20 resultados para Lysine availability
em Instituto Politécnico do Porto, Portugal
Resumo:
Mestrado em Engenharia Informática
Resumo:
Dynamically reconfigurable SRAM-based field-programmable gate arrays (FPGAs) enable the implementation of reconfigurable computing systems where several applications may be run simultaneously, sharing the available resources according to their own immediate functional requirements. To exclude malfunctioning due to faulty elements, the reliability of all FPGA resources must be guaranteed. Since resource allocation takes place asynchronously, an online structural test scheme is the only way of ensuring reliable system operation. On the other hand, this test scheme should not disturb the operation of the circuit, otherwise availability would be compromised. System performance is also influenced by the efficiency of the management strategies that must be able to dynamically allocate enough resources when requested by each application. As those resources are allocated and later released, many small free resource blocks are created, which are left unused due to performance and routing restrictions. To avoid wasting logic resources, the FPGA logic space must be defragmented regularly. This paper presents a non-intrusive active replication procedure that supports the proposed test methodology and the implementation of defragmentation strategies, assuring both the availability of resources and their perfect working condition, without disturbing system operation.
Resumo:
O diagnóstico de doença hepática autoimune em doentes com patologia hepática implica a exclusão de outras causas de lesão hepática como vírica, alcoólica, tóxica, devido a alterações genéticas ou metabólicas, esteatose hepática não alcoólica e uma criteriosa avaliação de dados clínicos, bioquímicos, histológicos e colangiográficos especificas destas patologias (Invernizzi et al 2007) O diagnóstico e tratamento precoces destas patologias são fundamentais para a prevenção da alta morbilidade e mortalidade associada a estes doentes. O despiste de patologia hepática autoimune assenta na utilização de testes serológicos para a deteção de autoanticorpos associados a estas patologias. O conhecimento destes testes e a interpretação dos resultados obtidos revelam-se fundamentais para o diagnóstico ou exclusão destas doenças (Beuers 2005). Deste modo, foi objetivo deste trabalho a pesquisa e identificação de autoanticorpos em uso clínico: ANA, AMA, AML, ANCA, Anti-SLA/LP, anti-LKM, anti-LC1 e anti-actina F, em doentes com suspeita de HAI e CBP em que foi excluída causa vírica, alcoólica e tóxica. O trabalho incidiu particularmente na comparação dos resultados do perfil de autoanticorpos de pedidos feitos ao exterior com os resultados obtidos recorrendo à utilização de um novo kit de imunoblot, e assim determinar a relevância da introdução da pesquisa dos novos autoanticorpos e avaliar a relação custo/benefício da implementação do kit BlueDot liver da D-tek® na rotina laboratorial do serviço de Patologia Clínica do Hospital Pedro Hispano. Os resultados encontrados foram de 100% de concordância entre os métodos de imunofluorescência indireta e imunoblot, e Elisa e Imunoblot. Deste modo seria uma boa estratégia a implementação desta última técnica na rotina laboratorial uma vez que proporciona uma rápida disponibilização dos resultados para o clínico, antecipando desta forma o diagnóstico e o início rápido do tratamento em benefício do doente. Por outro lado, quando analisámos a relação custo/beneficio, seria vantajosa a implementação desta técnica uma vez que o laboratório dispõe de capacidade técnica, e o custo de aquisição do kit não excede o valor praticado atualmente correspondendo a uma poupança de 51%.
Resumo:
The large increase of renewable energy sources and Distributed Generation (DG) of electricity gives place to the Virtual Power Producer (VPP) concept. VPPs may turn electricity generation by renewable sources valuable in electricity markets. Information availability and adequate decision-support tools are crucial for achieving VPPs’ goals. This involves information concerning associated producers and market operation. This paper presents ViProd, a simulation tool that allows simulating VPPs operation, focusing mainly in the information requirements for adequate decision making.
