77 resultados para Operate

em Instituto Politécnico do Porto, Portugal


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The large increase of renewable energy sources and Distributed Generation (DG) of electricity gives place to the Virtual Power Producer (VPP) concept. VPPs can reinforce the importance of these generation technologies making them valuable in electricity markets. One of the most important tasks of a VPP is the conjugation of technologies to obtain a consistent set of associated producers and allow them to operate in the electric market. This paper presents some characteristics regarding already existent technologies and relevant aspects for producers and for VPP.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The increasing number of players that operate in power systems leads to a more complex management. In this paper a new multi-agent platform is proposed, which simulates the real operation of power system players. MASGriP – A Multi-Agent Smart Grid Simulation Platform is presented. Several consumer and producer agents are implemented and simulated, considering real characteristics and different goals and actuation strategies. Aggregator entities, such as Virtual Power Players and Curtailment Service Providers are also included. The integration of MASGriP agents in MASCEM (Multi-Agent System for Competitive Electricity Markets) simulator allows the simulation of technical and economical activities of several players. An energy resources management architecture used in microgrids is also explained.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The large penetration of intermittent resources, such as solar and wind generation, involves the use of storage systems in order to improve power system operation. Electric Vehicles (EVs) with gridable capability (V2G) can operate as a means for storing energy. This paper proposes an algorithm to be included in a SCADA (Supervisory Control and Data Acquisition) system, which performs an intelligent management of three types of consumers: domestic, commercial and industrial, that includes the joint management of loads and the charge/discharge of EVs batteries. The proposed methodology has been implemented in a SCADA system developed by the authors of this paper – the SCADA House Intelligent Management (SHIM). Any event in the system, such as a Demand Response (DR) event, triggers the use of an optimization algorithm that performs the optimal energy resources scheduling (including loads and EVs), taking into account the priorities of each load defined by the installation users. A case study considering a specific consumer with several loads and EVs is presented in this paper.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The concept of demand response has a growing importance in the context of the future power systems. Demand response can be seen as a resource like distributed generation, storage, electric vehicles, etc. All these resources require the existence of an infrastructure able to give players the means to operate and use them in an efficient way. This infrastructure implements in practice the smart grid concept, and should accommodate a large number of diverse types of players in the context of a competitive business environment. In this paper, demand response is optimally scheduled jointly with other resources such as distributed generation units and the energy provided by the electricity market, minimizing the operation costs from the point of view of a virtual power player, who manages these resources and supplies the aggregated consumers. The optimal schedule is obtained using two approaches based on particle swarm optimization (with and without mutation) which are compared with a deterministic approach that is used as a reference methodology. A case study with two scenarios implemented in DemSi, a demand Response simulator developed by the authors, evidences the advantages of the use of the proposed particle swarm approaches.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The large increase of Distributed Generation (DG) in Power Systems (PS) and specially in distribution networks makes the management of distribution generation resources an increasingly important issue. Beyond DG, other resources such as storage systems and demand response must be managed in order to obtain more efficient and “green” operation of PS. More players, such as aggregators or Virtual Power Players (VPP), that operate these kinds of resources will be appearing. This paper proposes a new methodology to solve the distribution network short term scheduling problem in the Smart Grid context. This methodology is based on a Genetic Algorithms (GA) approach for energy resource scheduling optimization and on PSCAD software to obtain realistic results for power system simulation. The paper includes a case study with 99 distributed generators, 208 loads and 27 storage units. The GA results for the determination of the economic dispatch considering the generation forecast, storage management and load curtailment in each period (one hour) are compared with the ones obtained with a Mixed Integer Non-Linear Programming (MINLP) approach.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Currently, Power Systems (PS) already accommodate a substantial penetration of DG and operate in competitive environments. In the future PS will have to deal with largescale integration of DG and other distributed energy resources (DER), such as storage means, and provide to market agents the means to ensure a flexible and secure operation. This cannot be done with the traditional PS operation. SCADA (Supervisory Control and Data Acquisition) is a vital infrastructure for PS. Current SCADA adaptation to accommodate the new needs of future PS does not allow to address all the requirements. In this paper we present a new conceptual design of an intelligent SCADA, with a more decentralized, flexible, and intelligent approach, adaptive to the context (context awareness). Once a situation is characterized, data and control options available to each entity are re-defined according to this context, taking into account operation normative and a priori established contracts. The paper includes a case-study of using future SCADA features to use DER to deal with incident situations, preventing blackouts.