12 resultados para Pacheco de Narvaez, Luis
em Instituto Politécnico do Porto, Portugal
Resumo:
Although power-line communication (PLC) is not a new technology, its use to support communication with timing requirements is still the focus of ongoing research. Recently, a new infrastructure was presented, intended for communication using power lines from a central location to geographically dispersed nodes using inexpensive devices. This new infrastructure uses a two-level hierarchical power-line system, together with an IP-based network. Within this infrastructure, in order to provide end-toend communication through the two levels of the powerline system, it is necessary to fully understand the behaviour of the underlying network layers. The masterslave behaviour of the PLC MAC, together with the inherent dynamic topology of power-line networks are important issues that must be fully characterised. Therefore, in this paper we present a simulation model which is being used to study and characterise the behaviour of power-line communication.
Resumo:
Recent technological developments are pulling fieldbus networks to support a new wide class of applications, such as industrial multimedia applications. These applications are usually supported by the widely used TCP/IP stack. It is thus essential to provide support to TCP/IP based applications, in fieldbus networks. This paper presents an effort that is being carried out to integrate the TCP/IP and PROFIBUS stacks, in order to support industrial multimedia applications, whilst guarantying the timing requirements of control-related traffic.
Resumo:
In this paper we describe a real-time industrial communication network able to support both controlrelated and multimedia traffic. The industrial communication network is based on the PROFIBUS standard, with multimedia capabilities being provided by an adequate integration of TCP/IP protocols into the PROFIBUS stack. From the operational point of view the integration of TCP/IP into PROFIBUS is by itself a challenge, since the master-slave nature of the PROFIBUS MAC makes complex the implementation of the symmetry inherent to IP communications. From the timeliness point of view the challenge is two folded. On one hand the multimedia traffic should not interfere with the timing requirements of the "native" control-related PROFIBUS traffic (typically hard real-time). On the other hand multimedia traffic requires certain levels of quality-of-service to be attained. In this paper we provide a methodology that enables fulfilling the timing requirements for both types of traffic in these real-time industrial LAN. Moreover, we describe suitable algorithms for the scheduling support of concurrent multimedia streams.
Resumo:
This paper summarises the most important solutions that have emerged from the work carried out by our team within the framework of the EU (IST-1999-11316) project RFieldbus - High Performance Wireless Fieldbus in Industrial Multimedia-Related Environment. Within this project, Profibus was chosen as the fieldbus platform. Essentially, extensions to the current Profibus standard are being developed in order to provide Profibus with wireless, mobility and industrialmultimedia capabilities. In fact, providing these extensions means fulfilling strong requirements, namely to encompass the communication between wired (currently available) and wireless/mobile devices and to support real-time control traffic and multimedia traffic in the same network.
Resumo:
Although power-line communication (PLC) is not a new technology, its use to support data communication with timing requirements is still the focus of ongoing research. A new infrastructure intended for communication using power lines from a central location to dispersed nodes using inexpensive devices was presented recently. This new infrastructure uses a two-level hierarchical power-line system, together with an IP-based network. Due to the master-slave behaviour of the PLC medium access, together with the inherent dynamic topology of power-line networks, a mechanism to provide end-to-end communication through the two levels of the power-line system must be provided. In this paper we introduce the architecture of the PLC protocol layer that is being implemented for this end.
Resumo:
With the current complexity of communication protocols, implementing its layers totally in the kernel of the operating system is too cumbersome, and it does not allow use of the capabilities only available in user space processes. However, building protocols as user space processes must not impair the responsiveness of the communication. Therefore, in this paper we present a layer of a communication protocol, which, due to its complexity, was implemented in a user space process. Lower layers of the protocol are, for responsiveness issues, implemented in the kernel. This protocol was developed to support large-scale power-line communication (PLC) with timing requirements.
Resumo:
Recent developments in the factory floor technologies together with the widespread use of TCP/IP and the Internet are increasing the eagerness to support a new wide class of devices and applications, such as industrial multimedia applications, in factory floor networks. This paper presents how this new field of applications can be put into practice, via a manufacturing cell field trial being implemented. This manufacturing automation field trial involves the use of traditional distributed computer control systems and 'factory-floor-oriented' multimedia (e.g. voice, video) application services.
Resumo:
This paper describes the communication stack of the REMPLI system: a structure using power-lines and IPbased networks for communication, for data acquisition and control of energy distribution and consumption. It is furthermore prepared to use alternative communication media like GSM or analog modem connections. The REMPLI system provides communication service for existing applications, namely automated meter reading, energy billing and domotic applications. The communication stack, consisting of physical, network, transport, and application layer is described as well as the communication services provided by the system. We show how the peculiarities of the power-line communication influence the design of the communication stack, by introducing requirements to efficiently use the limited bandwidth, optimize traffic and implement fair use of the communication medium for the extensive communication partners.
Resumo:
This document makes a brief review on the results of the REMPLI Discreet Event Simulation system used to test the REMPLI Transport Layer. An introduction on the REMPLI Discreet Event Simulation system is made on HURRAY-TR-070903.
Resumo:
This document presents the design choices on the simulation mechanism used to test the Tansport Layer implementation in the REMPLI project [www.rempli.org].
Resumo:
Comentário da figura e obra de Jorge Luis Borges, e da sua relação com a música e as tradições de Buenos Aires.
Resumo:
Poster presented in Redes de Veiculos nas sociedades do futuro (RVSF 2015). 3, Jun, 2015. Castelo Branco, Portugal.