71 resultados para Distribution transformer modeling
Resumo:
Most of the traditional software and database development approaches tend to be serial, not evolutionary and certainly not agile, especially on data-oriented aspects. Most of the more commonly used methodologies are strict, meaning they’re composed by several stages each with very specific associated tasks. A clear example is the Rational Unified Process (RUP), divided into Business Modeling, Requirements, Analysis & Design, Implementation, Testing and Deployment. But what happens when the needs of a well design and structured plan, meet the reality of a small starting company that aims to build an entire user experience solution. Here resource control and time productivity is vital, requirements are in constant change, and so is the product itself. In order to succeed in this environment a highly collaborative and evolutionary development approach is mandatory. The implications of constant changing requirements imply an iterative development process. Project focus is on Data Warehouse development and business modeling. This area is usually a tricky one. Business knowledge is part of the enterprise, how they work, their goals, what is relevant for analyses are internal business processes. Throughout this document it will be explained why Agile Modeling development was chosen. How an iterative and evolutionary methodology, allowed for reasonable planning and documentation while permitting development flexibility, from idea to product. More importantly how it was applied on the development of a Retail Focused Data Warehouse. A productized Data Warehouse built on the knowledge of not one but several client needs. One that aims not just to store usual business areas but create an innovative sets of business metrics by joining them with store environment analysis, converting Business Intelligence into Actionable Business Intelligence.
Resumo:
Este trabalho tem como objetivo a modelação hidráulica e de qualidade de água de parte de uma rede de distribuição a alta pressão do grande Porto. Após calibração de um modelo utilizado no software EPANet foi possível simular o decaimento do cloro livre num troço da rede de abastecimento. Foi ainda possível concluir que os valores dos parâmetros característicos do modelo de qualidade são uma constante de decaimento no seio do fluido de 1,78 dia-1 (0,001239 min-1) a cerca de 22 ºC e, no ramal 6244-6245 Ramalde – Cabanas – Pedrouços, uma constante de decaimento na parede da tubagem de forma generalizada de 0,28 m/dia. Não foi possível obter conclusões sobre a adutora 6261 Jovim-Nova Sintra 2, ficando explícita a necessidade de um maior controlo sobre a variável temperatura.
Resumo:
In this study the inhalation doses and respective risk are calculated for the population living within a 20 km radius of a coal-fired power plant. The dispersion and deposition of natural radionuclides were simulated by a Gaussian dispersion model estimating the ground level activity concentration. The annual effective dose and total risk were 0.03205 mSv/y and 1.25 x 10-8, respectively. The effective dose is lower than the limit established by the ICRP and the risk is lower than the limit proposed by the U.S. EPA, which means that the considered exposure does not pose any risk for the public health.
Resumo:
As Leis de Potência, LP, (Power Laws, em inglês), Leis de Pareto ou Leis de Zipf são distribuições estatísticas, com inúmeras aplicações práticas, em sistemas naturais e artificiais. Alguns exemplos são a variação dos rendimentos pessoais ou de empresas, a ocorrência de palavras em textos, as repetições de sons ou conjuntos de sons em composições musicais, o número de vítimas em guerras ou outros cataclismos, a magnitude de tremores de terra, o número de vendas de livros ou CD’s na internet, o número de sítios mais acedidos na Internet, entre muitos outros. Vilfredo Pareto (1897-1906) afirma, no manual de economia política “Cours d’Economie Politique”, que grande parte da economia mundial segue uma determinada distribuição, em que 20% da população reúne 80% da riqueza total do país, estando, assim uma pequena fração da sociedade a controlar a maior fatia do dinheiro. Isto resume o comportamento de uma variável que segue uma distribuição de Pareto (ou Lei de Potência). Neste trabalho pretende-se estudar em pormenor a aplicação das leis de potência a fenómenos da internet, como sendo o número de sítios mais visitados, o número de links existentes em determinado sítio, a distribuição de nós numa rede da internet, o número livros vendidos e as vendas em leilões online. Os resultados obtidos permitem-nos concluir que todos os dados estudados são bem aproximados, numa escala logarítmica, por uma reta com declive negativo, seguindo, assim, uma distribuição de Pareto. O desenvolvimento e crescimento da Web, tem proporcionado um aumento do número dos utilizadores, conteúdos e dos sítios. Grande parte dos exemplos presentes neste trabalho serão alvo de novos estudos e de novas conclusões. O fato da internet ter um papel preponderante nas sociedades modernas, faz com que esteja em constante evolução e cada vez mais seja possível apresentar fenómenos na internet associados Lei de Potência.
