21 resultados para Economic Operational Principles

em Reposit


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the centuries there has been a growing trend of societies and it is possible to verify their economic growth. This growth has provided an increased pressure on natural resources, often over-reaching the boundaries of each country, which has called into question the level of environmental sustainability in different countries. Sustainability is understood as a complex concept involving ecological, social, economic dimensions and temporal urban processes. Therefore, Firmino (2009) suggests that the ecological footprint (EF) allows people to establish dependency relations between human activities and the natural resources required for such activities and for the absorption of waste generated. According to Bergh & Verbruggen (1999) the EF is an objective, impartial and one-dimensional indicator that enables people to assess the sustainability. The Superior Schools have a crucial role in building the vision of a sustainable future as a reality, because in transmitting values and environmental principles to his students, are providing that they, in exercising his professional activity, make decisions weighing the environmental values. This ensures improved quality of life. The present study aims to determine the level of environmental sustainability of the Academic Community of Lisbon College of Health Technology (ESTeSL), by calculating the EF, and describe whether a relation between Footprint and various socio-demographic characteristics of the subjects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Several antineoplasic drugs have been demonstrated to be carcinogenic or to have mutagenic and teratogenic effects. The greatest protection is achieved with the implementation of administrative and engineering controls and safety procedures. Objective: to evaluate the improvements on pharmacy technicians' work practices, after the implementation of operational procedures related to individual protection, biologic safety cabinet disinfection and cytotoxic drug preparation. Method: case-study in a hospital pharmacy undergoing a certification process. Six pharmacy technicians were observed during their daily activities. Characterization of the work practices was made using a checklist based on ISOPP and PIC guidelines. The variables studied concerning cleaning/disinfection procedures, personal protective equipment and procedures for preparing cytotoxic drugs. The same work practices were evaluated after four months of operational procedures implementation. Concordance between work practices and guidelines was considered to be a quality indicator (guidelines concordance practices number/total number of practices x 100). Results: improvements were observed after operational procedures implementation. An improvement of 6,25% in personal protective equipment practice was achieved by changing second pair of gloves every thirty minutes. The major progress, 10%, was obtained in disinfection procedure, where 80% of tasks are now realized according to guidelines.By now, we hot an improvement of only 1% at drug preparation procedure by placing one cytotoxic drug at a time inside the biological safety cabinet. Then, 85% of practices are according to guidelines. Conclusion: before operational procedures implementation 80,3% of practices were according to the guidelines, while now is 84,4%. This indicates that is necessary to review the procedures frequently in the benefit to reduce the risks associated with handling cytotoxic drugs and maintenance of drug specifications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mestrado em Contabilidade e Gestão das Instituições Financeiras

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho de Dissertação de Natureza Científica para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização em Hidráulica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mestrado em Fiscalidade

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mestrado em Controlo de Gestão e dos Negócios

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present work aims to study the feasibility of deploying a farm of sea current turbines for electricity generation in Portugal. An approach to the tides, which are they, how they are formed, its prediction, is held. It is also conducted a study about the energy of sea currents and it is presented some technology about ocean currents too. A model of tidal height and velocity of the currents it is also developed. The energy produced by a hypothetical park, built in Sines (Portugal), is calculated and afterwards, an economical assessment is performed for two possible scenarios and a sensitivity analysis of NVP (Net Present Value) and LCOE (Levelized Cost of Energy) is figured. The conclusions about the feasibility of the projects are also presented. Despite being desired due to its predictability, this energy source is not yet economically viable as it is in an initial state of development. To push investment in this technology a feed-in tariff of, at least €200/MWh, should be considered.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present work aims to study the feasibility of deploying a farm of sea current turbines for electricity generation in Portugal. An approach to the tides, which are they, how they are formed, its prediction, is held. It is also conducted a study about the energy of sea currents and it is presented some technology about ocean currents too. A model of tidal height and velocity of the currents it is also developed. The energy produced by a hypothetical park, built in Sines (Portugal), is calculated and afterwards, an economical assessment is performed for two possible scenarios and a sensitivity analysis of NVP (Net Present Value) and LCOE (Levelized Cost of Energy) is figured. The conclusions about the feasibility of the projects are also presented. Despite being desired due to its predictability, this energy source is not yet economically viable as it is in an initial state of development. To push investment in this technology a feed-in tariff of, at least €200/MWh, should be considered.