17 resultados para Dust charging
em Instituto Politécnico do Porto, Portugal
Resumo:
Dissertação apresentada ao Instituto Superior de Contabilidade e Administração do Porto (ISCAP) para a obtenção do Grau de Mestre em Auditoria Docente orientador: Mestre Domingos da Silva Duarte
Resumo:
The introduction of Electric Vehicles (EVs) together with the implementation of smart grids will raise new challenges to power system operators. This paper proposes a demand response program for electric vehicle users which provides the network operator with another useful resource that consists in reducing vehicles charging necessities. This demand response program enables vehicle users to get some profit by agreeing to reduce their travel necessities and minimum battery level requirements on a given period. To support network operator actions, the amount of demand response usage can be estimated using data mining techniques applied to a database containing a large set of operation scenarios. The paper includes a case study based on simulated operation scenarios that consider different operation conditions, e.g. available renewable generation, and considering a diversity of distributed resources and electric vehicles with vehicle-to-grid capacity and demand response capacity in a 33 bus distribution network.
Resumo:
Power systems have been through deep changes in recent years, namely with the operation of competitive electricity markets in the scope and the increasingly intensive use of renewable energy sources and distributed generation. This requires new business models able to cope with the new opportunities that have emerged. Virtual Power Players (VPPs) are a new player type which allows aggregating a diversity of players (Distributed Generation (DG), Storage Agents (SA), Electrical Vehicles, (V2G) and consumers), to facilitate their participation in the electricity markets and to provide a set of new services promoting generation and consumption efficiency, while improving players` benefits. A major task of VPPs is the remuneration of generation and services (maintenance, market operation costs and energy reserves), as well as charging energy consumption. This paper proposes a model to implement fair and strategic remuneration and tariff methodologies, able to allow efficient VPP operation and VPP goals accomplishment in the scope of electricity markets.
Resumo:
Olhando para a necessidade de auxiliar o movimento dos carrinhos de compras nas grandes superfícies, surgiu a ideia de desenvolver um sistema de accionamento flexível, que pudesse ser adaptado a diferentes tipos de carrinhos. O sistema deveria ser também de baixo custo e ter potencial de industrialização. Como em qualquer sistema de accionamento eléctrico foi necessário dimensionar e seleccionar um controlador e um motor, no entanto, dados os requisitos relativos à adaptabilidade do sistema foi necessário um esforço significativo para o desenvolvimento dos componentes mecânicos de tracção e transmissão. Considerando os requisitos de portabilidade foi também desenvolvido um sistema de alimentação a partir de baterias e feito um estudo preliminar relativo ao sistema de carregamento de baterias a ser instalado nos locais de utilização. Após a concepção, foi construído um protótipo que depois foi instalado num carrinho de compras. Os testes realizados demonstraram a viabilidade do sistema, quer pelo auxílio que podem dar aos utilizadores, quer pela flexibilidade e potencial de comercialização.
