39 resultados para roof-top wind turbines
Resumo:
The integration of growing amounts of distributed generation in power systems, namely at distribution networks level, has been fostered by energy policies in several countries around the world, including in Europe. This intensive integration of distributed, non-dispatchable, and natural sources based generation (including wind power) has caused several changes in the operation and planning of power systems and of electricity markets. Sometimes the available non-dispatchable generation is higher than the demand. This generation must be used; otherwise it is wasted if not stored or used to supply additional demand. New policies and market rules, as well as new players, are needed in order to competitively integrate all the resources. The methodology proposed in this paper aims at the maximization of the social welfare in a distribution network operated by a virtual power player that aggregates and manages the available energy resources. When facing a situation of excessive non-dispatchable generation, including wind power, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. This method is especially useful when actual and day-ahead resources forecast differ significantly. The distribution network characteristics and concerns are addressed by including the network constraints in the optimization model. The proposed methodology has been implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20.310 consumers and 548 distributed generators, some of them non-dispatchable and with must take contracts. The implemented scenario corresponds to a real day in Portuguese power system.
Resumo:
The use of renewables have been increased I several countries around the world, namely in Europe. The wind power is generally the larger renewable resource with very specific characteristics in what concerns its variability and the inherent impacts in the power systems and electricity markets operation. This paper focuses on the Portuguese context of renewables use, including wind power. The work here presented includes the use of a real time pricing methodology developed by the authors aiming the reduction of electricity consumption in the moments of unexpected low wind power. A more specific example of application of real time pricing is demonstrated for the minimization of the operation costs in a distribution network. When facing lower wind power generation than expected from day ahead forecast, demand response is used in order to minimize the impacts of such wind availability change. In this way, consumers actively participate in regulation up and spinning reserve ancillary services through demand response programs.
Resumo:
The use of Electric Vehicles (EVs) will change significantly the planning and management of power systems in a near future. This paper proposes a real-time tariff strategy for the charge process of the EVs. The main objective is to evaluate the influence of real-time tariffs in the EVs owners’ behaviour and also the impact in load diagram. The paper proposes the energy price variation according to the relation between wind generation and power consumption. The proposed strategy was tested in two different days in the Danish power system. January 31st and August 13th 2013 were selected because of the high quantities of wind generation. The main goal is to evaluate the changes in the EVs charging diagram with the energy price preventing wind curtailment.
Resumo:
Recent changes of paradigm in power systems opened the opportunity to the active participation of new players. The small and medium players gain new opportunities while participating in demand response programs. This paper explores the optimal resources scheduling in two distinct levels. First, the network operator facing large wind power variations makes use of real time pricing to induce consumers to meet wind power variations. Then, at the consumer level, each load is managed according to the consumer preferences. The two-level resources schedule has been implemented in a real-time simulation platform, which uses hardware for consumer’ loads control. The illustrative example includes a situation of large lack of wind power and focuses on a consumer with 18 loads.
Resumo:
Wind speed forecasting has been becoming an important field of research to support the electricity industry mainly due to the increasing use of distributed energy sources, largely based on renewable sources. This type of electricity generation is highly dependent on the weather conditions variability, particularly the variability of the wind speed. Therefore, accurate wind power forecasting models are required to the operation and planning of wind plants and power systems. A Support Vector Machines (SVM) model for short-term wind speed is proposed and its performance is evaluated and compared with several artificial neural network (ANN) based approaches. A case study based on a real database regarding 3 years for predicting wind speed at 5 minutes intervals is presented.
Resumo:
Aim of the paper: The purpose of this paper is to examine human resources management practices (HRM practices) in small firms and to improve the understanding of the relationship between this kind of practices and business growth. This exploratory study is based on the resource-based view of the firm and empirical work carried out in two small firms by relating HRM practices with the firms’ results. Contribution to the literature: This is an in-depth study of HRM practices and its impact on performance growth in micro firms, isolating and controlling for most of the contextual and internal variables considered in the literature that relate HRM to growth. Firm growth analysis was broadened by the use of several dependent variables: employment growth and operational and financial performance growth. Some hypotheses for further research in identifying HRM practices in small business and its relation with firm growth are suggested. Methodology: Case study methodology was used to study two firms. The techniques used to collect data were semi-structured interviews to the owner and all the employees, unstructured observation at the firms’ facilities (during two days), entrepreneur profile definition (survey answer) and document data collection (on demographic characterization and performance results). Data was analyzed through content analysis methodology, and categories derived from the interviews’ protocols and literature. Results and implications: Results revealed that despite the firms’ organizational characteristics similarities, they differ significantly in owners’ motivation to grow, HRM practices and organizational performance and growth. Future studies should pay special attention to owner willingness to grow, to firms’ years of experience in business, to staff’s years of experience in their field of work and turnover. HRM practices in micro/small firms should be better defined and characterized. The external image of management posture relating to longitudinal financial results and growth should also be explored.
