85 resultados para vehicle routing problem


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Engineering Education includes not only teaching theoretical fundamental concepts but also its verification during practical lessons in laboratories. The usual strategies to carry out this action are frequently based on Problem Based Learning, starting from a given state and proceeding forward to a target state. The possibility or the effectiveness of this procedure depends on previous states and if the present state was caused or resulted from earlier ones. This often happens in engineering education when the achieved results do not match the desired ones, e.g. when programming code is being developed or when the cause of the wrong behavior of an electronic circuit is being identified. It is thus important to also prepare students to proceed in the reverse way, i.e. given a start state generate the explanation or even the principles that underlie it. Later on, this sort of skills will be important. For instance, to a doctor making a patient?s story or to an engineer discovering the source of a malfunction. This learning methodology presents pedagogical advantages besides the enhanced preparation of students to their future work. The work presented on his document describes an automation project developed by a group of students in an engineering polytechnic school laboratory. The main objective was to improve the performance of a Braille machine. However, in a scenario of Reverse Problem-Based learning, students had first to discover and characterize the entire machine's function before being allowed (and being able) to propose a solution for the existing problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Uma das maiores preocupações do mundo neste momento prende-se com o facto da grande dependência do petróleo e seus aglomerados. Esta dependência causa dois problemas: novos estudos fomentam o começo da escassez deste produto, atirando para cima o preço deste material precioso, e a poluição que que este causa. Um dos sectores mais dependentes e que mais polui, é o dos transportes. Nos últimos anos, o mundo teve finalmente noção deste problema e uma das apostas neste sector é o desenvolvimento da célula de combustível, uma tecnologia que utiliza água como combustível, podendo ser reutilizada. É uma tecnologia ainda em fase de introdução pelo que, para já, a médio prazo não será solução. Uma solução intermédia é a utilização de energia elétrica como ―combustível‖. Apesar de grande parte da produção de energia elétrica ser a partir da queima de derivados de petróleo, os motores elétricos são por si só muito mais eficientes comparando com os motores de combustão. Não se vai aqui debater se são uma solução com viabilidade devido à questão da transferência da dependência do petróleo do sector dos transportes para o sector da produção de energia elétrica. O objetivo deste trabalho será desenvolver um sistema de faça a gestão do ―combustível‖ dos veículos elétricos, ou seja, baterias. Essa gestão tem como objetivo aumentar a autonomia do veículo e prolongar o tempo de vida das baterias. Na primeira fase, uma introdução à atualidade dos veículos elétricos, fazendo uma análise às diferentes soluções. Serão referidas os diferentes tipos de baterias e suas características, passando depois para exemplos de sistemas de gestão de baterias. A explicação da ideia para este sistema vem com o capítulo projeto, ficando a implementação para o capítulo seguinte.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents an optimization approach for the job shop scheduling problem (JSSP). The JSSP is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. The proposed approach is based on a genetic algorithm technique. The scheduling rules such as SPT and MWKR are integrated into the process of genetic evolution. The chromosome representation of the problem is based on random keys. The schedules are constructed using a priority rule in which the priorities and delay times of the operations are defined by the genetic algorithm. Schedules are constructed using a procedure that generates parameterized active schedules. After a schedule is obtained a local search heuristic is applied to improve the solution. The approach is tested on a set of standard instances taken from the literature and compared with other approaches. The computation results validate the effectiveness of the proposed approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A principal causa de morte e incapacidade em Portugal deve-se a Acidentes Vasculares Cerebrais (AVC). Assim, este trabalho de investigação pretende identificar e quantificar quais os fatores que contribuem para a ocorrência de um AVC (por tipo e com sequelas), duração do internamento e potenciais soluções de encaminhamento terapêutico para o doente após a ocorrência de AVC. Identificando e quantificando tais fatores é possível traçar um perfil de doente em risco, atuando sobre ele através de medidas preventivas de forma a minimizar o impacto deste problema em termos pessoais, sociais e financeiros. Para atingir este objetivo foi analisada uma amostra de indivíduos internados em 2012 na Unidade de AVC do Centro Hospitalar do Tâmega e Sousa. Dos casos analisados 87,8% são causados por AVCI (isquémicos) e 12,2% por casos de AVCH (hemorrágicos). Do total dos casos, 58,9% apresentam sequelas. A hipertensão, a diabetes de Mellitus e o Colesterol apresentam-se como antecedentes clínicos com elevado fator de risco. O tabagismo regista grande importância na propulsão dos anteriores fatores analisados assim como o alcoolismo. Conclui-se que a prevenção do AVC e outras doenças cardiovasculares é importante desde a idade escolar, dando-se especial importância ao período que antecede os 36 anos de idade, altura em que se começa a verificar uma subida agravada de ocorrências. O investimento na prevenção e vigilância médica do cidadão é um fator crucial neste período podendo reduzir em grande escala os custos associados a médio-longo prazo para todas as partes intervenientes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the emergence of low-power wireless hardware new ways of communication were needed. In order to standardize the communication between these low powered devices the Internet Engineering Task Force (IETF) released the 6LoWPAN stand- ard that acts as an additional layer for making the IPv6 link layer suitable for the lower-power and lossy networks. In the same way, IPv6 Routing Protocol for Low- Power and Lossy Networks (RPL) has been proposed by the IETF Routing Over Low power and Lossy networks (ROLL) Working Group as a standard routing protocol for IPv6 routing in low-power wireless sensor networks. The research performed in this thesis uses these technologies to implement a mobility process. Mobility management is a fundamental yet challenging area in low-power wireless networks. There are applications that require mobile nodes to exchange data with a xed infrastructure with quality-of-service guarantees. A prime example of these applications is the monitoring of patients in real-time. In these scenarios, broadcast- ing data to all access points (APs) within range may not be a valid option due to the energy consumption, data storage and complexity requirements. An alternative and e cient option is to allow mobile nodes to perform hand-o s. Hand-o mechanisms have been well studied in cellular and ad-hoc networks. However, low-power wireless networks pose a new set of challenges. On one hand, simpler radios and constrained resources ask for simpler hand-o schemes. On the other hand, the shorter coverage and higher variability of low-power links require a careful tuning of the hand-o parameters. In this work, we tackle the problem of integrating smart-HOP within a standard protocol, speci cally RPL. The simulation results in Cooja indicate that the pro- posed scheme minimizes the hand-o delay and the total network overhead. The standard RPL protocol is simply unable to provide a reliable mobility support sim- ilar to other COTS technologies. Instead, they support joining and leaving of nodes, with very low responsiveness in the existence of physical mobility.