5 resultados para Communication systems

em Instituto Politécnico do Porto, Portugal


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Field communication systems (fieldbuses) are widely used as the communication support for distributed computer-controlled systems (DCCS) within all sort of process control and manufacturing applications. There are several advantages in the use of fieldbuses as a replacement for the traditional point-to-point links between sensors/actuators and computer-based control systems, within which the most relevant is the decentralisation and distribution of the processing power over the field. A widely used fieldbus is the WorldFIP, which is normalised as European standard EN 50170. Using WorldFIP to support DCCS, an important issue is “how to guarantee the timing requirements of the real-time traffic?” WorldFIP has very interesting mechanisms to schedule data transfers, since it explicitly distinguishes periodic and aperiodic traffic. In this paper, we describe how WorldFIP handles these two types of traffic, and more importantly, we provide a comprehensive analysis on how to guarantee the timing requirements of the real-time traffic.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this paper, we analyze the performance limits of the slotted CSMA/CA mechanism of IEEE 802.15.4 in the beacon-enabled mode for broadcast transmissions in WSNs. The motivation for evaluating the beacon-enabled mode is due to its flexibility for WSN applications as compared to the non-beacon enabled mode. Our analysis is based on an accurate simulation model of the slotted CSMA/CA mechanism on top of a realistic physical layer, with respect to the IEEE 802.15.4 standard specification. The performance of the slotted CSMA/CA is evaluated and analyzed for different network settings to understand the impact of the protocol attributes (superframe order, beacon order and backoff exponent) on the network performance, namely in terms of throughput (S), average delay (D) and probability of success (Ps). We introduce the concept of utility (U) as a combination of two or more metrics, to determine the best offered load range for an optimal behavior of the network. We show that the optimal network performance using slotted CSMA/CA occurs in the range of 35% to 60% with respect to an utility function proportional to the network throughput (S) divided by the average delay (D).

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The IEEE 802.15.4 protocol proposes a flexible communication solution for Low-Rate Wireless Personal Area Networks (LR-WPAN) including wireless sensor networks (WSNs). It presents the advantage to fit different requirements of potential applications by adequately setting its parameters. When in beaconenabled mode, the protocol can provide timeliness guarantees by using its Guaranteed Time Slot (GTS) mechanism. However, power-efficiency and timeliness guarantees are often two antagonistic requirements in wireless sensor networks. The purpose of this paper is to analyze and propose a methodology for setting the relevant parameters of IEEE 802.15.4-compliant WSNs that takes into account a proper trade-off between power-efficiency and delay bound guarantees. First, we propose two accurate models of service curves for a GTS allocation as a function of the IEEE 802.15.4 parameters, using Network Calculus formalism. We then evaluate the delay bound guaranteed by a GTS allocation and express it as a function of the duty cycle. Based on the relation between the delay requirement and the duty cycle, we propose a power-efficient superframe selection method that simultaneously reduces power consumption and enables meeting the delay requirements of real-time flows allocating GTSs. The results of this work may pave the way for a powerefficient management of the GTS mechanism in an IEEE 802.15.4 cluster.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

11th IEEE World Conference on Factory Communication Systems (WFCS 2015). 27 to 29, May, 2015, TII-SS-2: Scheduling and Performance Analysis. Palma de Mallorca, Spain.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

O projeto foi realizado na Toyota (divisão fabril de Ovar), no ano letivo 2014/2015, teve por base um estágio extracurricular que foi realizado para que desta forma tomasse contacto com uma realidade concreta e absoluta no contexto empresarial. O estágio serviu, principalmente, como uma experiência na compreensão do funcionamento de uma indústria de automóveis. Este projeto desenvolve-se no âmbito do 2ºano do Mestrado de Logística e apresenta os contributos desenvolvidos no departamento de logística para a reorganização da mesma para a produção de um novo modelo automóvel. Atualmente, a Toyota, para os modelos de automóveis que produz, recebe os componentes em CKD (Completed Knocked Down) provenientes do Japão em lotes de cinco unidades. Estes lotes são armazenados no armazém, de onde só saem quando for dada ordem para serem produzidos. Cada lote tem várias caixas, que são colocadas à vez numa zona comum de abertura. São retidos os componentes das caixas CKD e colocados nos transportadores próprios dos postos correspondentes (supermercado de linha). Isto significa que sempre que é solicitado uma viatura de um determinado lote, são obrigados a produzir as cinco unidades. Isto significa que as restantes unidades do lote terão que ficar em parque aberto a aguardar venda futura, para além de ter um stock desnecessário, estas unidades ficam vulneráveis e sofrem desgaste, pois estão expostas à intempérie, causando graves problemas de qualidade e respetivos custos associados. Recentemente, foi decidida a produção do modelo Land Cruiser 70 na unidade industrial de Ovar, Portugal, o que obrigou a uma reorganização da produção e processos logísticos para a sua produção. Os objetivos que a empresa pretende com a entrada de um novo projeto Land Cruiser 70, são os seguintes: Alterar o sistema de abastecimento, implementando o abastecimento unitário em toda a fábrica para o novo modelo, garantindo o “one by one production”; Definir o funcionamento do processo logístico desde a chegada dos componentes até ficarem disponíveis no supermercado de linha. Para isso será necessário dimensionar armazém e zona de abertura, definir layouts e quantidade de stocks, bem como definir sistemas de comunicação entre abertura e supermercado; Verificar as peças que vão fazer parte do chassi por posto e contabilizar os dolly´s1 necessários; Fazer o layout de abastecimento da linha do chassi; Calcular o tempo de abertura, de abastecimento e de picking do chassi e de triming. Este projeto tem em conta a política de melhoria contínua de forma a conseguir satisfazer o cliente (ser eficaz) utilizando cada vez menos recursos quer físicos quer humanos (ser eficiente, detetar e eliminar os desperdícios). O presente projeto foi inserido na equipa de melhoria contínua da logística, maioritariamente no chassi. Em termos globais, os objetivos propostos neste estágio foram atingidos com êxito.