19 resultados para E-Manufacturing
Resumo:
Pultruded products are being targeted by a growing demand due to its excellent mechanical properties and low chemical reactivity, ensuring a low level of maintenance operations and allowing an easier assembly operation process than equivalent steel bars. In order to improve the mechanical drawing process and solve some acoustic and thermal insulation problems, pultruded pipes of glass fibre reinforced plastics (GFRF) can be filled with special products that increase their performance regarding the issues previously referred. The great challenge of this work was drawing a new equipment able to produce pultruded pipes filled with cork or polymeric pre-shaped bars as a continuous process. The project was carried out successfully and the new equipment was built and integrated in the pultrusion equipment already existing, allowing to obtain news products with higher added-value in the market, covering some needs previously identified in the field of civil construction.
Resumo:
In this study the potential eco-efficiency performance of a pultrusion manufacturing company was assessed. Indicators values and eco-efficiency ratios were estimated taking into account the implementation of new proceedings and procedures in the production process of glass fibre reinforced polymers (GFRP) pultrusion profiles. Two different approaches were foreseen: 1)Adoption of a new heating system for pultrusion die in the manufacturing process, more effective and with minor heat losses; and 2) Recycling approach, with partial waste reuse of scrap material derived from manufacturing, cutting and assembly processes of GFRP profiles. These features lead to significant improvements on the sequent assessed eco-efficiency ratios of the present case study, yielding to a more sustainable product and manufacturing process of pultruded GFRP profiles.
Resumo:
Risk assessment is one of the main pillars of the framework directive and other directives in respect of health and safety. It is also the basis of an effective management of safety and health as it is essential to reduce work-related accidents and occupational diseases. To survey the hazards eventually present in the workplaces the usual procedures are i) gathering information about tasks/activities, employees, equipment, legislation and standards; ii) observation of the tasks and; iii) quantification of respective risks through the most adequate risk assessment among the methodologies available. From this preliminary evaluation of a welding plant and, from the different measurable parameters, noise was considered the most critical. This paper focus not only the usual way of risk assessment for noise but also another approach that may allow us to identify the technique with which a weld is being performed.
Resumo:
Computerized scheduling methods and computerized scheduling systems according to exemplary embodiments. A computerized scheduling method may be stored in a memory and executed on one or more processors. The method may include defining a main multi-machine scheduling problem as a plurality of single machine scheduling problems; independently solving the plurality of single machine scheduling problems thereby calculating a plurality of near optimal single machine scheduling problem solutions; integrating the plurality of near optimal single machine scheduling problem solutions into a main multi-machine scheduling problem solution; and outputting the main multi-machine scheduling problem solution.