46 resultados para Inter-level transitions
Resumo:
A QoS adaptation to dynamically changing system conditions that takes into consideration the user’s constraints on the stability of service provisioning is presented. The goal is to allow the system to make QoS adaptation decisions in response to fluctuations in task traffic flow, under the control of the user. We pay special attention to the case where monitoring the stability period and resource load variation of Service Level Agreements for different types of services is used to dynamically adapt future stability periods, according to a feedback control scheme. System’s adaptation behaviour can be configured according to a desired confidence level on future resource usage. The viability of the proposed approach is validated by preliminary experiments.
Resumo:
The goal of this paper is to discuss the benefits and challenges of yielding an inter-continental network of remote laboratories supported and used by both European and Latin American Institutions of Higher Education. Since remote experimentation, understood as the ability to carry out real-world experiments through a simple Web browser, is already a proven solution for the educational community as a supplement to on-site practical lab work (and in some cases, namely for distance learning courses, a replacement to that work), the purpose is not to discuss its technical, pedagogical, or economical strengths, but rather to raise and try to answer some questions about the underlying benefits and challenges of establishing a peer-to-peer network of remote labs. Ultimately, we regard such a network as a constructive mechanism to help students gain the working and social skills often valued by multinational/global companies, while also providing awareness of local cultural aspects.
Resumo:
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.
Resumo:
Prototype validation is a major concern in modern electronic product design and development. Simulation, structural test, functional and timing debug are all forming parts of the validation process, although very often addressed as dissociated tasks. In this paper we describe an integrated approach to board-level prototype validation, based on a set of mandatory/optional BST instructions and a built-in controller for debug and test, that addresses the late mentioned tasks as inherent parts of a whole process
Resumo:
The advantages of networking are widely known in many areas (from business to personal ones). One particular area where networks have also proved their benefits is education. Taking the secondary school education level into account, some successful cases can be found in literature. In this paper we describe a particular remote lab network supporting physical experiments accessible to students of institutions geographically separated. The network architecture and application examples of using some of the available remote experiments are illustrated in detail.
Resumo:
Para uma melhor avaliação e definição do plano de intervenção do indivíduo, é cada vez mais importante a existência instrumentos de avaliação válidos e fiáveis para a população portuguesa. Objetivo: Traduzir e adaptar para a população Portuguesa a escala Trunk Impairment Scale (TIS) em pacientes pós-AVE, e avaliar as propriedades psicométricas da mesma. Metodologia: A TIS foi traduzida para o Português e adaptada culturalmente para a população portuguesa. As propriedades psicométricas da mesma, incluindo validade, fiabilidade, concordância inter-observadores, consistência interna, sensibilidade, especificidade, poder de resposta, foram avaliadas numa população diagnosticada com AVE e num grupo de controlo de participantes saudáveis. Participaram neste estudo 80 indivíduos, divididos em dois grupos, nomeadamente indivíduos pós-AVE (40) e um grupo sem patologia (40). Os participantes foram submetidos à aplicação das escalas de Berg, Medida de Independência Funcional e Escala de Desempenho Físico Fugl Meyer e a TIS de modo a avaliar as propriedades psicométricas desta. As avaliações foram realizadas por duas fisioterapeutas experientes e o re-teste foi realizado após 48 horas. Os dados foram registados e trabalhados com o programa informático SPSS 21.0. Resultados: Relativamente aos valores obtidos, verificou-se que, quanto à consistência interna da TIS estes apresentam-se de forma moderada a elevada (alfa Cronbach = 0,909). Quanto à fiabilidade inter-observadores, os itens com menor valor são os itens 1 e 4 (0,759 e 0,527, respetivamente) e os itens com valor de Kappa mais alto são os itens 5 e 6 (0,830 e 0,893, respetivamente). Relativamente à validade de critério, verificou-se que não houve correlação entre a escala de Desempenho Físico Fugl-Meyer, a escala de Equilibrio de Berg e a Medida de Independência Funcional, ou seja, os valores obtidos r=0,166; r=0,017; r= -0,002, respetivamente. Quanto à validade de construção, constatou-se que o valor da mediana é mais elevado nos itens 1 a 5, logo sugere que haja diferenças entre o grupo de indivíduos pós-AVE e o grupo de indivíduos saudáveis (p<0,001). Entre os outros dois itens (6 e 7) não foram encontradas diferenças nas respostas nos dois grupos, sendo o valor de p > 0,001. Conclusão: Os resultados obtidos neste estudo sugerem que a versão portuguesa da TIS apresenta bons níveis de fiabilidade, consistência interna e também apresenta bons resultados no que refere à concordância inter-observadores.
Resumo:
This paper analyzes Knowledge Management (KM) as a political activity, made by the great political leaders of the world. We try to inspect if at the macro political level KM is made, and how. The research is interesting because given that we live in a Knowledge society, in the Information Era, it is more or less obvious that the political leaders should also do KM. However we don’t know of any previous study on KM and world leaders and this paper wants to be a first step to fill that gap. As a methodology we use literature review: given this one is a first preliminary study we use data we found in the Internet and other databases like EBSCO. We divide the analysis in two main parts: theoretical ideas first, and an application second. The second part is it self divided in two segments: the past and the present times. We find that rather not surprisingly, KM always was and is pervasive in the activity of the world leaders, and has become more and more diverse has power itself became to be more and more disseminated in the world. The study has the limitation of relying on insights and texts and not on interviews. But we believe it is very interesting to make this kind of analysis and such studies may help improving the democracies in the world.