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Currently, power systems (PS) already accommodate a substantial penetration of distributed generation (DG) and operate in competitive environments. In the future, as the result of the liberalisation and political regulations, PS will have to deal with large-scale integration of DG and other distributed energy resources (DER), such as storage and provide market agents to ensure a flexible and secure operation. This cannot be done with the traditional PS operational tools used today like the quite restricted information systems Supervisory Control and Data Acquisition (SCADA) [1]. The trend to use the local generation in the active operation of the power system requires new solutions for data management system. The relevant standards have been developed separately in the last few years so there is a need to unify them in order to receive a common and interoperable solution. For the distribution operation the CIM models described in the IEC 61968/70 are especially relevant. In Europe dispersed and renewable energy resources (D&RER) are mostly operated without remote control mechanisms and feed the maximal amount of available power into the grid. To improve the network operation performance the idea of virtual power plants (VPP) will become a reality. In the future power generation of D&RER will be scheduled with a high accuracy. In order to realize VPP decentralized energy management, communication facilities are needed that have standardized interfaces and protocols. IEC 61850 is suitable to serve as a general standard for all communication tasks in power systems [2]. The paper deals with international activities and experiences in the implementation of a new data management and communication concept in the distribution system. The difficulties in the coordination of the inconsistent developed in parallel communication and data management standards - are first addressed in the paper. The upcoming unification work taking into account the growing role of D&RER in the PS is shown. It is possible to overcome the lag in current practical experiences using new tools for creating and maintenance the CIM data and simulation of the IEC 61850 protocol – the prototype of which is presented in the paper –. The origin and the accuracy of the data requirements depend on the data use (e.g. operation or planning) so some remarks concerning the definition of the digital interface incorporated in the merging unit idea from the power utility point of view are presented in the paper too. To summarize some required future work has been identified.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the energy management of the isolated operation of small power system, the economic scheduling of the generation units is a crucial problem. Applying right timing can maximize the performance of the supply. The optimal operation of a wind turbine, a solar unit, a fuel cell and a storage battery is searched by a mixed-integer linear programming implemented in General Algebraic Modeling Systems (GAMS). A Virtual Power Producer (VPP) can optimal operate the generation units, assured the good functioning of equipment, including the maintenance, operation cost and the generation measurement and control. A central control at system allows a VPP to manage the optimal generation and their load control. The application of methodology to a real case study in Budapest Tech, demonstrates the effectiveness of this method to solve the optimal isolated dispatch of the DC micro-grid renewable energy park. The problem has been converged in 0.09 s and 30 iterations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The management of energy resources for islanded operation is of crucial importance for the successful use of renewable energy sources. A Virtual Power Producer (VPP) can optimally operate the resources taking into account the maintenance, operation and load control considering all the involved cost. This paper presents the methodology approach to formulate and solve the problem of determining the optimal resource allocation applied to a real case study in Budapest Tech’s. The problem is formulated as a mixed-integer linear programming model (MILP) and solved by a deterministic optimization technique CPLEX-based implemented in General Algebraic Modeling Systems (GAMS). The problem has also been solved by Evolutionary Particle Swarm Optimization (EPSO). The obtained results are presented and compared.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A supervisory control and data acquisition (SCADA) system is an integrated platform that incorporates several components and it has been applied in the field of power systems and several engineering applications to monitor, operate and control a lot of processes. In the future electrical networks, SCADA systems are essential for an intelligent management of resources like distributed generation and demand response, implemented in the smart grid context. This paper presents a SCADA system for a typical residential house. The application is implemented on MOVICON™11 software. The main objective is to manage the residential consumption, reducing or curtailing loads to keep the power consumption in or below a specified setpoint, imposed by the costumer and the generation availability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The current study aims to study Hospital volunteers’ intention to stay in an organization through understanding motivation, management factors and satisfaction. Design/methodology/approach – A total of 304 Hospital volunteers, mainly women, completed a questionnaire measuring motivations, management factors, satisfaction and intention to stay. In this study structural equation modelling was used. Findings – Results demonstrate that there is a positive relationship between (a) motivation and satisfaction, (b) management factors and satisfaction, (c) satisfaction and intention to stay and (d) motivation and management factors. These results present important outcomes that should be reflected in the way organizations operate. Research limitations/implications – This research was restricted to a health care context and to the opinion of only one stakeholder (volunteers). We assume volunteer intent to stay is a main predictor of retention. However, there are other variables not considered here that might influence intent to stay. Practical implications – This research indicates aspects which are most valued by volunteers and allows NPOs to design and establish appropriate and assertive management policies. Originality/value – The value of this paper is that it looks at understanding what factors influence volunteers’ intention to stay.