109 resultados para Bus driver

em Instituto Politécnico do Porto, Portugal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of multicores is becoming widespread inthe field of embedded systems, many of which have real-time requirements. Hence, ensuring that real-time applications meet their timing constraints is a pre-requisite before deploying them on these systems. This necessitates the consideration of the impact of the contention due to shared lowlevel hardware resources like the front-side bus (FSB) on the Worst-CaseExecution Time (WCET) of the tasks. Towards this aim, this paper proposes a method to determine an upper bound on the number of bus requests that tasks executing on a core can generate in a given time interval. We show that our method yields tighter upper bounds in comparison with the state of-the-art. We then apply our method to compute the extra contention delay incurred by tasks, when they are co-scheduled on different cores and access the shared main memory, using a shared bus, access to which is granted using a round-robin arbitration (RR) protocol.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The usage of COTS-based multicores is becoming widespread in the field of embedded systems. Providing realtime guarantees at design-time is a pre-requisite to deploy real-time systems on these multicores. This necessitates the consideration of the impact of the contention due to shared low-level hardware resources on the Worst-Case Execution Time (WCET) of the tasks. As a step towards this aim, this paper first identifies the different factors that make the WCET analysis a challenging problem in a typical COTS-based multicore system. Then, we propose and prove, a mathematically correct method to determine tight upper bounds on the WCET of the tasks, when they are co-scheduled on different cores.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The current industry trend is towards using Commercially available Off-The-Shelf (COTS) based multicores for developing real time embedded systems, as opposed to the usage of custom-made hardware. In typical implementation of such COTS-based multicores, multiple cores access the main memory via a shared bus. This often leads to contention on this shared channel, which results in an increase of the response time of the tasks. Analyzing this increased response time, considering the contention on the shared bus, is challenging on COTS-based systems mainly because bus arbitration protocols are often undocumented and the exact instants at which the shared bus is accessed by tasks are not explicitly controlled by the operating system scheduler; they are instead a result of cache misses. This paper makes three contributions towards analyzing tasks scheduled on COTS-based multicores. Firstly, we describe a method to model the memory access patterns of a task. Secondly, we apply this model to analyze the worst case response time for a set of tasks. Although the required parameters to obtain the request profile can be obtained by static analysis, we provide an alternative method to experimentally obtain them by using performance monitoring counters (PMCs). We also compare our work against an existing approach and show that our approach outperforms it by providing tighter upper-bound on the number of bus requests generated by a task.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Contention on the memory bus in COTS based multicore systems is becoming a major determining factor of the execution time of a task. Analyzing this extra execution time is non-trivial because (i) bus arbitration protocols in such systems are often undocumented and (ii) the times when the memory bus is requested to be used are not explicitly controlled by the operating system scheduler; they are instead a result of cache misses. We present a method for finding an upper bound on the extra execution time of a task due to contention on the memory bus in COTS based multicore systems. This method makes no assumptions on the bus arbitration protocol (other than assuming that it is work-conserving).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Uma cidade amiga das pessoas idosas é um meio urbano onde são proporcionadas condições de saúde, segurança e participação que permitem às pessoas mais velhas envelhecerem activamente e viverem com dignidade. A nossa investigação, de natureza qualitativa e exploratória, teve como objectivo verificar se a cidade do Porto possui características de uma cidade amiga das pessoas idosas, na perspectiva de idosos residentes neste meio urbano. Para tal, realizamos dois focus groups com idosos habitantes nas Freguesias de S. Nicolau e Sé, seleccionados a partir de uma amostragem por conveniência, tendo sido utilizado um guião de entrevista constituído pelas categorias: espaços exteriores e edifícios; transportes; habitação; respeito e inclusão social; participação social; participação cívica e emprego; comunicação e informação; apoio comunitário e serviços de saúde. No nosso estudo, foi possível constatar que os participantes, apesar de se manifestarem genericamente satisfeitos com a sua vida na cidade do Porto e identificarem algumas características desse meio urbano que podem ser consideradas como amigas das pessoas idosas, descreveram um vasto conjunto de condições da cidade que limitam o seu quotidiano. Neste sentido, relativamente aos espaços exteriores, para além de os caracterizarem como inseguros quanto ao crime, reconheceram essencialmente limitações à sua mobilidade e segurança física, tais como os declives acentuados e as irregularidades do