Resumo:
The aim of this study is to optimize the heat flow through the pultrusion die assembly system on the manufacturing process of a specific glass-fiber reinforced polymer (GFRP) pultrusion profile. The control of heat flow and its distribution through whole die assembly system is of vital importance in optimizing the actual GFRP pultrusion process. Through mathematical modeling of heating-die process, by means of Finite Element Analysis (FEA) program, an optimum heater selection, die position and temperature control was achieved. The thermal environment within the die was critically modeled relative not only to the applied heat sources, but also to the conductive and convective losses, as well as the thermal contribution arising from the exothermic reaction of resin matrix as it cures or polymerizes from the liquid to solid condition. Numerical simulation was validated with basis on thermographic measurements carried out on key points along the die during pultrusion process.
Resumo:
Pultrusion is an industrial process used to produce glass fibers reinforced polymers profiles. These materials are worldwide used when performing characteristics, such as great electrical and magnetic insulation, high strength to weight ratio, corrosion and weather resistance, long service life and minimal maintenance are required. In this study, we present the results of the modelling and simulation of heat flow through a pultrusion die by means of Finite Element Analysis (FEA). The numerical simulation was calibrated based on temperature profiles computed from thermographic measurements carried out during pultrusion manufacturing process. Obtained results have shown a maximum deviation of 7%, which is considered to be acceptable for this type of analysis, and is below to the 10% value, previously specified as maximum deviation. © 2011, Advanced Engineering Solutions.
Resumo:
This paper proposes a methodology to increase the probability of delivering power to any load point through the identification of new investments. The methodology uses a fuzzy set approach to model the uncertainty of outage parameters, load and generation. A DC fuzzy multicriteria optimization model considering the Pareto front and based on mixed integer non-linear optimization programming is developed in order to identify the adequate investments in distribution networks components which allow increasing the probability of delivering power to all customers in the distribution network at the minimum possible cost for the system operator, while minimizing the non supplied energy cost. To illustrate the application of the proposed methodology, the paper includes a case study which considers an 33 bus distribution network.
Resumo:
A methodology to increase the probability of delivering power to any load point through the identification of new investments in distribution network components is proposed in this paper. The method minimizes the investment cost as well as the cost of energy not supplied in the network. A DC optimization model based on mixed integer non-linear programming is developed considering the Pareto front technique in order to identify the adequate investments in distribution networks components which allow increasing the probability of delivering power for any customer in the distribution system at the minimum possible cost for the system operator, while minimizing the energy not supplied cost. Thus, a multi-objective problem is formulated. To illustrate the application of the proposed methodology, the paper includes a case study which considers a 180 bus distribution network
Resumo:
The high penetration of distributed energy resources (DER) in distribution networks and the competitiveenvironment of electricity markets impose the use of new approaches in several domains. The networkcost allocation, traditionally used in transmission networks, should be adapted and used in the distribu-tion networks considering the specifications of the connected resources. The main goal is to develop afairer methodology trying to distribute the distribution network use costs to all players which are usingthe network in each period. In this paper, a model considering different type of costs (fixed, losses, andcongestion costs) is proposed comprising the use of a large set of DER, namely distributed generation(DG), demand response (DR) of direct load control type, energy storage systems (ESS), and electric vehi-cles with capability of discharging energy to the network, which is known as vehicle-to-grid (V2G). Theproposed model includes three distinct phases of operation. The first phase of the model consists in aneconomic dispatch based on an AC optimal power flow (AC-OPF); in the second phase Kirschen’s andBialek’s tracing algorithms are used and compared to evaluate the impact of each resource in the net-work. Finally, the MW-mile method is used in the third phase of the proposed model. A distributionnetwork of 33 buses with large penetration of DER is used to illustrate the application of the proposedmodel.
Resumo:
The use of distribution networks in the current scenario of high penetration of Distributed Generation (DG) is a problem of great importance. In the competitive environment of electricity markets and smart grids, Demand Response (DR) is also gaining notable impact with several benefits for the whole system. The work presented in this paper comprises a methodology able to define the cost allocation in distribution networks considering large integration of DG and DR resources. The proposed methodology is divided into three phases and it is based on an AC Optimal Power Flow (OPF) including the determination of topological distribution factors, and consequent application of the MW-mile method. The application of the proposed tariffs definition methodology is illustrated in a distribution network with 33 buses, 66 DG units, and 32 consumers with DR capacity.