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O presente estudo tem por finalidade analisar o Centro de Reabilitação Profissional de Gaia (CRPG), enquanto associação que exerce a sua missão tendo por base a responsabilidade social. O CRPG foi a primeira associação em Portugal a apresentar a preocupação de demonstrar a qualidade das práticas que exerce, através da Certificação da Excelência dos Serviços Sociais. Esta certificação é efetuada segundo o sistema European Quality in Social Services (EQUASS), o qual permite o reconhecimento, garantia e certificação da qualidade às organizações que atuam no âmbito dos serviços sociais, tais como a reabilitação, a formação profissional, a assistência e cuidados às pessoas em situação de fragilidade social. Salienta-se a este propósito o cariz voluntário para a aquisição deste tipo de certificação, o que comprova, além de outras preocupações, como a garantia da qualidade dos serviços prestado, a conduta socialmente responsável do CRPG.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose- Economics and business have evolved as sciences in order to accommodate more of ‘real world’ solutions for the problems approached. In many cases, both business and economics have been supported by other disciplines in order to obtain a more complete framework for the study of complex issues. The aim of this paper is to explore the contribution of three heterodox economics disciplines to the knowledge of business co-operation. Design/methodology/approach- This approach is theoretical and it shows that many relevant aspects of business co-operation have been proposed by economic geography, institutional economics, and economic sociology. Findings- This paper highlights the business mechanisms of co-operation, reflecting on the role of places, institution and the social context where businesses operate. Research Implications- It contributes with a theoretical framework for the explanation of business co-operations and networks that goes beyond the traditional economics theories. Originality/value- This paper contributes with a framework for the study of business co-operation both from an economics and management perspective. This framework embodies a number of non-quantitative issues that are critical for understanding the complex networks in which firms operate.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mestrado em Engenharia Informática

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A presente dissertação apresenta uma solução para o problema de modelização tridimensional de galerias subterrâneas. O trabalho desenvolvido emprega técnicas provenientes da área da robótica móvel para obtenção um sistema autónomo móvel de modelização, capaz de operar em ambientes não estruturados sem acesso a sistemas de posicionamento global, designadamente GPS. Um sistema de modelização móvel e autónomo pode ser bastante vantajoso, pois constitui um método rápido e simples de monitorização das estruturas e criação de representações virtuais das galerias com um elevado nível de detalhe. O sistema de modelização desloca-se no interior dos túneis para recolher informações sensoriais sobre a geometria da estrutura. A tarefa de organização destes dados com vista _a construção de um modelo coerente, exige um conhecimento exacto do percurso praticado pelo sistema, logo o problema de localização da plataforma sensorial tem que ser resolvido. A formulação de um sistema de localização autónoma tem que superar obstáculos que se manifestam vincadamente nos ambientes underground, tais como a monotonia estrutural e a já referida ausência de sistemas de posicionamento global. Neste contexto, foi abordado o conceito de SLAM (Simultaneous Loacalization and Mapping) para determinação da localização da plataforma sensorial em seis graus de liberdade. Seguindo a abordagem tradicional, o núcleo do algoritmo de SLAM consiste no filtro de Kalman estendido (EKF { Extended Kalman Filter ). O sistema proposto incorpora métodos avançados do estado da arte, designadamente a parametrização em profundidade inversa (Inverse Depth Parametrization) e o método de rejeição de outliers 1-Point RANSAC. A contribuição mais importante do método por nós proposto para o avanço do estado da arte foi a fusão da informação visual com a informação inercial. O algoritmo de localização foi testado com base em dados reais, adquiridos no interior de um túnel rodoviário. Os resultados obtidos permitem concluir que, ao fundir medidas inerciais com informações visuais, conseguimos evitar o fenómeno de degeneração do factor de escala, comum nas aplicações de localização através de sistemas puramente monoculares. Provámos simultaneamente que a correcção de um sistema de localização inercial através da consideração de informações visuais é eficaz, pois permite suprimir os desvios de trajectória que caracterizam os sistemas de dead reckoning. O algoritmo de modelização, com base na localização estimada, organiza no espaço tridimensional os dados geométricos adquiridos, resultando deste processo um modelo em nuvem de pontos, que posteriormente _e convertido numa malha triangular, atingindo-se assim uma representação mais realista do cenário original.