40 resultados para PROGRAMME IMPLEMENTATION


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Consider the problem of scheduling sporadic message transmission requests with deadlines. For wired channels, this has been achieved successfully using the CAN bus. For wireless channels, researchers have recently proposed a similar solution; a collision-free medium access control (MAC) protocol that implements static-priority scheduling. Unfortunately no implementation has been reported, yet. We implement and evaluate it to find that the implementation indeed is collision-free and prioritized. This allows us to develop schedulability analysis for the implementation. We measure the response times of messages in our implementation and find that our new response-time analysis indeed offers an upper bound on the response times. This enables a new class of wireless real-time systems with timeliness guarantees for sporadic messages and it opens-up a new research area: schedulability analysis for wireless networks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This technical report is to provide a reference guide to the implementation of the IEEE 802.15.4 protocol in nesC/TinyOS for the MICAz motes. The implementation is provided as a tool that can be used to implement, test and evaluate the current functionalities defined in the protocol standard as well as to enable the development of functionalities not yet implemented and new add-ons to the protocol.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This technical report describes the implementation details of the Implicit GTS Allocation Mechanism (i-GAME), for the IEEE 802.15.4 protocol. The i-GAME was implemented in nesC/TinyOS for the CrossBow MICAz mote, over our own implementation of the IEEE 802.15.4 protocol stack. This document provides the implementation details, including a description of the i-GAME software interfaces.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Several phenomena present in electrical systems motivated the development of comprehensive models based on the theory of fractional calculus (FC). Bearing these ideas in mind, in this work are applied the FC concepts to define, and to evaluate, the electrical potential of fractional order, based in a genetic algorithm optimization scheme. The feasibility and the convergence of the proposed method are evaluated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent trends show an increasing number of weblabs, implemented at universities and schools, supporting practical training in technical courses and providing the ability to remotely conduct experiments. However, their implementation is typically based on individual architectures, unable of being reconfigured with different instruments/modules usually required by every experiment. In this paper, we discuss practical guidelines for implementing reconfigurable weblabs that support both local and remote control interfaces. The underlying infrastructure is based on reconfigurable, low-cost, FPGA-based boards supporting several peripherals that are used for the local interface. The remote interface is powered by a module capable of communicating with an Ethernet based network and that can either correspond to an internal core of the FPGA or an external device. These two approaches are discussed in the paper, followed by a practical implementation example.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although the Navigation Satellite Timing and Ranging (NAVSTAR) Global Positioning System (GPS) is, de facto, the standard positioning system used in outdoor navigation, it does not provide, per se, all the features required to perform many outdoor navigational tasks. The accuracy of the GPS measurements is the most critical issue. The quest for higher position readings accuracy led to the development, in the late nineties, of the Differential Global Positioning System (DGPS). The differential GPS method detects the range errors of the GPS satellites received and broadcasts them. The DGPS/GPS receivers correlate the DGPS data with the GPS satellite data they are receiving, granting users increased accuracy. DGPS data is broadcasted using terrestrial radio beacons, satellites and, more recently, the Internet. Our goal is to have access, within the ISEP campus, to DGPS correction data. To achieve this objective we designed and implemented a distributed system composed of two main modules which are interconnected: a distributed application responsible for the establishment of the data link over the Internet between the remote DGPS stations and the campus, and the campus-wide DGPS data server application. The DGPS data Internet link is provided by a two-tier client/server distributed application where the server-side is connected to the DGPS station and the client-side is located at the campus. The second unit, the campus DGPS data server application, diffuses DGPS data received at the campus via the Intranet and via a wireless data link. The wireless broadcast is intended for DGPS/GPS portable receivers equipped with an air interface and the Intranet link is provided for DGPS/GPS receivers with just a RS232 DGPS data interface. While the DGPS data Internet link servers receive the DGPS data from the DGPS base stations and forward it to the DGPS data Internet link client, the DGPS data Internet link client outputs the received DGPS data to the campus DGPS data server application. The distributed system is expected to provide adequate support for accurate (sub-metric) outdoor campus navigation tasks. This paper describes in detail the overall distributed application.