4 resultados para Probability of default

em Repositório Científico do Instituto Politécnico de Lisboa - Portugal


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The portfolio generating the iTraxx EUR index is modeled by coupled Markov chains. Each of the industries of the portfolio evolves according to its own Markov transition matrix. Using a variant of the method of moments, the model parameters are estimated from a data set of Standard and Poor's. Swap spreads are evaluated by Monte-Carlo simulations. Along with an actuarially fair spread, at least squares spread is considered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper studies the evolution of the default risk premia for European firms during the years surrounding the recent credit crisis. We employ the information embedded in Credit Default Swaps (CDS) and Moody’s KMV EDF default probabilities to analyze the common factors driving this risk premia. The risk premium is characterized in several directions: Firstly, we perform a panel data analysis to capture the relationship between CDS spreads and actual default probabilities. Secondly, we employ the intensity framework of Jarrow et al. (2005) in order to measure the theoretical effect of risk premium on expected bond returns. Thirdly, we carry out a dynamic panel data to identify the macroeconomic sources of risk premium. Finally, a vector autoregressive model analyzes which proportion of the co-movement is attributable to financial or macro variables. Our estimations report coefficients for risk premium substantially higher than previously referred for US firms and a time varying behavior. A dominant factor explains around 60% of the common movements in risk premia. Additionally, empirical evidence suggests a public-to-private risk transfer between the sovereign CDS spreads and corporate risk premia.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose - The study evaluates the pre- and post-training lesion localisation ability of a group of novice observers. Parallels are drawn with the performance of inexperienced radiographers taking part in preliminary clinical evaluation (PCE) and ‘red-dot’ systems, operating within radiography practice. Materials and methods - Thirty-four novice observers searched 92 images for simulated lesions. Pre-training and post-training evaluations were completed following the free-response the receiver operating characteristic (FROC) method. Training consisted of observer performance methodology, the characteristics of the simulated lesions and information on lesion frequency. Jackknife alternative FROC (JAFROC) and highest rating inferred ROC analyses were performed to evaluate performance difference on lesion-based and case-based decisions. The significance level of the test was set at 0.05 to control the probability of Type I error. Results - JAFROC analysis (F(3,33) = 26.34, p < 0.0001) and highest-rating inferred ROC analysis (F(3,33) = 10.65, p = 0.0026) revealed a statistically significant difference in lesion detection performance. The JAFROC figure-of-merit was 0.563 (95% CI 0.512,0.614) pre-training and 0.677 (95% CI 0.639,0.715) post-training. Highest rating inferred ROC figure-of-merit was 0.728 (95% CI 0.701,0.755) pre-training and 0.772 (95% CI 0.750,0.793) post-training. Conclusions - This study has demonstrated that novice observer performance can improve significantly. This study design may have relevance in the assessment of inexperienced radiographers taking part in PCE or commenting scheme for trauma.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Risk Based Inspection (RBI) is a risk methodology used as the basis for prioritizing and managing the efforts for an inspection program allowing the allocation of resources to provide a higher level of coverage on physical assets with higher risk. The main goal of RBI is to increase equipment availability while improving or maintaining the accepted level of risk. This paper presents the concept of risk, risk analysis and RBI methodology and shows an approach to determine the optimal inspection frequency for physical assets based on the potential risk and mainly on the quantification of the probability of failure. It makes use of some assumptions in a structured decision making process. The proposed methodology allows an optimization of inspection intervals deciding when the first inspection must be performed as well as the subsequent intervals of inspection. A demonstrative example is also presented to illustrate the application of the proposed methodology.