Resumo:
Em Angola, apenas cerca de 30% da população tem acesso à energia elétrica, nível que decresce para valores inferiores a 10% em zonas rurais mais remotas. Este problema é agravado pelo facto de, na maioria dos casos, as infraestruturas existentes se encontrarem danificadas ou não acompanharem o desenvolvimento da região. Em particular na capital angolana, Luanda que, sendo a menor província de Angola, é a que regista atualmente a maior densidade populacional. Com uma população de cerca de 5 milhões de habitantes, não só há frequentemente problemas relacionados com a falha do fornecimento de energia elétrica como há ainda uma percentagem considerável de municípios onde a rede elétrica ainda nem sequer chegou. O governo de Angola, no seu esforço de crescimento e aproveitamento das suas enormes potencialidades, definiu o setor energético como um dos fatores críticos para o desenvolvimento sustentável do país, tendo assumido que este é um dos eixos prioritários até 2016. Existem objetivos claros quanto à reabilitação e expansão das infraestruturas do setor elétrico, aumentando a capacidade instalada do país e criando uma rede nacional adequada, com o intuito não só de melhorar a qualidade e fiabilidade da rede já existente como de a aumentar. Este trabalho de dissertação consistiu no levantamento de dados reais relativamente à rede de distribuição de energia elétrica de Luanda, na análise e planeamento do que é mais premente fazer relativamente à sua expansão, na escolha dos locais onde é viável localizar novas subestações, na modelação adequada do problema real e na proposta de uma solução ótima para a expansão da rede existente. Depois de analisados diferentes modelos matemáticos aplicados ao problema de expansão de redes de distribuição de energia elétrica encontrados na literatura, optou-se por um modelo de programação linear inteira mista (PLIM) que se mostrou adequado. Desenvolvido o modelo do problema, o mesmo foi resolvido por recurso a software de otimização Analytic Solver e CPLEX. Como forma de validação dos resultados obtidos, foi implementada a solução de rede no simulador PowerWorld 8.0 OPF, software este que permite a simulação da operação do sistema de trânsito de potências.
Resumo:
O planeamento de redes de distribuição tem como objetivo assegurar a existência de capacidade nas redes para a fornecimento de energia elétrica com bons níveis de qualidade de serviço tendo em conta os fatores económicos associados. No âmbito do trabalho apresentado na presente dissertação, foi elaborado um modelo de planeamento que determina a configuração de rede resultante da minimização de custos associados a: 1) perdas por efeito de joule; 2) investimento em novos componentes; 3) energia não entregue. A incerteza associada ao valor do consumo de cada carga é modelada através de lógica difusa. O problema de otimização definido é resolvido pelo método de decomposição de benders que contempla dois trânsitos de potências ótimos (modelo DC e modelo AC) no problema mestre e escravo respectivamente para validação de restrições. Foram também definidos critérios de paragem do método de decomposição de benders. O modelo proposto classifica-se como programação não linear inteira mista e foi implementado na ferramenta de otimização General Algebraic Modeling System (GAMS). O modelo desenvolvido tem em conta todos componentes das redes para a otimização do planeamento, conforme podemos analisar nos casos de estudo implementados. Cada caso de estudo é definido pela variação da importância que cada uma das variáveis do problema toma, tendo em vista cobrir de alguma todos os cenários de operação expetáveis. Através destes casos de estudo verifica-se as várias configurações que a rede pode tomar, tendo em conta as importâncias atribuídas a cada uma das variáveis, bem como os respetivos custos associados a cada solução. Este trabalho oferece um considerável contributo no âmbito do planeamento de redes de distribuição, pois comporta diferentes variáveis para a execução do mesmo. É também um modelo bastante robusto não perdendo o ‘norte’ no encontro de solução para redes de grande dimensão, com maior número de componentes.