terreno de certos passeios, o curto período de tempo proporcionado para que sejam atravessadas algumas passadeiras e o aglomerar de lixo e estacionamento de veículos em locais destinados a peões. Adicionalmente, os participantes manifestaram-se insatisfeitos com o número de autocarros e paragens disponíveis na sua freguesia e identificaram nas habitações existentes na cidade do Porto um elevado nível de degradação estrutural e uma falta generalizada de condições de conforto, acessibilidade e protecção face a condições atmosféricas. Em oposição, foi possível verificar que a maior parte dos participantes se sente respeitado e incluído nas actividades e eventos realizados na sua comunidade. Da mesma forma, mostraram-se satisfeitos com a variedade de actividades em que têm oportunidade de participar, incluindo actividades de voluntariado e trabalho não remunerado. Aspectos característicos de uma cidade amiga do idoso, tais como a aglomeração geográfica dos edifícios públicos e lojas e a existência de serviços de apoio comunitário foram também identificados.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O presente estudo, de natureza qualitativa e exploratório, teve como objectivo verificar se a cidade do Porto possui características de uma cidade amiga das pessoas idosas, na perspectiva de idosos residentes neste meio urbano. Uma cidade amiga das pessoas idosas estimula um envelhecimento activo e com dignidade ao optimizar oportunidades para a saúde, participação e segurança. Foram realizados dois focus groups com pessoas idosas habitantes das Freguesias da Vitória e Miragaia, seleccionados a partir de uma amostragem por conveniência, recorrendo-se a um guião de entrevista constituído pelas seguintes categorias: espaços exteriores e edifícios; transportes; habitação; respeito e inclusão social; participação social; participação cívica e emprego; comunicação e informação; apoio comunitário e serviços de saúde. Desta forma, foi possível verificar que, apesar dos participantes identificarem um conjunto de condições que podem ser consideradas amigas das pessoas idosas, a maior parte das características referidas foram encaradas como negativas e com um impacto considerável no seu quotidiano. A participação social, os meios de informação disponíveis e os serviços comunitários são as condições perante as quais os participantes demonstram maior satisfação. Pelo contrário, em relação aos espaços exteriores, referem aspectos, como os grandes declives, as más condições dos pavimentos, os obstáculos nos passeios e a acumulação de lixo, que contribuem para um ambiente desagradável e inseguro. Quanto aos transportes, as modificações na identificação dos veículos, as alterações nos percursos, a pouca consciencialização dos motoristas em relação às necessidades dos mais velhos e as condições das paragens são os principais factores destacados, enquanto as habitações são consideradas antigas e com más condições estruturais e de acesso. De uma forma geral, estes idosos consideram-se pouco reconhecidos e desrespeitados pelos mais jovens e deparam-se com grandes dificuldades no acesso a actividades laborais e de voluntariado.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In a liberalized electricity market, the Transmission System Operator (TSO) plays a crucial role in power system operation. Among many other tasks, TSO detects congestion situations and allocates the payments of electricity transmission. This paper presents a software tool for congestion management and transmission price determination in electricity markets. The congestion management is based on a reformulated Optimal Power Flow (OPF), whose main goal is to obtain a feasible solution for the re-dispatch minimizing the changes in the dispatch proposed by the market operator. The transmission price computation considers the physical impact caused by the market agents in the transmission network. The final tariff includes existing system costs and also costs due to the initial congestion situation and losses costs. The paper includes a case study for the IEEE 30 bus power system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The use of distributed energy resources, based on natural intermittent power sources, like wind generation, in power systems imposes the development of new adequate operation management and control methodologies. A short-term Energy Resource Management (ERM) methodology performed in two phases is proposed in this paper. The first one addresses the day-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. The ERM scheduling is a complex optimization problem due to the high quantity of variables and constraints. In this paper the main goal is to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixedinteger non-linear programming approach. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units and 1000 electric vehicles has been implemented in a simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Power systems have been suffering huge changes mainly due to the substantial increase of distributed generation and to the operation in competitive environments. Virtual power players can aggregate a diversity of players, namely generators and consumers, and a diversity of energy resources, including electricity generation based on several technologies, storage and demand response. Resource management gains an increasing relevance in this competitive context, while demand side active role provides managers with increased demand elasticity. This makes demand response use more interesting and flexible, giving rise to a wide range of new opportunities.This paper proposes a methodology for managing demand response programs in the scope of virtual power players. The proposed method is based on the calculation of locational marginal prices (LMP). The evaluation of the impact of using demand response specific programs on the LMP value supports the manager decision concerning demand response use. The proposed method has been computationally implemented and its application is illustrated in this paper using a 32 bus network with intensive use of distributed generation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The introduction of Electric Vehicles (EVs) together with the implementation of smart grids will raise new challenges to power system operators. This paper proposes a demand response program for electric vehicle users which provides the network operator with another useful resource that consists in reducing vehicles charging necessities. This demand response program enables vehicle users to get some profit by agreeing to reduce their travel necessities and minimum battery level requirements on a given period. To support network operator actions, the amount of demand response usage can be estimated using data mining techniques applied to a database containing a large set of operation scenarios. The paper includes a case study based on simulated operation scenarios that consider different operation conditions, e.g. available renewable generation, and considering a diversity of distributed resources and electric vehicles with vehicle-to-grid capacity and demand response capacity in a 33 bus distribution network.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Effective legislation and standards for the coordination procedures between consumers, producers and the system operator supports the advances in the technologies that lead to smart distribution systems. In short-term (ST) maintenance scheduling procedure, the energy producers in a distribution system access to the long-term (LT) outage plan that is released by the distribution system operator (DSO). The impact of this additional information on the decision-making procedure of producers in ST maintenance scheduling is studied in this paper. The final ST maintenance plan requires the approval of the DSO that has the responsibility to secure the network reliability and quality, and other players have to follow the finalized schedule. Maintenance scheduling in the producers’ layer and the coordination procedure between them and the DSO is modelled in this paper. The proposed method is applied to a 33-bus distribution system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In competitive electricity markets with deep concerns for the efficiency level, demand response programs gain considerable significance. As demand response levels have decreased after the introduction of competition in the power industry, new approaches are required to take full advantage of demand response opportunities. Grid operators and utilities are taking new initiatives, recognizing the value of demand response for grid reliability and for the enhancement of organized spot markets’ efficiency. This paper proposes a methodology for the selection of the consumers that participate in an event, which is the responsibility of the Portuguese transmission network operator. The proposed method is intended to be applied in the interruptibility service implemented in Portugal, in convergence with Spain, in the context of the Iberian electricity market. This method is based on the calculation of locational marginal prices (LMP) which are used to support the decision concerning the consumers to be schedule for participation. The proposed method has been computationally implemented and its application is illustrated in this paper using a 937 bus distribution network with more than 20,000 consumers.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Electric vehicles introduction will affect cities environment and urban mobility policies. Network system operators will have to consider the electric vehicles in planning and operation activities due to electric vehicles’ dependency on the electricity grid. The present paper presents test cases using an Electric Vehicle Scenario Simulator (EVeSSi) being developed by the authors. The test cases include two scenarios considering a 33 bus network with up to 2000 electric vehicles in the urban area. The scenarios consider a penetration of 10% of electric vehicles (200 of 2000), 30% (600) and 100% (2000). The first scenario will evaluate network impacts and the second scenario will evaluate CO2 emissions and fuel consumption.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The current regulatory framework for maintenance outage scheduling in distribution systems needs revision to face the challenges of future smart grids. In the smart grid context, generation units and the system operator perform new roles with different objectives, and an efficient coordination between them becomes necessary. In this paper, the distribution system operator (DSO) of a microgrid receives the proposals for shortterm (ST) planned outages from the generation and transmission side, and has to decide the final outage plans, which is mandatory for the members to follow. The framework is based on a coordination procedure between the DSO and other market players. This paper undertakes the challenge of optimization problem in a smart grid where the operator faces with uncertainty. The results show the effectiveness and applicability of the proposed regulatory framework in the modified IEEE 34- bus test system.