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Current engineering education challenges require approaches that promote scientific, technical, design and complementary skills while fostering autonomy, innovation and responsibility. The European Project Semester (EPS) at Instituto Superior de Engenharia do Porto (ISEP) (EPS@ISEP) is a one semester project-based learning programme (30 European Credit Transfer Units (ECTU)) for engineering students from diverse scientific backgrounds and nationalities that intends to address these goals. The students, organised in multidisciplinary and multicultural teams, are challenged to solve real multidisciplinary problems during one semester. The EPS package, although on project development (20 ECTU), includes a series of complementary seminars aimed at fostering soft, project-related and engineering transversal skills (10 ECTU). Hence, the students enrolled in this programme improve their transversal skills and learn, together and with the team of supervisors, subjects distinct from their core training. This paper presents the structure, implementation and results of the EPS@ISEP that was created in 2011 to apply the best engineering practices and promote internationalisation and engineering education innovation at ISEP.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Artigo elaborador no âmbito dos trabalhos decorrentes à dissertação de Mestrado do Aluno David Leite, no Mestrado em Gestão Integrada Qualidade, Ambiente e Segurança, ESTGF-IPP, Oreintados pelos Professores Luís Fonseca (ISEP-IPP) e Vanda Lima (ESTGF-IPP).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper analyses the impact of the implementation of the Basel III recommendations, using the standard method, in Portugal. For our study, we used the annual reports of 31st of December of 2012, and found out that out of the fourteen banks that published annual reports, only six satisfied the minimum ratios laid out by BCBS. Till 2012, Portuguese banks used an internal ratings method based on the Basel II recommendations known as notice 6/2010 of the Portuguese central bank, Banco de Portugal. As the implementation of the recommendations of Basel III in the EU via the Credit Review Directive IV is scheduled for 2014 and later years, Portuguese banks may severely contract credit upon implementation, as that is the easiest, fastest and cheapest way for banks to satisfy the minimum ratio requirements as compared to an increase of capital or credit spreads.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Lean Thinking is an important pillar in the success of any program of continuous improvement process. Its tools are useful means in the analysis, control and organization of important data for correct decision making in organizations. This project had as main objective the design of a program of quality improvement in Eurico Ferreira, S.A., based on the evaluation of customer satisfaction and the implementation of 5S. Subsequently, we have selected which business area of the company to address. After the selection, there was an initial diagnostic procedure, identifying the various points of improvement to which some tools of Lean Thinking have been applied, in particular Value Stream Mapping and 5S methodology. With the first, we were able to map the current state of the process in which all stakeholders were represented as well as the flow of materials and information throughout the process. The 5S methodology allowed to act on the wastage, identifying and implementing various process improvements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Demand response is assumed as an essential resource to fully achieve the smart grids operating benefits, namely in the context of competitive markets and of the increasing use of renewable-based energy sources. Some advantages of Demand Response (DR) programs and of smart grids can only be achieved through the implementation of Real Time Pricing (RTP). The integration of the expected increasing amounts of distributed energy resources, as well as new players, requires new approaches for the changing operation of power systems. The methodology proposed in this paper aims the minimization of the operation costs in a distribution network operated by a virtual power player that manages the available energy resources focusing on hour ahead re-scheduling. When facing lower wind power generation than expected from day ahead forecast, demand response is used in order to minimize the impacts of such wind availability change. In this way, consumers actively participate in regulation up and spinning reserve ancillary services through demand response programs. Real time pricing is also applied. The proposed model is especially useful when actual and day ahead wind forecast differ significantly. Its application is illustrated in this paper implementing the characteristics of a real resources conditions scenario in a 33 bus distribution network with 32 consumers and 66 distributed generators.