Resumo:
The introduction of electricity markets and integration of Distributed Generation (DG) have been influencing the power system’s structure change. Recently, the smart grid concept has been introduced, to guarantee a more efficient operation of the power system using the advantages of this new paradigm. Basically, a smart grid is a structure that integrates different players, considering constant communication between them to improve power system operation and management. One of the players revealing a big importance in this context is the Virtual Power Player (VPP). In the transportation sector the Electric Vehicle (EV) is arising as an alternative to conventional vehicles propel by fossil fuels. The power system can benefit from this massive introduction of EVs, taking advantage on EVs’ ability to connect to the electric network to charge, and on the future expectation of EVs ability to discharge to the network using the Vehicle-to-Grid (V2G) capacity. This thesis proposes alternative strategies to control these two EV modes with the objective of enhancing the management of the power system. Moreover, power system must ensure the trips of EVs that will be connected to the electric network. The EV user specifies a certain amount of energy that will be necessary to charge, in order to ensure the distance to travel. The introduction of EVs in the power system turns the Energy Resource Management (ERM) under a smart grid environment, into a complex problem that can take several minutes or hours to reach the optimal solution. Adequate optimization techniques are required to accommodate this kind of complexity while solving the ERM problem in a reasonable execution time. This thesis presents a tool that solves the ERM considering the intensive use of EVs in the smart grid context. The objective is to obtain the minimum cost of ERM considering: the operation cost of DG, the cost of the energy acquired to external suppliers, the EV users payments and remuneration and penalty costs. This tool is directed to VPPs that manage specific network areas, where a high penetration level of EVs is expected to be connected in these areas. The ERM is solved using two methodologies: the adaptation of a deterministic technique proposed in a previous work, and the adaptation of the Simulated Annealing (SA) technique. With the purpose of improving the SA performance for this case, three heuristics are additionally proposed, taking advantage on the particularities and specificities of an ERM with these characteristics. A set of case studies are presented in this thesis, considering a 32 bus distribution network and up to 3000 EVs. The first case study solves the scheduling without considering EVs, to be used as a reference case for comparisons with the proposed approaches. The second case study evaluates the complexity of the ERM with the integration of EVs. The third case study evaluates the performance of scheduling with different control modes for EVs. These control modes, combined with the proposed SA approach and with the developed heuristics, aim at improving the quality of the ERM, while reducing drastically its execution time. The proposed control modes are: uncoordinated charging, smart charging and V2G capability. The fourth and final case study presents the ERM approach applied to consecutive days.
Resumo:
Com o aumento da população mundial registado nos últimos anos surgiu também uma maior procura energética. Esse aumento foi inicialmente colmatado recorrendo essencialmente a fontes de origem fóssil, pelo facto destas serem mais baratas. No entanto, essa tendência de preços baixos sofreu o primeiro abalo nos anos 70 do século passado, altura em que o preço do petróleo disparou, devido a questões políticas. Nessa altura ficou visível para os países ocidentais o quanto estes eram dependentes dos países produtores de petróleo que, em geral, são instáveis politicamente. Começou então a procura de fontes energéticas alternativas. Além da questão económica do aumento do preço dos combustíveis, existe também o problema ambiental. Os maiores responsáveis pela emissão de gases efeito estufa (GEE) são os combustíveis fósseis. Os GEE contribuem para o aquecimento global, o que origina fenómenos ambientais severos que poderão levar a mudanças climáticas significativas. As energias renováveis apresentam-se como a solução mais viável ao problema energético e ambiental que se verifica actualmente, porque permitem colmatar o aumento da procura energética de uma forma limpa e sustentável. Na sequência destes problemas surgiram nos últimos anos veículos que permitem reduzir ou mesmo eliminar o consumo de combustíveis fósseis, como os veículos híbridos eléctricos, eléctricos e a hidrogénio. Nesta dissertação analisa-se um sistema que foi pensado para ser implementado em áreas de serviço, que permite efectuar o carregamento de electric vehicles (EV) utilizando energia eléctrica de origem fotovoltaica e a produção de hidrogénio para os fuels cell electric vehicles (FCEV). É efectuada uma análise económica do sistema, uma análise ambiental e analisou-se também o impacto na redução da dependência do país em relação ao exterior, sendo ainda efectuada uma pequena análise ao sistema MOBIE. No caso dos veículos a hidrogénio, foi determinada qual seria a melhor opção em termos económicos, para a produção de hidrogénio considerando três regimes de produção: recorrendo apenas à energia eléctrica proveniente do sistema fotovoltaico, apenas à energia eléctrica da rede, ou uma combinação dos dois regimes. O sistema estudado nesta dissertação apresenta um enorme potencial a nível energético e ambiental, surgindo como alternativa para abastecer os veículos que irão permitir, no futuro, eliminar a dependência energética em relação às fontes fósseis e ao mesmo tempo diminuir a quantidade de gases efeito estufa emitidos para a atmosfera.