Resumo:
This paper presents a methodology that aims to increase the probability of delivering power to any load point of the electrical distribution system by identifying new investments in distribution components. The methodology is based on statistical failure and repair data of the distribution power system components and it uses fuzzy-probabilistic modelling for system component outage parameters. Fuzzy membership functions of system component outage parameters are obtained by statistical records. A mixed integer non-linear optimization technique is developed to identify adequate investments in distribution networks components that allow increasing the availability level for any customer in the distribution system at minimum cost for the system operator. To illustrate the application of the proposed methodology, the paper includes a case study that considers a real distribution network.
Using demand response to deal with unexpected low wind power generation in the context of smart grid
Resumo:
Demand response is assumed an essential resource to fully achieve the smart grids operating benefits, namely in the context of competitive markets. Some advantages of Demand Response (DR) programs and of smart grids can only be achieved through the implementation of Real Time Pricing (RTP). The integration of the expected increasing amounts of distributed energy resources, as well as new players, requires new approaches for the changing operation of power systems. The methodology proposed aims the minimization of the operation costs in a smart grid operated by a virtual power player. It is especially useful when actual and day ahead wind forecast differ significantly. When facing lower wind power generation than expected, RTP is used in order to minimize the impacts of such wind availability change. The proposed model application is here illustrated using the scenario of a special wind availability reduction day in the Portuguese power system (8th February 2012).
Resumo:
The increasing importance given by environmental policies to the dissemination and use of wind power has led to its fast and large integration in power systems. In most cases, this integration has been done in an intensive way, causing several impacts and challenges in current and future power systems operation and planning. One of these challenges is dealing with the system conditions in which the available wind power is higher than the system demand. This is one of the possible applications of demand response, which is a very promising resource in the context of competitive environments that integrates even more amounts of distributed energy resources, as well as new players. The methodology proposed aims the maximization of the social welfare in a smart grid operated by a virtual power player that manages the available energy resources. When facing excessive wind power generation availability, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. The proposed method is especially useful when actual and day-ahead wind forecast differ significantly. The proposed method has been computationally implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20310 consumers and 548 distributed generators, some of them with must take contracts.
Resumo:
Introduction: The present paper deals with the issue of the increasing usage of corporation mergers and acquisitions strategies within pharmaceutical industry environment. The aim is to identify the triggers of such business phenomenon and the immediate impact on the financial outcome of two powerful biopharmaceutical corporations: Pfizer and GlaxoSmithKline, which have been sampled due to their successful approach of the tactics in question. Materials and Methods: In order to create an overview of the development steps through mergers and acquisitions, the historical data of the two corporations has been consulted, from their official websites. The most relevant events were then associated with adequate information from the financial reports and statements of the two corporations indulged by web-based financial data providers. Results and Discussions: In the past few decades Pfizer and GlaxoSmithKline have purchased or merged with various companies in order to monopolize new markets, diversify products and services portfolios, survive and surpass competitors. The consequences proved to be positive although this approach implies certain capital availability. Conclusions: Results reveal the fact that, as far as the two sampled companies are concerned, acquisitions and mergers are reactions at the pressure of the highly competitive environment. Moreover, the continuous diversification of the market’s needs is also a consistent motive. However, the prevalence and the eminence of mergers and acquisition strategies are conditioned by the tender offer, the announcer’s caliber, research and development status and further other factors determined by the internal and external actors of the market.
Resumo:
A proporção de colheitas de dadores voluntários pode ser usada como indicador não só do potencial de disponibilidade de sangue mas também da sua segurança. Em Luanda, Angola, a dádiva voluntária correspondeu a cerca de 23% das dádivas em 2004. Foi realizado um estudo observacional descritivo transversal pela aplicação de um questionário constituído por itens que captam factores que motivam ou inibem a dádiva benévola de sangue, numa amostra de estudantes universitários em Luanda. Apesar da baixa dádiva voluntária indicada pelos respondentes, verificou-se uma elevada disponibilidade para a dádiva benévola, essencial no combate ao HIV.
Resumo:
Ensuring sustainable development conditions is presently world widely recognized as a critically important goal. This makes the use of electricity generation technologies based on renewable energy sources very relevant. Developing countries depend on an adequate availability of electrical energy to assure economic progress and are usually characterized by a high increase in electricity consumption. This makes sustainable development a huge challenge but it can also be taken as an opportunity, especially for countries which do not have fossil resources. This paper presents a study concerning the expansion of an already existent wind farm, located in Praia, the capital of Cape Verde Republic. The paper includes results from simulation studies that have been undertaken using PSCAD software and some economic considerations.