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A função da escola é promover a aprendizagem nos jovens e estimular o acesso ao conhecimento. A utilização das TI proporciona um acesso mais rápido ao conhecimento mas, sem os mecanismos necessários, pode originar perdas e comprometer a segurança da informação. A ausência de legislação e de regulamentação que ajude na manutenção da rede informática da escola, coloca-as numa posição muito vulnerável, obrigando-as a agir individualmente de modo a suprimir esta carência. A solução passa não só pela consciencialização dos utilizadores para a necessidade de segurança, mas também pela criação de mecanismos que permitam acrescentar segurança à rede e à própria informação. Os projetos desenvolvidos pelo programa Safer Internet e pela ISECOM atuam junto da comunidade escolar, sensibilizando os utilizadores para a necessidade de segurança na Internet e nas comunicações. Por sua vez, a adoção de práticas seguras é um processo mais demorado mas exequível através da implementação de uma política de segurança da informação adaptada à realidade da escola, de acordo com a norma ISO 27001. Da recolha de opinião aos intervenientes do sistema resultaram dois documentos com a política de segurança da informação, um direcionado às escolas e outro aos utilizadores. Crê-se que a adoção destas recomendações pelas escolas pode trazer benefícios ao nível da segurança da informação.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The European Union Emissions Trading Scheme (EU ETS) is a cornerstone of the European Union's policy to combat climate change and its key tool for reducing industrial greenhouse gas emissions cost-effectively. The purpose of the present work is to evaluate the influence of CO2 opportunity cost on the Spanish wholesale electricity price. Our sample includes all Phase II of the EU ETS and the first year of Phase III implementation, from January 2008 to December 2013. A vector error correction model (VECM) is applied to estimate not only long-run equilibrium relations, but also short-run interactions between the electricity price and the fuel (natural gas and coal) and carbon prices. The four commodities prices are modeled as joint endogenous variables with air temperature and renewable energy as exogenous variables. We found a long-run relationship (cointegration) between electricity price, carbon price, and fuel prices. By estimating the dynamic pass-through of carbon price into electricity price for different periods of our sample, it is possible to observe the weakening of the link between carbon and electricity prices as a result from the collapse on CO2 prices, therefore compromising the efficacy of the system to reach proposed environmental goals. This conclusion is in line with the need to shape new policies within the framework of the EU ETS that prevent excessive low prices for carbon over extended periods of time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The goal of this EPS@ISEP project proposed in the Spring of 2014 was to develop a flapping wing flying robot. The project was embraced by a multinational team composed of four students from different countries and fields of study. The team designed and implemented a robot inspired by a biplane design, constructed from lightweight materials and battery powered. The prototype, called MyBird, was built with a 250 € budget, reuse existing materials as well as low cost solutions. Although the team's initial idea was to build a light radio controlled robot, time limitations along with setbacks involving the required electrical components led to a light but not radio controlled prototype. The team, from the experience gathered, made a number of future improvement suggestions, namely, the addition of radio control and a camera and the adoption of articulated monoplane design instead of the current biplane design for the wings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes the development of biologically inspired robots as the capstone project of the European Project Semester (EPS) framework. EPS is a one semester student centred international programme offered by a group of European engineering schools (EPS Providers) as part of their student exchange programme portfolio. EPS is organized around a central module (the EPS project) and a set of complementary supportive modules. Project proposals refer to open multidisciplinary real world problems. Its purpose is to expose students to problems of a greater dimension and complexity than those faced throughout the degree programme as well as to put them in contact with the socalled real world, in opposition to the academic world. Students are organized in teams, grouping individuals from diverse academic backgrounds and nationalities, and each team is fully responsible for conducting its project. EPS provides an integrated framework for undertaking capstone projects, which is focused on multicultural and multidisciplinary teamwork, communication, problem-solving, creativity, leadership, entrepreneurship, ethical reasoning and global contextual analysis. The design and development of biologically inspired robots allows the students to fulfil the previously described requirements and objectives and, as a result, we recommend the adoption of these projects within the EPS project capstone module for the benefit of engineering students.