
Resumo:
The short article attempts to make some very brief reflections on the effects a lack of public policies positively discriminatory in terms of public employment retirement. In particular, the observation of the absurd contradiction between the average age of retirement at the time of death (for men and women) and the average pension time for men and women in public employment in Portugal.
Resumo:
Mestrado em Engenharia Electrotécnica e de Computadores
Resumo:
O presente estudo diz respeito a um trabalho de pesquisa no âmbito de uma Tese de Mestrado incluída no segundo ciclo de estudos do curso de Engenharia Geotécnica e Geoambiente, realizado sobre as condições de desidroxilação para a obtenção de metacaulino com propriedades cimentíceas, a partir da fracção argilosa proveniente dos finos residuais da produção de areias de natureza granítica. O produto resultante da alteração e desintegração dos feldspatos constituintes dos granitos são ricos em caulinite. Na natureza e em particular no Norte de Portugal, existem significativos depósitos cauliníticos com características potenciadoras para a produção de metacaulino. O metacaulino utilizado neste estudo foi obtido de uma amostra de argila submetida a 750oC, por um período de tempo de 30 minutos, processo que permitiu a desidroxilação quase total da matéria-prima, transformando esta numa fase amorfa e irreversível, com propriedades pozolânicas. Os metacaulinos, também conhecidos por geopolímeros, são produtos de fácil produção utilizando uma matéria-prima abundante e proporcionam a obtenção de novos produtos que permitem a substituição parcial do cimento Portland normal na composição das pastas de betão, com vantagens significativas no comportamento mecânico e na resistência aos agentes atmosféricos. Neste estudo são apresentados os resultados dos ensaios de caracterização da matéria-prima, das condições de calcinação e do produto resultante da desidroxilação, nomeadamente a determinação da pozolanicidade e das características fundamentais para a aplicabilidade do produto. No âmbito da especialidade de Georrecursos, consideramos que este trabalho está perfeitamente adequado, já que, para além do estudo para o conhecimento das propriedades da matéria-prima, foi possível, através das alterações introduzidas com o tratamento térmico, obter um novo produto, cuja utilização terá importantes reflexos na sustentabilidade dos recursos naturais e sua utilização.
Resumo:
Actualmente, os sistemas embebidos estão presentes em toda a parte. Embora grande parte da população que os utiliza não tenha a noção da sua presença, na realidade, se repentinamente estes sistemas deixassem de existir, a sociedade iria sentir a sua falta. A sua utilização massiva deve-se ao facto de estarem practicamente incorporados em quase os todos dispositivos electrónicos de consumo, telecomunicações, automação industrial e automóvel. Influenciada por este crescimento, a comunidade científica foi confrontada com novos problemas distribuídos por vários domínios científicos, dos quais são destacados a gestão da qualidade de serviço e gestão de recursos - domínio encarregue de resolver problemas relacionados com a alocação óptima de recursos físicos, tais como rede, memória e CPU. Existe na literatura um vasto conjunto de modelos que propõem soluções para vários problemas apresentados no contexto destes domínios científicos. No entanto, não é possível encontrar modelos que lidem com a gestão de recursos em ambientes de execução cooperativos e abertos com restrições temporais utilizando coligações entre diferentes nós, de forma a satisfazer os requisitos não funcionais das aplicações. Devido ao facto de estes sistemas serem dinâmicos por natureza, apresentam a característica de não ser possível conhecer, a priori, a quantidade de recursos necessários que uma aplicação irá requerer do sistema no qual irá ser executada. Este conhecimento só é adquirido aquando da execução da aplicação. De modo a garantir uma gestão eficiente dos recursos disponíveis, em sistemas que apresentam um grande dinamismo na execução de tarefas com e sem restrições temporais, é necessário garantir dois aspectos fundamentais. O primeiro está relacionado com a obtenção de garantias na execução de tarefas de tempo-real. Estas devem sempre ser executadas dentro da janela temporal requirida. O segundo aspecto refere a necessidade de garantir que todos os recursos necessários à execução das tarefas são fornecidos, com o objectivo de manter os níveis de performance quer das aplicações, quer do próprio sistema. Tendo em conta os dois aspectos acima mencionados, o projecto CooperatES foi especificado com o objectivo de permitir a dispositivos com poucos recursos uma execução colectiva de serviços com os seus vizinhos, de modo a cumprir com as complexas restrições de qualidade de serviço impostas pelos utilizadores ou pelas aplicações. Decorrendo no contexto do projecto CooperatES, o trabalho resultante desta tese tem como principal objectivo avaliar a practicabilidade dos conceitos principais propostos no âmbito do projecto. O trabalho em causa implicou a escolha e análise de uma plataforma, a análise de requisitos, a implementação e avaliação de uma framework que permite a execução cooperativa de aplicações e serviços que apresentem requisitos de qualidade de serviço. Do trabalho desenvolvido resultaram as seguintes contribuições: Análise das plataformas de código aberto que possam ser utilizadas na implementação dos conceitos relacionados com o projecto CooperatES; Critérios que influenciaram a escolha da plataforma Android e um estudo focado na análise da plataforma sob uma perspectiva de sistemas de tempo-real; Experiências na implementação dos conceitos do projecto na plataforma Android; Avaliação da practicabilidade dos conceitos propostos no projecto CooperatES; Proposta de extensões que permitam incorporar características de sistemas de tempo real abertos na plataforma Android.