Resumo:
A supervisory control and data acquisition (SCADA) system is an integrated platform that incorporates several components and it has been applied in the field of power systems and several engineering applications to monitor, operate and control a lot of processes. In the future electrical networks, SCADA systems are essential for an intelligent management of resources like distributed generation and demand response, implemented in the smart grid context. This paper presents a SCADA system for a typical residential house. The application is implemented on MOVICON™11 software. The main objective is to manage the residential consumption, reducing or curtailing loads to keep the power consumption in or below a specified setpoint, imposed by the costumer and the generation availability.
Resumo:
Distributed generation unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to load centers, interchanging electric power with the network. This work presents a probabilistic methodology conceived to assist the electric system planning engineers in the selection of the distributed generation location, taking into account the hourly load changes or the daily load cycle. The hourly load centers, for each of the different hourly load scenarios, are calculated deterministically. These location points, properly weighted according to their load magnitude, are used to calculate the best fit probability distribution. This distribution is used to determine the maximum likelihood perimeter of the area where each source distributed generation point should preferably be located by the planning engineers. This takes into account, for example, the availability and the cost of the land lots, which are factors of special relevance in urban areas, as well as several obstacles important for the final selection of the candidates of the distributed generation points. The proposed methodology has been applied to a real case, assuming three different bivariate probability distributions: the Gaussian distribution, a bivariate version of Freund’s exponential distribution and the Weibull probability distribution. The methodology algorithm has been programmed in MATLAB. Results are presented and discussed for the application of the methodology to a realistic case and demonstrate the ability of the proposed methodology for efficiently handling the determination of the best location of the distributed generation and their corresponding distribution networks.
Resumo:
Mestrado em Engenharia Electrotécnica e de Computadores
Resumo:
Mestrado em Engenharia Geotécnica e Geoambiente
Resumo:
Introdução: A elevada prevalência de problemas musculosqueléticos relacionados com a performance musical (PMRPM) em estudantes universitários de música, sobretudo violinistas, justifica uma abordagem preventiva junto destes, nomeadamente, através do exercício. Este deve ser específico e baseado nos padrões de movimento durante a performance musical do violinista. Objetivos: verificar a influência de um programa de exercícios específicos (PEE) nos sintomas relacionados com a prática musical, na incapacidade funcional e na autoperceção da performance física e musical, em estudantes universitários de violino. Métodos: estudo quase-experimental baseado num estudo piloto com 24 estudantes para pesquisa da sintomatologia, e 4 para análise cinemática e cinética do gesto técnico. No estudo principal participaram 22 violinistas divididos equitativamente, e por disponibilidade, entre grupo experimental (GE) e grupo de controlo (GC). O GE realizou o PEE bissemanalmente, durante 8 semanas. No momento inicial e após 8 semanas, os participantes preencheram: Questionário de Performance (incluiu Escala Visual Analógica), Disabilities of the Arm, Shoulder and Hand, Oswestry Disability Index versão 2.0, Pain Catastrophizing Scale e Escala de Borg Modificada. Resultados: do estudo piloto constatou-se que os sintomas mais frequentes, dor e fadiga, localizavam-se na cintura escapular, ombros e coluna lombar; os ombros aparentavam maior risco de PMRPM; era necessário aumentar a endurance dos mobilizadores dos membros superiores (principalmente deltóide) e relaxar os estabilizadores da coluna cervical (sobretudo trapézio superior). No final do PEE, o GE apresentou significativamente melhores pontuações do que o GC na percentagem de violinistas com “dor na coluna lombar esquerda” (p=0,007), frequência da dor (U=8,5; W=29,5; p=0,016), número de locais com sintomas (U=18; W=84; p=0,003) e amplificação (U=26; W=92; p=0,021). Conclusão: Um PEE pode produzir efeitos positivos na diminuição dos sintomas relacionados com a prática musical e incapacidade funcional, e na melhoria de alguns parâmetros da performance física autoreportada, em estudantes universitários de violino.