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The massification of electric vehicles (EVs) can have a significant impact on the power system, requiring a new approach for the energy resource management. The energy resource management has the objective to obtain the optimal scheduling of the available resources considering distributed generators, storage units, demand response and EVs. The large number of resources causes more complexity in the energy resource management, taking several hours to reach the optimal solution which requires a quick solution for the next day. Therefore, it is necessary to use adequate optimization techniques to determine the best solution in a reasonable amount of time. This paper presents a hybrid artificial intelligence technique to solve a complex energy resource management problem with a large number of resources, including EVs, connected to the electric network. The hybrid approach combines simulated annealing (SA) and ant colony optimization (ACO) techniques. The case study concerns different EVs penetration levels. Comparisons with a previous SA approach and a deterministic technique are also presented. For 2000 EVs scenario, the proposed hybrid approach found a solution better than the previous SA version, resulting in a cost reduction of 1.94%. For this scenario, the proposed approach is approximately 94 times faster than the deterministic approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The container loading problem (CLP) is a combinatorial optimization problem for the spatial arrangement of cargo inside containers so as to maximize the usage of space. The algorithms for this problem are of limited practical applicability if real-world constraints are not considered, one of the most important of which is deemed to be stability. This paper addresses static stability, as opposed to dynamic stability, looking at the stability of the cargo during container loading. This paper proposes two algorithms. The first is a static stability algorithm based on static mechanical equilibrium conditions that can be used as a stability evaluation function embedded in CLP algorithms (e.g. constructive heuristics, metaheuristics). The second proposed algorithm is a physical packing sequence algorithm that, given a container loading arrangement, generates the actual sequence by which each box is placed inside the container, considering static stability and loading operation efficiency constraints.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The minimum interval graph completion problem consists of, given a graph G = ( V, E ), finding a supergraph H = ( V, E ∪ F ) that is an interval graph, while adding the least number of edges |F| . We present an integer programming formulation for solving the minimum interval graph completion problem recurring to a characteri- zation of interval graphs that produces a linear ordering of the maximal cliques of the solution graph.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we address an order processing optimization problem known as minimization of open stacks (MOSP). We present an integer pro gramming model, based on the existence of a perfect elimination scheme in interval graphs, which finds an optimal sequence for the costumers orders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the introduction of the electrics cars into the market new technologies regarding the battery are being developed and new problems to be solved, one of them the battery management system because each type of cell requires a specific way of handling. This research is done using the active research method to find out the actual problem on this subject and features a BMS should have, understand how they work and how to develop them applied to the purpose on this work. Once the features the BMS should have are clarified, it’s possible to develop a BMS for an electric racing car. The decisions are made taking into consideration the nature of the vehicle being developed. After the project done it’s clear to see that what was developed was not only the BMS itself but all the other factors around it, such as CAN communication, safety control, diagnostics and so on.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Order picking consists in retrieving products from storage locations to satisfy independent orders from multiple customers. It is generally recognized as one of the most significant activities in a warehouse (Koster et al, 2007). In fact, order picking accounts up to 50% (Frazelle, 2001) or even 80% (Van den Berg, 1999) of the total warehouse operating costs. The critical issue in today’s business environment is to simultaneously reduce the cost and increase the speed of order picking. In this paper, we address the order picking process in one of the Portuguese largest companies in the grocery business. This problem was proposed at the 92nd European Study Group with Industry (ESGI92). In this setting, each operator steers a trolley on the shop floor in order to select items for multiple customers. The objective is to improve their grocery e-commerce and bring it up to the level of the best international practices. In particular, the company wants to improve the routing tasks in order to decrease distances. For this purpose, a mathematical model for a faster open shop picking was developed. In this paper, we describe the problem, our proposed solution as well as some preliminary results and conclusions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a methodology for multi-objective day-ahead energy resource scheduling for smart grids considering intensive use of distributed generation and Vehicle- To-Grid (V2G). The main focus is the application of weighted Pareto to a multi-objective parallel particle swarm approach aiming to solve the dual-objective V2G scheduling: minimizing total operation costs and maximizing V2G income. A realistic mathematical formulation, considering the network constraints and V2G charging and discharging efficiencies is presented and parallel computing is applied to the Pareto weights. AC power flow calculation is included in the metaheuristics approach to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a decision support tool methodology to help virtual power players (VPPs) in the Smart Grid (SGs) context to solve the day-ahead energy resource scheduling considering the intensive use of Distributed Generation (DG) and Vehicle-To-Grid (V2G). The main focus is the application of a new hybrid method combing a particle swarm approach and a deterministic technique based on mixedinteger linear programming (MILP) to solve the day-ahead scheduling minimizing total operation costs from the aggregator point of view. A realistic mathematical formulation, considering the electric network constraints and V2G charging and discharging efficiencies is presented. Full AC power flow calculation is included in the hybrid method to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.