4 resultados para tides
em Repositório Científico do Instituto Politécnico de Lisboa - Portugal
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica
Resumo:
The present work aims to study the feasibility of deploying a farm of sea current turbines for electricity generation in Portugal. An approach to the tides, which are they, how they are formed, its prediction, is held. It is also conducted a study about the energy of sea currents and it is presented some technology about ocean currents too. A model of tidal height and velocity of the currents it is also developed. The energy produced by a hypothetical park, built in Sines (Portugal), is calculated and afterwards, an economical assessment is performed for two possible scenarios and a sensitivity analysis of NVP (Net Present Value) and LCOE (Levelized Cost of Energy) is figured. The conclusions about the feasibility of the projects are also presented. Despite being desired due to its predictability, this energy source is not yet economically viable as it is in an initial state of development. To push investment in this technology a feed-in tariff of, at least €200/MWh, should be considered.
Resumo:
The present work aims to study the feasibility of deploying a farm of sea current turbines for electricity generation in Portugal. An approach to the tides, which are they, how they are formed, its prediction, is held. It is also conducted a study about the energy of sea currents and it is presented some technology about ocean currents too. A model of tidal height and velocity of the currents it is also developed. The energy produced by a hypothetical park, built in Sines (Portugal), is calculated and afterwards, an economical assessment is performed for two possible scenarios and a sensitivity analysis of NVP (Net Present Value) and LCOE (Levelized Cost of Energy) is figured. The conclusions about the feasibility of the projects are also presented. Despite being desired due to its predictability, this energy source is not yet economically viable as it is in an initial state of development. To push investment in this technology a feed-in tariff of, at least €200/MWh, should be considered.
Resumo:
In this paper, we present a deterministic approach to tsunami hazard assessment for the city and harbour of Sines, Portugal, one of the test sites of project ASTARTE (Assessment, STrategy And Risk Reduction for Tsunamis in Europe). Sines has one of the most important deep-water ports, which has oil-bearing, petrochemical, liquid-bulk, coal, and container terminals. The port and its industrial infrastructures face the ocean southwest towards the main seismogenic sources. This work considers two different seismic zones: the Southwest Iberian Margin and the Gloria Fault. Within these two regions, we selected a total of six scenarios to assess the tsunami impact at the test site. The tsunami simulations are computed using NSWING, a Non-linear Shallow Water model wIth Nested Grids. In this study, the static effect of tides is analysed for three different tidal stages: MLLW (mean lower low water), MSL (mean sea level), and MHHW (mean higher high water). For each scenario, the tsunami hazard is described by maximum values of wave height, flow depth, drawback, maximum inundation area and run-up. Synthetic waveforms are computed at virtual tide gauges at specific locations outside and inside the harbour. The final results describe the impact at the Sines test site considering the single scenarios at mean sea level, the aggregate scenario, and the influence of the tide on the aggregate scenario. The results confirm the composite source of Horseshoe and Marques de Pombal faults as the worst-case scenario, with wave heights of over 10 m, which reach the coast approximately 22 min after the rupture. It dominates the aggregate scenario by about 60 % of the impact area at the test site, considering maximum wave height and maximum flow depth. The HSMPF scenario inundates a total area of 3.5 km2. © Author(s) 2015.