167 resultados para Islanding Detection, Distributed Generation, Power Electronics, Smart Grid, Renewable Generation
Resumo:
Gradually smart grids and smart meters are closer to the home consumers. Several countries has developed studies focused in the impacts arising from the introduction of these technologies and one of the main advantages are related to energy efficiency, observed through the awareness of the population on behalf of a more efficient consumption. These benefits are felt directly by consumers through the savings on electricity bills and also by the concessionaires through the minimization of losses in transmission and distribution, system stability, smaller loading during peak hours, among others. In this article two projects that demonstrate the potential energy savings through smart meters and smart grids are presented. The first performed in Korea, focusing on the installation of smart meters and the impact of use of user interfaces. The second performed in Portugal, focusing on the control of loads in a residence with distributed generation.
Resumo:
Multi-agent approaches have been widely used to model complex systems of distributed nature with a large amount of interactions between the involved entities. Power systems are a reference case, mainly due to the increasing use of distributed energy sources, largely based on renewable sources, which have potentiated huge changes in the power systems’ sector. Dealing with such a large scale integration of intermittent generation sources led to the emergence of several new players, as well as the development of new paradigms, such as the microgrid concept, and the evolution of demand response programs, which potentiate the active participation of consumers. This paper presents a multi-agent based simulation platform which models a microgrid environment, considering several different types of simulated players. These players interact with real physical installations, creating a realistic simulation environment with results that can be observed directly in the reality. A case study is presented considering players’ responses to a demand response event, resulting in an intelligent increase of consumption in order to face the wind generation surplus.
Resumo:
Com a alteração da legislação energética em Portugal, nomeadamente a implementação da legislação de Micro e Minigeração, a produção distribuída cresceu de forma exponencial na rede elétrica nacional, diminuindo por um lado as perdas no transporte e distribuição, e por outro aumentando a complexidade na gestão do trânsito de potência ao Distribuidor. No entanto a motivação desta dissertação prende-se com o facto de que as centrais de produção distribuída, em particular as de tecnologia fotovoltaica, pela sua dimensão, serem instaladas nos pontos de consumo, em paralelo com a instalação elétrica de utilização do cliente e como tal, têm sido verificadas diversas anomalias no funcionamento e exploração das mesmas, por influência da má qualidade de energia resultante das más condições de funcionamento e exploração em que se encontram as instalações de consumo. A presente dissertação pretende apresentar uma descrição das anomalias mais frequentes verificadas nas centrais fotovoltaicas de minigeração com origem na qualidade da energia que transita das instalações elétricas de consumo ligadas ao mesmo ponto de interligação com a rede elétrica nacional. Como base de fundamento, foram demonstradas através de três casos práticos reais, algumas das mais frequentes e prejudiciais anomalias descritas na presente dissertação. Foram escolhidos 3 casos reais com diferentes tipos de instalação de consumo sendo que um deles não apresenta qualquer anomalia de forma a comprovar o bom funcionamento em condições normais de ambas as instalações. Foram encontradas e demonstradas várias soluções paras os diferentes tipos de anomalias, no entanto esta dissertação vai permitir não só a resolução deste tipo de anomalias em centrais fotovoltaicas em exploração e já com prejuízos avultados mas também introduzir em futuras instalações a análise da qualidade da energia nas instalações de consumo em fase preliminar de estudo de implementação de centrais fotovoltaicas de minigeração e de autoconsumo, precavendo futuros problemas de rentabilidade técnico-económica. Este estudo, irá certamente servir de motor de impulsão para a preocupação com a Qualidade da Energia essencialmente dentro das instalações elétricas de consumo sensibilizando os seus gestores energéticos. Poderá ainda impulsionar a reformulação do Regulamento de Qualidade de Serviço para exigências ainda mais apertadas de forma a incorporar algumas das anomalias aqui descritas, sendo por isso um elemento de alerta para todos os “Players” do Sistema Elétrico Nacional tendo como limite a melhoria continua da Segurança e da Qualidade da energia na rede elétrica beneficiando da sensibilização de todos os intervenientes.
