6 resultados para Non-ideal power sources
em Instituto Politécnico do Porto, Portugal
Resumo:
The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.
Resumo:
Este trabalho baseia se na necessidade de aumentar as fontes renováveis de energia, reduzindo assim a dependência de fontes não renováveis, principalmente as poluentes como as de provenientes de combustíveis fosseis. A fonte de energia renovável explorada neste trabalho é a advinda de energia solar, com a utilização de painéis solares e métodos de extração para converter esta energia em energia elétrica e assim poder utilizar esta energia de forma eficiente. A energia produzida por painéis fotovoltaicos se apresenta em forma de corrente continua, tendo assim a necessidade do uso de conversores CC-CA, ou ditos inversores de tensão, para utilização da mesma, já que a maioria do equipamentos que utilizam energia elétrica são construídos em forma a serem abastecidos com energia elétrica em corrente alternada. Como este trabalho foca na injeção da energia produzida pelos painéis FV na rede de distribuição de baixa tensão, faz se necessário o uso de um PLL para garantir que o sistema inversor esteja em sincronismo com a rede de distribuição e possa garantir a entrega de energia ativa. Por fim mas não menos importante, é utilizado neste projeto técnicas de MPPT para garantir um maior aproveitamento da energia proveniente dos painéis FV, ajudando assim a melhorar a eficácia deste tipo de energia, sendo mais fiável e viável.
Resumo:
Certain materials used and produced in a wide range of non-nuclear industries contain enhanced activity concentrations of natural radionuclides. In particular, electricity production from coal is one of the major sources of increased human exposure to naturally occurring radioactive materials. A methodology was developed to assess the radiological impact due to natural radiation background. The developed research was applied to a specific case study, the Sines coal-fired power plant, located in the southwest coastline of Portugal. Gamma radiation measurements were carried out with two different instruments: a sodium iodide scintillation detector counter (SPP2 NF, Saphymo) and a gamma ray spectrometer with energy discrimination (Falcon 5000, Canberra). Two circular survey areas were defined within 20 km of the power plant. Forty relevant measurements points were established within the sampling area: 15 urban and 25 suburban locations. Additionally, ten more measurements points were defined, mostly at the 20-km area. The registered gamma radiation varies from 20 to 98.33 counts per seconds (c.p.s.) corresponding to an external gamma exposure rate variable between 87.70 and 431.19 nGy/h. The highest values were measured at locations near the power plant and those located in an area within the 6 and 20 km from the stacks. In situ gamma radiation measurements with energy discrimination identified natural emitting nuclides as well as their decay products (Pb-212, Pb-2142, Ra-226, Th-232, Ac-228, Th-234, Pa-234, U- 235, etc.). According to the results, an influence from the stacks emissions has been identified both qualitatively and quantitatively. The developed methodology accomplished the lack of data in what concerns to radiation rate in the vicinity of Sines coal-fired power plant and consequently the resulting exposure to the nearby population.
Resumo:
Certain materials used and produced in a wide range of non-nuclear industries contain enhanced activity concentrations of natural radionuclides. In particular, electricity production from coal is one of the major sources of increased exposure to man from enhanced naturally occurring materials. Over the past decades there has been some discussion about the elevated natural background radiation in the area near coal-fired power plants due to high uranium and thorium content present in coal. This work describes the methodology developed to assess the radiological impact due to natural radiation background increasing levels, potentially originated by a coal-fired power plant’s operation. Gamma radiation measurements have been done with two different instruments: a scintillometer (SPP2 NF, Saphymo) and a gamma ray spectrometer with energy discrimination (Falcon 5000, Canberra). A total of 40 relevant sampling points were established at locations within 20 km from the power plant: 15 urban and 25 suburban measured stations. The highest values were measured at the sampling points near to the power plant and those located in the area within the 6 and 20 km from the stacks. This may be explained by the presence of a huge coal pile (1.3 million tons) located near the stacks contributing to the dispersion of unburned coal and, on the other hand, the height of the stacks (225 m) which may influence ash’s dispersion up to a distance of 20 km. In situ gamma radiation measurements with energy discrimination identified natural emitting nuclides as well as their decay products (212Pb, 214Pb, 226Ra 232Th, 228Ac, 234Th 234Pa, 235U, etc.). This work has been primarily done to in order to assess the impact of a coal-fired power plant operation on the background radiation level in the surrounding area. According to the results, an increase or at least an influence has been identified both qualitatively and quantitatively.
Resumo:
This paper addresses a gap in the literature concerning the management of Intellectual Capital (IC) in a port, which is a network of independent organizations that act together in the provision of a set of services. As far as the authors are aware, this type of empirical context has been unexplored when regarding knowledge management or IC creation/destruction. Indeed, most research in IC still focus on individual firms, despite the more recent interest placed on the analysis of macro-level units such as regions or nations. In this study, we conceptualise the port as meta-organisation, which has the generic goal of economic development, both for itself and for the region where it is located. It provides us with a unique environment due to its complexity as an “organisation” composed by several organisations, connected by interdependency relationships and, typically, with no formal hierarchy. Accordingly, actors’ interests are not always aligned and in some situations their individual interests can be misaligned with the collective goals of the port. Moreover, besides having their own interests, port actors also have different sources of influence and different levels of power, which can impact on the port’s Collective Intellectual Capital (CIC). Consequently, the management of the port’s CIC can be crucial in order for its goals to be met. With this paper we intend to discuss how the network coordinator (the port authority) manages those complex relations of interest and power in order to develop collaboration and mitigate conflict, thus creating collective intellectual assets or avoiding intellectual liabilities that may emerge for the whole port. The fact that we are studying complex and dynamic processes, about which there is a lack of understanding, in a complex and atypical organisation, leads us to consider the case study as an appropriate method of research. Evidence presented in this study results from preliminary interviews and also from document analysis. Findings suggest that alignment of interests and actions, at both dyadic and networking levels, is critical to develop a context of collaboration/cooperation within the port community and, accordingly, the port coordinator should make use of different types of power in order to ensure that port’s goals are achieved.
Resumo:
The integration of growing amounts of distributed generation in power systems, namely at distribution networks level, has been fostered by energy policies in several countries around the world, including in Europe. This intensive integration of distributed, non-dispatchable, and natural sources based generation (including wind power) has caused several changes in the operation and planning of power systems and of electricity markets. Sometimes the available non-dispatchable generation is higher than the demand. This generation must be used; otherwise it is wasted if not stored or used to supply additional demand. New policies and market rules, as well as new players, are needed in order to competitively integrate all the resources. The methodology proposed in this paper aims at the maximization of the social welfare in a distribution network operated by a virtual power player that aggregates and manages the available energy resources. When facing a situation of excessive non-dispatchable generation, including wind power, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. This method is especially useful when actual and day-ahead resources forecast differ significantly. The distribution network characteristics and concerns are addressed by including the network constraints in the optimization model. The proposed methodology has been implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20.310 consumers and 548 distributed generators, some of them non-dispatchable and with must take contracts. The implemented scenario corresponds to a real day in Portuguese power system.