149 resultados para Management contracts

em Instituto Politécnico do Porto, Portugal


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The spread and globalization of distributed generation (DG) in recent years has should highly influence the changes that occur in Electricity Markets (EMs). DG has brought a large number of new players to take action in the EMs, therefore increasing the complexity of these markets. Simulation based on multi-agent systems appears as a good way of analyzing players’ behavior and interactions, especially in a coalition perspective, and the effects these players have on the markets. MASCEM – Multi-Agent System for Competitive Electricity Markets was created to permit the study of the market operation with several different players and market mechanisms. MASGriP – Multi-Agent Smart Grid Platform is being developed to facilitate the simulation of micro grid (MG) and smart grid (SG) concepts with multiple different scenarios. This paper presents an intelligent management method for MG and SG. The simulation of different methods of control provides an advantage in comparing different possible approaches to respond to market events. Players utilize electric vehicles’ batteries and participate in Demand Response (DR) contracts, taking advantage on the best opportunities brought by the use of all resources, to improve their actions in response to MG and/or SG requests.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy resources management can play a very relevant role in future power systems in a SmartGrid context, with intensive penetration of distributed generation and storage systems. This paper deals with the importance of resource management in incident situations. The paper presents DemSi, an energy resources management simulator that has been developed by the authors to simulate electrical distribution networks with high distributed generation penetration, storage in network points and customers with demand response contracts. DemSi is used to undertake simulations for an incident scenario, evidencing the advantages of adequately using flexible contracts, storage, and reserve in order to limit incident consequences.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper addresses the optimal involvement in derivatives electricity markets of a power producer to hedge against the pool price volatility. To achieve this aim, a swarm intelligence meta-heuristic optimization technique for long-term risk management tool is proposed. This tool investigates the long-term opportunities for risk hedging available for electric power producers through the use of contracts with physical (spot and forward contracts) and financial (options contracts) settlement. The producer risk preference is formulated as a utility function (U) expressing the trade-off between the expectation and the variance of the return. Variance of return and the expectation are based on a forecasted scenario interval determined by a long-term price range forecasting model. This model also makes use of particle swarm optimization (PSO) to find the best parameters allow to achieve better forecasting results. On the other hand, the price estimation depends on load forecasting. This work also presents a regressive long-term load forecast model that make use of PSO to find the best parameters as well as in price estimation. The PSO technique performance has been evaluated by comparison with a Genetic Algorithm (GA) based approach. A case study is presented and the results are discussed taking into account the real price and load historical data from mainland Spanish electricity market demonstrating the effectiveness of the methodology handling this type of problems. Finally, conclusions are dully drawn.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The intensive use of distributed generation based on renewable resources increases the complexity of power systems management, particularly the short-term scheduling. Demand response, storage units and electric and plug-in hybrid vehicles also pose new challenges to the short-term scheduling. However, these distributed energy resources can contribute significantly to turn the shortterm scheduling more efficient and effective improving the power system reliability. This paper proposes a short-term scheduling methodology based on two distinct time horizons: hour-ahead scheduling, and real-time scheduling considering the point of view of one aggregator agent. In each scheduling process, it is necessary to update the generation and consumption operation, and the storage and electric vehicles status. Besides the new operation condition, more accurate forecast values of wind generation and consumption are available, for the resulting of short-term and very short-term methods. In this paper, the aggregator has the main goal of maximizing his profits while, fulfilling the established contracts with the aggregated and external players.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy resource scheduling is becoming increasingly important, as the use of distributed resources is intensified and of massive electric vehicle is envisaged. The present paper proposes a methodology for day-ahead energy resource scheduling for smart grids considering the intensive use of distributed generation and Vehicle-to-Grid (V2G). This method considers that the energy resources are managed by a Virtual Power Player (VPP) which established contracts with their owners. It takes into account these contracts, the users' requirements subjected to the VPP, and several discharge price steps. The full AC power flow calculation included in the model takes into account network constraints. The influence of the successive day requirements on the day-ahead optimal solution is discussed and considered in the proposed model. A case study with a 33-bus distribution network and V2G is used to illustrate the good performance of the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