Resumo:
Mestrado em Engenharia Electrotécnica – Sistemas Eléctricos de Energia
Resumo:
This paper describes the methodology adopted to assess local air quality impact in the vicinity of a coal power plant located in the south of Portugal. Two sampling areas were selected to assess the deposition flux of dust fallout and its potential spatial heterogeneity. The sampling area was divided into two subareas: the inner, with higher sampling density and urban and suburban characteristics, inside a 6-km circle centered on the stacks, and an outer subarea, mainly rural, with lower sampling density within a radius of 20 km. Particulate matter deposition was studied in the vicinity of the coal fired power plant during three seasonal sampling campaigns. For the first one, the average annual flux of dust fallout was 22.51 g/(m2 yr), ranging from 4.20 to 65.94 g/(m2 yr); for the second one was 9.47 g/(m2 yr), ranging from 0.78 to 32.72 g/(m2 yr) and for the last one was 38.42 g/(m2 yr), ranging from 1.41 to 117.48 g/(m2 yr). The fallout during the second campaign turned out to be much lower than for others. This was in part due to meteorological local patterns but mostly due to the fact that the power plant was not working at full power during the second sampling campaign.155
Resumo:
The energy resource scheduling is becoming increasingly important, as the use of distributed resources is intensified and massive gridable vehicle (V2G) use is envisaged. This paper presents a methodology for day-ahead energy resource scheduling for smart grids considering the intensive use of distributed generation and V2G. The main focus is the comparison of different EV management approaches in the day-ahead energy resources management, namely uncontrolled charging, smart charging, V2G and Demand Response (DR) programs i n the V2G approach. Three different DR programs are designed and tested (trip reduce, shifting reduce and reduce+shifting). Othe r important contribution of the paper is the comparison between deterministic and computational intelligence techniques to reduce the execution time. The proposed scheduling is solved with a modified particle swarm optimization. Mixed integer non-linear programming is also used for comparison purposes. Full ac power flow calculation is included to allow taking into account the network constraints. A case study with a 33-bus distribution network and 2000 V2G resources is used to illustrate the performance of the proposed method.
Resumo:
Smart grids with an intensive penetration of distributed energy resources will play an important role in future power system scenarios. The intermittent nature of renewable energy sources brings new challenges, requiring an efficient management of those sources. Additional storage resources can be beneficially used to address this problem; the massive use of electric vehicles, particularly of vehicle-to-grid (usually referred as gridable vehicles or V2G), becomes a very relevant issue. This paper addresses the impact of Electric Vehicles (EVs) in system operation costs and in power demand curve for a distribution network with large penetration of Distributed Generation (DG) units. An efficient management methodology for EVs charging and discharging is proposed, considering a multi-objective optimization problem. The main goals of the proposed methodology are: to minimize the system operation costs and to minimize the difference between the minimum and maximum system demand (leveling the power demand curve). The proposed methodology perform the day-ahead scheduling of distributed energy resources in a distribution network with high penetration of DG and a large number of electric vehicles. It is used a 32-bus distribution network in the case study section considering different scenarios of EVs penetration to analyze their impact in the network and in the other energy resources management.
Resumo:
This paper presents a methodology for multi-objective day-ahead energy resource scheduling for smart grids considering intensive use of distributed generation and Vehicle- To-Grid (V2G). The main focus is the application of weighted Pareto to a multi-objective parallel particle swarm approach aiming to solve the dual-objective V2G scheduling: minimizing total operation costs and maximizing V2G income. A realistic mathematical formulation, considering the network constraints and V2G charging and discharging efficiencies is presented and parallel computing is applied to the Pareto weights. AC power flow calculation is included in the metaheuristics approach to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.