Resumo:
O presente relatório versa sobre a análise e dimensionamento de estruturas de aço enformadas a frio. Devido a serem estruturas de elevada esbelteza, frequentemente denominadas “estruturas de aço leve”, apresentam fenómenos de instabilidade tanto a nível local como global, sendo da perspetiva regulamentar abrangidas pelo Eurocódigo 3, nomeadamente pelas Partes 1-1, 1-3 e 1-5. A Parte 1-3 do Eurocódigo 3 diz respeito às regras suplementares de elementos de aço enformados a frio, na qual estão presentes as regras de dimensionamento, bem como as verificações de segurança que deverão ser aplicadas. Nesta, é possível ainda “fazer a ponte” com a Parte 1-1 do Eurocódigo 3, respetiva às regras gerais de projeto de estruturas de aço e com a Parte 1-5 do Eurocódigo 3 relativa a elementos estruturais constituídos por placas. Inicialmente, será realizado um estado da arte, onde será efetuado um enquadramento histórico, apresentando o processo de fabrico destes elementos e o tipo de elementos estruturais originados, concluindo-se com as vantagens/desvantagens dos perfis em aço enformados a frio. Os conceitos teóricos de estabilidade estrutural, os tipos de instabilidade mais comuns nestes elementos, bem como os tipos de análise destes fenómenos farão a ponte com o capítulo que se segue. Relativamente ao dimensionamento destes elementos, será dado enfâse às metodologias preconizadas pelo Eurocódigo 3, Parte 1-3. Este capítulo incidirá, entre outos, nas propriedades das secções transversais, na determinação da resistência destas, onde se contabilizará os efeitos das instabilidades locais de placa e distorcionais, na instabilidade global dos perfis e nas ligações entre os mesmos. Será analisada, posteriormente, a abordagem apresentada pela ECCS relativamente ao dimensionamento de madres travadas por painéis de cobertura. Neste capítulo será apresentada a metodologia para o dimensionamento de vigas com restrição à torção e à translação, bem como a resistência da secção transversal da madre e do seu banzo livre à encurvadura. Finalmente, e ao encontro do que foi proposto pela empresa CCAD-Serviços de Engenharia, Lda, efetuar-se-á o dimensionamento de uma cobertura de um edifício de distribuição, cobertura esta constituída por asnas treliçadas e madres simples. Neste dimensionamento foram consideradas as ações segundo o Regulamento de Segurança e Ações Para Estruturas de Edifícios e Pontes e o Eurocódigo 1, Parte 1-1 que diz respeito às Ações Gerais em Estruturas e Parte 1-4 respeitante às Ações do vento.
Resumo:
The objective of the thesis is to analyze the behaviour of the wind flow when it is passing beside the forest. To complete this analysis, a parametric study was done based upon generalized situations. Some abacus have been made, which are related to forest and wind characteristics. The abacus were compared with a particular real case, namely Alexandrovo (Bulgaria), where it was concluded that the applicability of the abacus in projects with complex terrain is low and they must be used, from a quantitative point of view, for flat terrain, being hc the most important parameter.
Resumo:
The integration of wind power in eletricity generation brings new challenges to unit commitment due to the random nature of wind speed. For this particular optimisation problem, wind uncertainty has been handled in practice by means of conservative stochastic scenario-based optimisation models, or through additional operating reserve settings. However, generation companies may have different attitudes towards operating costs, load curtailment, or waste of wind energy, when considering the risk caused by wind power variability. Therefore, alternative and possibly more adequate approaches should be explored. This work is divided in two main parts. Firstly we survey the main formulations presented in the literature for the integration of wind power in the unit commitment problem (UCP) and present an alternative model for the wind-thermal unit commitment. We make use of the utility theory concepts to develop a multi-criteria stochastic model. The objectives considered are the minimisation of costs, load curtailment and waste of wind energy. Those are represented by individual utility functions and aggregated in a single additive utility function. This last function is adequately linearised leading to a mixed-integer linear program (MILP) model that can be tackled by general-purpose solvers in order to find the most preferred solution. In the second part we discuss the integration of pumped-storage hydro (PSH) units in the UCP with large wind penetration. Those units can provide extra flexibility by using wind energy to pump and store water in the form of potential energy that can be generated after during peak load periods. PSH units are added to the first model, yielding a MILP model with wind-hydro-thermal coordination. Results showed that the proposed methodology is able to reflect the risk profiles of decision makers for both models. By including PSH units, the results are significantly improved.