Resumo:
Relatório de Estágio apresentado ao Instituto Politécnico do Porto para obtenção do Grau de Mestre em Logística Orientadores do Instituto: Professor Doutor Luís Barreto e Mestre Jonas Lima Orientador da empresa: Engenheiro Vítor Carvalho
Resumo:
Relatório de Estágio Apresentado ao Instituto de Contabilidade e Administração do Porto para a obtenção do grau de Mestre em Empreendedorismo e Internacionalização, sob orientação da Mestre Inês Veiga Pereira
Resumo:
The current practices in the consumption metering by electricity utilities is currently largely based on monthly consumption reading. The consumption metering device is always calculating the cumulative consumption. Then, it is possible to calculate the difference between the actual and the previous consumption evaluation in order to estimate the monthly consumption. The power systems planning needs in many aspects to handle consumption data obtained for shorter periods, namely in the Demand Response programs planning. The work presented in this paper is based on the application of typical consumption profiles that are previously defined for a certain power system area. Such profiles are then used in order to estimate the 15 minutes consumption for a certain consumer or consumer type.
Risk Acceptance in the Furniture Sector: Analysis of Acceptance Level and Relevant Influence Factors
Resumo:
Risk acceptance has been broadly discussed in relation to hazardous risk activities and/or technologies. A better understanding of risk acceptance in occupational settings is also important; however, studies on this topic are scarce. It seems important to understand the level of risk that stakeholders consider sufficiently low, how stakeholders form their opinion about risk, and why they adopt a certain attitude toward risk. Accordingly, the aim of this study is to examine risk acceptance in regard to occupational accidents in furniture industries. The safety climate analysis was conducted through the application of the Safety Climate in Wood Industries questionnaire. Judgments about risk acceptance, trust, risk perception, benefit perception, emotions, and moral values were measured. Several models were tested to explain occupational risk acceptance. The results showed that the level of risk acceptance decreased as the risk level increased. High-risk and death scenarios were assessed as unacceptable. Risk perception, emotions, and trust had an important influence on risk acceptance. Safety climate was correlated with risk acceptance and other variables that influence risk acceptance. These results are important for the risk assessment process in terms of defining risk acceptance criteria and strategies to reduce risks.
Resumo:
An ever increasing need for extra functionality in a single embedded system demands for extra Input/Output (I/O) devices, which are usually connected externally and are expensive in terms of energy consumption. To reduce their energy consumption, these devices are equipped with power saving mechanisms. While I/O device scheduling for real-time (RT) systems with such power saving features has been studied in the past, the use of energy resources by these scheduling algorithms may be improved. Technology enhancements in the semiconductor industry have allowed the hardware vendors to reduce the device transition and energy overheads. The decrease in overhead of sleep transitions has opened new opportunities to further reduce the device energy consumption. In this research effort, we propose an intra-task device scheduling algorithm for real-time systems that wakes up a device on demand and reduces its active time while ensuring system schedulability. This intra-task device scheduling algorithm is extended for devices with multiple sleep states to further minimise the overall device energy consumption of the system. The proposed algorithms have less complexity when compared to the conservative inter-task device scheduling algorithms. The system model used relaxes some of the assumptions commonly made in the state-of-the-art that restrict their practical relevance. Apart from the aforementioned advantages, the proposed algorithms are shown to demonstrate the substantial energy savings.
Resumo:
A vitamin E extraction method for rainbow trout flesh was optimized, validated, and applied in fish fed commercial and Gracilaria vermiculophylla-supplemented diets. Five extraction methods were compared. Vitamers were analyzed by HPLC/DAD/fluorescence. A solid-liquid extraction with n-hexane, which showed the best performance, was optimized and validated. Among the eight vitamers, only α- and γ-tocopherol were detected in muscle samples. The final method showed good linearity (>0.999), intra- (<3.1%) and inter-day precision (<2.6%), and recoveries (>96%). Detection and quantification limits were 39.9 and 121.0 ng/g of muscle, for α-tocopherol, and 111.4 ng/g and 337.6 ng/g, for γ-tocopherol, respectively. Compared to the control group, the dietary inclusion of 5% G. vermiculophylla resulted in a slight reduction of lipids in muscle and, consequently, of α- and γ-tocopherol. Nevertheless, vitamin E profile in lipids was maintained. In general, the results may be explained by the lower vitamin E level in seaweed-containing diet. Practical Applications: Based on the validation results and the low solvent consumption, the developed method can be used to analyze vitamin E in rainbow trout. The results of this work are also a valuable information source for fish feed industries and aquaculture producers, which can focus on improving seaweed inclusion in feeds as a source of vitamin E in fish muscle and, therefore, take full advantage of all bioactive components with an important role in fish health and flesh quality.
Resumo:
In the traditional paradigm, the large power plants supply the reactive power required at a transmission level and the capacitors and transformer tap changer were also used at a distribution level. However, in a near future will be necessary to schedule both active and reactive power at a distribution level, due to the high number of resources connected in distribution levels. This paper proposes a new multi-objective methodology to deal with the optimal resource scheduling considering the distributed generation, electric vehicles and capacitor banks for the joint active and reactive power scheduling. The proposed methodology considers the minimization of the cost (economic perspective) of all distributed resources, and the minimization of the voltage magnitude difference (technical perspective) in all buses. The Pareto front is determined and a fuzzy-based mechanism is applied to present the best compromise solution. The proposed methodology has been tested in the 33-bus distribution network. The case study shows the results of three different scenarios for the economic, technical, and multi-objective perspectives, and the results demonstrated the importance of incorporating the reactive scheduling in the distribution network using the multi-objective perspective to obtain the best compromise solution for the economic and technical perspectives.