Resumo:
Power systems have been through deep changes in recent years, namely due to the operation of competitive electricity markets in the scope the increasingly intensive use of renewable energy sources and distributed generation. This requires new business models able to cope with the new opportunities that have emerged. Virtual Power Players (VPPs) are a new type of player that allows aggregating a diversity of players (Distributed Generation (DG), Storage Agents (SA), Electrical Vehicles (V2G) and consumers) to facilitate their participation in the electricity markets and to provide a set of new services promoting generation and consumption efficiency, while improving players’ benefits. A major task of VPPs is the remuneration of generation and services (maintenance, market operation costs and energy reserves), as well as charging energy consumption. This paper proposes a model to implement fair and strategic remuneration and tariff methodologies, able to allow efficient VPP operation and VPP goals accomplishment in the scope of electricity markets.
Resumo:
This paper presents a decision support tool methodology to help virtual power players (VPPs) in the Smart Grid (SGs) context to solve the day-ahead energy resource scheduling considering the intensive use of Distributed Generation (DG) and Vehicle-To-Grid (V2G). The main focus is the application of a new hybrid method combing a particle swarm approach and a deterministic technique based on mixedinteger linear programming (MILP) to solve the day-ahead scheduling minimizing total operation costs from the aggregator point of view. A realistic mathematical formulation, considering the electric network constraints and V2G charging and discharging efficiencies is presented. Full AC power flow calculation is included in the hybrid method to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.
Resumo:
The use of Electric Vehicles (EVs) will change significantly the planning and management of power systems in a near future. This paper proposes a real-time tariff strategy for the charge process of the EVs. The main objective is to evaluate the influence of real-time tariffs in the EVs owners’ behaviour and also the impact in load diagram. The paper proposes the energy price variation according to the relation between wind generation and power consumption. The proposed strategy was tested in two different days in the Danish power system. January 31st and August 13th 2013 were selected because of the high quantities of wind generation. The main goal is to evaluate the changes in the EVs charging diagram with the energy price preventing wind curtailment.
Resumo:
A presente tese descreve diferentes soluções que permitem a reutilização da energia recuperada em ascensores eléctricos de roda de aderência dotados de conversores electrónicos de frequência e dessa forma contribuir para a melhoria da eficiência energética nos ascensores. Nos ascensores, a energia potencial é constantemente transferida enquanto a cabina está em movimento. Se a cabina se estiver a movimentar em sentido descendente com plena carga, ou em sentido ascendente, mas vazia, o motor estará em modo gerador. Quando a cabina se movimenta em sentido descendente, e o peso na cabina é superior ao peso do contrapeso, então o binário do motor encontra-se em sentido contrário à velocidade, isto é, o motor está a travar, havendo lugar à recuperação de energia. Igualmente, se a cabina subir vazia, também se poderá recuperar energia eléctrica. A energia acumulada em forma de energia potencial nas pessoas e no contrapeso pode ser recuperada, dado que o motor estará a funcionar como um gerador. De modo a estudar a viabilidade técnica e económica das diferentes soluções foram realizadas medições a uma amostra representativa de ascensores eléctricos de roda de aderência. Esta amostra é constituída por 39 ascensores que estão instalados em diferentes tipos de edifícios e que pertencem a diferentes categorias de utilização, de acordo com a norma VDI 4707:2009. Para cada ascensor foi medida a energia consumida e a energia gerada para uma manobra completa – a descida e a subida da cabina sem carga. A partir das medições, e com base na norma VDI 4707:2009 foram calculados os valores anualizados de energia eléctrica consumidos e produzidos por cada ascensor. A partir das 5 hipóteses identificadas para a utilização da energia recuperada (carregamento de bateria para alimentação dos circuitos em stand-by; carregamento de supercondensador para alimentação dos circuitos em stand-by; carregamento de supercondensador para alimentar o barramento DC; reinjecção da energia no barramento DC de um conjunto de ascensores em grupo; reinjecção da energia na rede eléctrica do edifício onde o ascensor está instalado) foi realizada a avaliação técnica e a avaliação económico-financeira para cada um dos ascensores. Por último, foi desenvolvido um simulador que permite definir a solução de recuperação de energia que seja técnica e economicamente mais viável, para um dado ascensor eléctrico de roda de aderência instalado, mediante a introdução dos parâmetros técnicos do ascensor em avaliação.