Resumo:
The large increase of renewable energy sources and Distributed Generation (DG) of electricity gives place to the Virtual Power Producer (VPP) concept. VPPs may turn electricity generation by renewable sources valuable in electricity markets. Information availability and adequate decision-support tools are crucial for achieving VPPs’ goals. This involves information concerning associated producers and market operation. This paper presents ViProd, a simulation tool that allows simulating VPPs operation, focusing mainly in the information requirements for adequate decision making.
Resumo:
The large increase of renewable energy sources and Distributed Generation (DG) of electricity gives place to the Virtual Power Producer (VPP) concept. VPPs can reinforce the importance of these generation technologies making them valuable in electricity markets. One of the most important tasks of a VPP is the conjugation of technologies to obtain a consistent set of associated producers and allow them to operate in the electric market. This paper presents some characteristics regarding already existent technologies and relevant aspects for producers and for VPP.
Resumo:
This paper proposes a wind power forecasting methodology based on two methods: direct wind power forecasting and wind speed forecasting in the first phase followed by wind power forecasting using turbines characteristics and the aforementioned wind speed forecast. The proposed forecasting methodology aims to support the operation in the scope of the intraday resources scheduling model, namely with a time horizon of 5 minutes. This intraday model supports distribution network operators in the short-term scheduling problem, in the smart grid context. A case study using a real database of 12 months recorded from a Portuguese wind power farm was used. The results show that the straightforward methodology can be applied in the intraday model with high wind speed and wind power accuracy. The wind power forecast direct method shows better performance than wind power forecast using turbine characteristics and wind speed forecast obtained in first phase.
Resumo:
In recent years, power systems have experienced many changes in their paradigm. The introduction of new players in the management of distributed generation leads to the decentralization of control and decision-making, so that each player is able to play in the market environment. In the new context, it will be very relevant that aggregator players allow midsize, small and micro players to act in a competitive environment. In order to achieve their objectives, virtual power players and single players are required to optimize their energy resource management process. To achieve this, it is essential to have financial resources capable of providing access to appropriate decision support tools. As small players have difficulties in having access to such tools, it is necessary that these players can benefit from alternative methodologies to support their decisions. This paper presents a methodology, based on Artificial Neural Networks (ANN), and intended to support smaller players. In this case the present methodology uses a training set that is created using energy resource scheduling solutions obtained using a mixed-integer linear programming (MIP) approach as the reference optimization methodology. The trained network is used to obtain locational marginal prices in a distribution network. The main goal of the paper is to verify the accuracy of the ANN based approach. Moreover, the use of a single ANN is compared with the use of two or more ANN to forecast the locational marginal price.
Resumo:
All over the world Distributed Generation is seen as a valuable help to get cleaner and more efficient electricity. To get negotiation power and advantages of scale economy, distributed producers can be aggregated giving place to a new concept: the Virtual Power Producer. Virtual Power Producers are multitechnology and multi-site heterogeneous entities. Virtual Power Producers should adopt organization and management methodologies so that they can make Distributed Generation a really profitable activity, able to participate in the market. In this paper we address the development of a multi-agent market simulator – MASCEM – able to study alternative coalitions of distributed producers in order to identify promising Virtual Power Producers in an electricity market.
Resumo:
Electricity Markets are not only a new reality but an evolving one as the involved players and rules change at a relatively high rate. Multi-agent simulation combined with Artificial Intelligence techniques may result in sophisticated tools very helpful under this context. Some simulation tools have already been developed, some of them very interesting. However, at the present state it is important to go a step forward in Electricity Markets simulators as this is crucial for facing changes in Power Systems. This paper explains the context and needs of electricity market simulation, describing the most important characteristics of available simulators. We present our work concerning MASCEM simulator, presenting its features as well as the improvements being made to accomplish the change and challenging reality of Electricity Markets.
Resumo:
Recent changes in power systems mainly due to the substantial increase of distributed generation and to the operation in competitive environments has created new challenges to operation and planning. In this context, Virtual Power Players (VPP) can aggregate a diversity of players, namely generators and consumers, and a diversity of energy resources, including electricity generation based on several technologies, storage and demand response. Demand response market implementation has been done in recent years. Several implementation models have been considered. An important characteristic of a demand response program is the trigger criterion. A program for which the event trigger depends on the Locational Marginal Price (LMP) used by the New England Independent System operator (ISO-NE) inspired the present paper. This paper proposes a methodology to support VPP demand response programs management. The proposed method has been computationally implemented and its application is illustrated using a 32 bus network with intensive use of distributed generation. Results concerning the evaluation of the impact of using demand response events are also presented.