All over the world, the liberalization of electricity markets, which follows different paradigms, has created new challenges for those involved in this sector. In order to respond to these challenges, electric power systems suffered a significant restructuring in its mode of operation and planning. This restructuring resulted in a considerable increase of the electric sector competitiveness. Particularly, the Ancillary Services (AS) market has been target of constant renovations in its operation mode as it is a targeted market for the trading of services, which have as main objective to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. In this way, with the increasing penetration of distributed energy resources including distributed generation, demand response, storage units and electric vehicles, it is essential to develop new smarter and hierarchical methods of operation of electric power systems. As these resources are mostly connected to the distribution network, it is important to consider the introduction of this kind of resources in AS delivery in order to achieve greater reliability and cost efficiency of electrical power systems operation. The main contribution of this work is the design and development of mechanisms and methodologies of AS market and for energy and AS joint market, considering different management entities of transmission and distribution networks. Several models developed in this work consider the most common AS in the liberalized market environment: Regulation Down; Regulation Up; Spinning Reserve and Non-Spinning Reserve. The presented models consider different rules and ways of operation, such as the division of market by network areas, which allows the congestion management of interconnections between areas; or the ancillary service cascading process, which allows the replacement of AS of superior quality by lower quality of AS, ensuring a better economic performance of the market. A major contribution of this work is the development an innovative methodology of market clearing process to be used in the energy and AS joint market, able to ensure viable and feasible solutions in markets, where there are technical constraints in the transmission network involving its division into areas or regions. The proposed method is based on the determination of Bialek topological factors and considers the contribution of the dispatch for all services of increase of generation (energy, Regulation Up, Spinning and Non-Spinning reserves) in network congestion. The use of Bialek factors in each iteration of the proposed methodology allows limiting the bids in the market while ensuring that the solution is feasible in any context of system operation. Another important contribution of this work is the model of the contribution of distributed energy resources in the ancillary services. In this way, a Virtual Power Player (VPP) is considered in order to aggregate, manage and interact with distributed energy resources. The VPP manages all the agents aggregated, being able to supply AS to the system operator, with the main purpose of participation in electricity market. In order to ensure their participation in the AS, the VPP should have a set of contracts with the agents that include a set of diversified and adapted rules to each kind of distributed resource. All methodologies developed and implemented in this work have been integrated into the MASCEM simulator, which is a simulator based on a multi-agent system that allows to study complex operation of electricity markets. In this way, the developed methodologies allow the simulator to cover more operation contexts of the present and future of the electricity market. In this way, this dissertation offers a huge contribution to the AS market simulation, based on models and mechanisms currently used in several real markets, as well as the introduction of innovative methodologies of market clearing process on the energy and AS joint market. This dissertation presents five case studies; each one consists of multiple scenarios. The first case study illustrates the application of AS market simulation considering several bids of market players. The energy and ancillary services joint market simulation is exposed in the second case study. In the third case study it is developed a comparison between the simulation of the joint market methodology, in which the player bids to the ancillary services is considered by network areas and a reference methodology. The fourth case study presents the simulation of joint market methodology based on Bialek topological distribution factors applied to transmission network with 7 buses managed by a TSO. The last case study presents a joint market model simulation which considers the aggregation of small players to a VPP, as well as complex contracts related to these entities. The case study comprises a distribution network with 33 buses managed by VPP, which comprises several kinds of distributed resources, such as photovoltaic, CHP, fuel cells, wind turbines, biomass, small hydro, municipal solid waste, demand response, and storage units.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Poster presented in The 28th GI/ITG International Conference on Architecture of Computing Systems (ARCS 2015). 24 to 26, Mar, 2015. Porto, Portugal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Learning Management Systems (LMS) are used all over Higher Education Institutions (HEI) and the need to know and understand its adoption and usage arises. However, there is a lack of information about how LMSs are being used, which are the most adopted, whether there is a country adoption standard and which countries use more LMSs. A research team is developing a project that tries to fill this lack of information and provide the needed answers. With this purpose, on a first phase, it a survey was taken place. The results of this survey are presented in this paper. Another purpose of this paper is to disseminate the ongoing project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been a growing interest in research on performance measurement and management practices, which seems to reflect researchers’ response to calls for the need to increase the relevance of management accounting research. However, despite the development of the new public management literature, studies involving public sector organizations are relatively small compared to those involving business organizations and extremely limited when it comes to public primary health care organizations. Yet, the economic significance of public health care organizations in the economy of developed countries and the criticisms these organizations regularly face from the public suggests there is a need for research. This is particularly true in the case of research that may lead to improvement in performance measurement and management practices and ultimately to improvements in the way health care organizations use their limited resources in the provision of services to the communities. This study reports on a field study involving three public primary health care organisations. The evidence obtained from interviews and archival data suggests a performance management practices in these institutions lacked consistency and coherence, potentially leading to decreased performance. Hierarchical controls seemed to be very weak and accountability limited, leading to a lack of direction, low motivation and, in some circumstances to insufficient managerial abilities and skills. Also, the performance management systems revealed a number of weaknesses, which suggests that there are various opportunities for improvement in performance in the studied organisations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introdução: Programas de self-management têm como objectivo habilitar os pacientes com estratégias necessárias para levar a cabo procedimentos específicos para a patologia. A última revisão sistemática sobre selfmanagament em DPOC foi realizada em 2007, concluindo-se que ainda não era possível fornecer dados claros e