Resumo:
No âmbito do desenvolvimento da dissertação do Mestrado de Engenharia Eletrotécnica – Sistemas Elétricos de Energia, surgiu a oportunidade de participar no desenvolvimento de um projeto integrante numa subestação de energia. O presente caso de estudo tem em vista a resolução de condicionantes na conceção desta subestação, tais como cumprir requisitos estéticos projetando todo o tipo de equipamentos dentro de edifícios, a ventilação das salas de transformação assim como insonorização de todo o ruído produzido de forma a cumprir os limites legais e não perturbar a vizinhança. A presente subestação de energia está situada numa zona urbana da cidade de Leiria, localidade de Parceiros, dando origem ao nome Subestação de Energia de Parceiros. Esta subestação pertence ao cliente Energias de Portugal, conhecida como EDP, e visa o melhoramento da distribuição do serviço eléctrico. As tradicionais subestações de energia, com aparência bastante desenquadrada dos meios urbanos, representam um entrave ao nível da aproximação destes centros de produção energética às zonas urbanas, comprometendo a melhoria da rede elétrica. Desta forma, foi implementada a tecnologia Gas-Insolated Switchgear e permite o enquadramento destes centros energéticos em zonas urbanas, constituindo mais um edifício urbano na zona onde se insere. Esta substitui os convencionais barramentos existentes nos Parques Exteriores de Aparelhagem das subestações e apresenta-se com dimensões muito reduzidas quando comparadas com as estruturas instaladas nestes parques. Dado que esta tecnologia é desenvolvida no sentido de permitir a construção destes centros energéticos em zonas urbanas, podem ser alojadas dentro de edifícios produzindo assim vantagens ao nível estético, não perturbando a paisagem. Dado que os principais equipamentos de funcionamento na subestação de Parceiros, nomeadamente o Transformador de Potência, se encontram instalados num edifício completamente fechado, foram construídas duas salas de ventilação, na parte superior deste edifício, cada uma adjacente a uma sala de transformação. O transformador instalado possui elevadas dimensões, pesando 53000 kg e contendo 11000 kg de óleo que em estado normal de funcionamento circula por quase todo o interior da máquina a elevadas temperaturas, provocando um aquecimento elevado no interior do edifício o que condiciona o bom funcionamento do transformador. Para ultrapassar esta condicionante foi realizado um estudo de um sistema de ventilação capaz de avaliar e controlar os valores térmicos existentes e proceder à circulação de ar, que será movimentado ou bloqueado, recorrendo a um sistema autónomo, mantendo a temperatura ideal nas salas de transformação. Este autómato é o cérebro de toda a cadeia lógica que, mediante as leituras efetuadas irá dar ordens de atuação aos diversos equipamentos. Apesar dos TP estarem protegidos dentro do edifício, estes produzem um maior ruído. A necessidade da existência do referido sistema de ventilação das divisões de funcionamento destas máquinas, implica a utilização de aparelhos que, apesar da sua evolução tecnológica os torna cada vez menos ruidosos, mas geram sempre alguma perturbação, o que pode representar um problema no cumprimento do regulamento geral do ruído.
Resumo:
A turvação é uma das principais preocupações das empresas de rede de distribuição de água potável. Para se saber a sua origem existem diversos mecanismos, sugeridos em bibliografia, que explicam a formação de depósitos de partículas nas tubagens, que se acumulam em camadas sobrepostas, criando entre si forças de coesão. A turvação pode surgir se o caudal ou a velocidade na tubagem aumentar, por alguma razão, pois um aumento da tensão de corte sobre o depósito, pode superar as forças de coesão levando à sua ressuspensão. Esta explicação é traduzida matematicamente pelo modelo PODDS (Prediction of Discolouration in Drinking Water Distribtuion System). O modelo PODDS foi compilado em EPANET recentemente por uma equipa de investigadores da Universidade de Sheffield e foi utilizado para fazer o estudo num ramal da empresa AdDP - Águas do Douro e Paiva, SA. Os resultados das simulações permitirão prever o caudal mínimo teórico a utilizar no ramal que origina o valor limite de turvação. Foram realizados ensaios de variação do caudal no ramal de Jovim-Ramalde para a calibração do modelo. Os parâmetros obtidos foram: Cmáx igual a 100 NTUm, b e n igual a 1, k é igual -1 NTUm3/N, e por fim, P igual a 0,0001 NTUm3/N.s. Após calibração do modelo realizaram-se simulações com atualização das forças de coesão para conhecer o caudal que provocaria a mobilização das partículas até uma turvação de 4 NTU e concluiu-se que o valor seria de 4,32 m3/s. O tempo necessário para regressar a valores inferiores a 1 NTU também foi determinado e 4 horas e 8 minutos foi o valor alcançado. Por fim realizou-se um estudo da influência da temperatura neste modelo e o resultado mostrou que este parâmetro é pouco influente para a gama de temperaturas considerada.
Resumo:
Accepted in 13th IEEE Symposium on Embedded Systems for Real-Time Multimedia (ESTIMedia 2015), Amsterdam, Netherlands.