Resumo:
The increasing use of distributed generation units based on renewable energy sources, the consideration of demand-side management as a distributed resource, and the operation in the scope of competitive electricity markets have caused important changes in the way that power systems are operated. The new distributed resources require an entity (player) capable to make them able to participate in electricity markets. This entity has been known as Virtual Power Player (VPP). VPPs need to consider all the business opportunities available to their resources, considering all the relevant players, the market and/or other VPPs to accomplish their goals. This paper presents a methodology that considers all these opportunities to minimize the operation costs of a VPP. The method is applied to a distribution network managed by four independent VPPs with intensive use of distributed resources.
Resumo:
The growing importance and influence of new resources connected to the power systems has caused many changes in their operation. Environmental policies and several well know advantages have been made renewable based energy resources largely disseminated. These resources, including Distributed Generation (DG), are being connected to lower voltage levels where Demand Response (DR) must be considered too. These changes increase the complexity of the system operation due to both new operational constraints and amounts of data to be processed. Virtual Power Players (VPP) are entities able to manage these resources. Addressing these issues, this paper proposes a methodology to support VPP actions when these act as a Curtailment Service Provider (CSP) that provides DR capacity to a DR program declared by the Independent System Operator (ISO) or by the VPP itself. The amount of DR capacity that the CSP can assure is determined using data mining techniques applied to a database which is obtained for a large set of operation scenarios. The paper includes a case study based on 27,000 scenarios considering a diversity of distributed resources in a 33 bus distribution network.
Resumo:
This paper presents a new methodology for the creation and management of coalitions in Electricity Markets. This approach is tested using the multi-agent market simulator MASCEM, taking advantage of its ability to provide the means to model and simulate VPP (Virtual Power Producers). VPPs are represented as coalitions of agents, with the capability of negotiating both in the market, and internally, with their members, in order to combine and manage their individual specific characteristics and goals, with the strategy and objectives of the VPP itself. The new features include the development of particular individual facilitators to manage the communications amongst the members of each coalition independently from the rest of the simulation, and also the mechanisms for the classification of the agents that are candidates to join the coalition. In addition, a global study on the results of the Iberian Electricity Market is performed, to compare and analyze different approaches for defining consistent and adequate strategies to integrate into the agents of MASCEM. This, combined with the application of learning and prediction techniques provide the agents with the ability to learn and adapt themselves, by adjusting their actions to the continued evolving states of the world they are playing in.
Resumo:
Currently, Power Systems (PS) already accommodate a substantial penetration of DG and operate in competitive environments. In the future PS will have to deal with largescale integration of DG and other distributed energy resources (DER), such as storage means, and provide to market agents the means to ensure a flexible and secure operation. This cannot be done with the traditional PS operation. SCADA (Supervisory Control and Data Acquisition) is a vital infrastructure for PS. Current SCADA adaptation to accommodate the new needs of future PS does not allow to address all the requirements. In this paper we present a new conceptual design of an intelligent SCADA, with a more decentralized, flexible, and intelligent approach, adaptive to the context (context awareness). Once a situation is characterized, data and control options available to each entity are re-defined according to this context, taking into account operation normative and a priori established contracts. The paper includes a case-study of using future SCADA features to use DER to deal with incident situations, preventing blackouts.
Resumo:
This paper presents a new architecture for the MASCEM, a multi-agent electricity market simulator. This is implemented in a Prolog which is integrated in the JAVA program by using the LPA Win-Prolog Intelligence Server (IS) provides a DLL interface between Win-Prolog and other applications. This paper mainly focus on the MASCEM ability to provide the means to model and simulate Virtual Power Producers (VPP). VPPs are represented as a coalition of agents, with specific characteristics and goals. VPPs can reinforce the importance of these generation technologies making them valuable in electricity markets.