suficientes acerca de recomendações sobre a estrutura e conteúdo de programas de self-managament na DPOC. A presente revisão tem o intuito de complementar a análise da revisão anterior, numa tentativa de inferir a influência do ensino do self-management na DPOC. Objectivos: verificar a influência dos programas de self-management na DPOC, em diversos indicadores relacionados com o estado de saúde do paciente e na sua utilização dos serviços de saúde. Estratégia de busca: pesquisa efectuada nas bases de dados PubMed e Cochrane Collaboration (01/01/2007 – 31/08/2010). Palavras-chave: selfmanagement education, self-management program, COPD e pulmonary rehabilitation. Critérios de Selecção: estudos randomizados sobre programas de selfmanagement na DPOC. Extracção e Análise dos Dados: 2 investigadores realizaram, independentemente, a avaliação e extracção de dados de cada artigo. Resultados: foram considerados 4 estudos randomizados em selfmanagement na DPOC nos quais se verificaram benefícios destes programas em diversas variáveis: qualidade de vida a curto e médio prazo, utilização dos diferentes recursos de saúde, adesões a medicação de rotina, controle das exacerbações e diminuição da sintomatologia. Parece não ocorrer alteração na função pulmonar e no uso de medicação de emergência, sendo inconclusivo o seu efeito na capacidade de realização de exercício. Conclusões: programas de self-management aparentam ter impacto positivo na qualidade de vida, recurso a serviços de saúde, adesão à medicação, planos de acção e níveis de conhecimento da DPOC. Discrepâncias nos critérios de selecção das amostras utilizadas, períodos de seguimento desiguais, consistência das variáveis mensuradas, condicionam a informação disponibilizada sobre este assunto.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We are working on the confluence of knowledge management, organizational memory and emergent knowledge with the lens of complex adaptive systems. In order to be fundamentally sustainable organizations search for an adaptive need for managing ambidexterity of day-to-day work and innovation. An organization is an entity of a systemic nature, composed of groups of people who interact to achieve common objectives, making it necessary to capture, store and share interactions knowledge with the organization, this knowledge can be generated in intra-organizational or inter-organizational level. The organizations have organizational memory of knowledge of supported on the Information technology and systems. Each organization, especially in times of uncertainty and radical changes, to meet the demands of the environment, needs timely and sized knowledge on the basis of tacit and explicit. This sizing is a learning process resulting from the interaction that emerges from the relationship between the tacit and explicit knowledge and which we are framing within an approach of Complex Adaptive Systems. The use of complex adaptive systems for building the emerging interdependent relationship, will produce emergent knowledge that will improve the organization unique developing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nos últimos anos verificou-se uma alteração das condições e modo de funcionamento de empresas e instituições, privadas e públicas, muitas delas através da introdução de novas ferramentas de gestão. De entre elas, podemos destacar o outsourcing, que apesar de não ser um fenómeno actual, é ainda em Portugal uma ferramenta recente e pouco explorada, que pode contribuir de forma decisiva para a modernização, flexibilidade e competitividade das empresas. O presente estudo pretende abordar a contratação de serviços externos nos serviços de saúde públicos, também conhecido como outsourcing, mediante uma análise prática da realidade de uma instituição hospitalar com sete serviços em regime de outsourcing, com recolha dos dados durante o triénio 2008-2010. No Serviço de Urgência durante 2010 o principal prestador recebeu mais 104,28% acima do valor referência/hora, no Serviço de Oftalmologia no ano de 2010 o prestador recebeu um valor superior em 24,91%, no Serviço de Limpeza, Higiene e Conforto é pago ao prestador durante o ano de 2010 um valor superior em 13,85%, no Serviço de Vigilância e Segurança o prestador recebeu durante o ano de 2010 um valor superior em 27,5%, caso a instituição hospitalar optasse por contratar, para os serviços atrás referidos, profissionais para o quadro de pessoal. Ainda em relação ao Serviço de Urgência foi pago mais 21,38% acima do valor de referência publicado por Despacho governamental. Em relação aos Serviços de Lavandaria e de Tratamento de Resíduos Sólidos, não foi possível recolher os dados necessários que pudessem levar a uma conclusão válida sobre os custos pagos pela instituição hospitalar. Pode-se concluir que a contratação de prestadores externos, para os serviços de saúde, essenciais e não essenciais, em regime de outsourcing, revela-se na maioria dos casos analisados a opção menos económica, com custos bastantes elevados.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A survey was conducted among students of the Accounting and Administration undergraduate degree at ISCAP – IPP (School of Accounting and Administration of Polytechnic Institute of Porto) in order to understand their perception value of their course Business Simulation (BS). This course is provided in a business environment where students can learn by doing through the management of a company as they were in the real life, but risk-free. The learning tasks are provided in an action-oriented format to maximize the learning process. Students learn by doing a set of tasks every session and have also to produce reports and presentations during the course. BS is part of the undergraduate degree of Accounting and Administration at ISCAP – IPP since the beginning of 2003. The questionnaire we used captured the students’ perception about general and specific skills and competencies considered important for managers and accountants in the real life, about the methodology used in the course, which is totally different from the traditional form, and also about the adequacy of the course included as part of the undergraduate degree. The results showed that students’ perception is highly positive and almost all of them think they improve the skills needed for a job during the course. These results are consistent with [1] Adler and Milne’s research in which the authors found that students agree with the use of action-oriented learning tasks in order to provide them the needed attitudes, skills, and knowledge. The improvement of group skills is the most important issue for students, which can be understandable as BS is the only course from the degree in Accounting and Administration they really have to work in groups.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada ao Instituto Superior de Contabilidade para a obtenção do Grau de Mestre em Empreendedorismo e Internacionalização Orientada por Professor Doutor José Freitas Santos