31 resultados para Planning with Resources

em Repositório Científico do Instituto Politécnico de Lisboa - Portugal


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Radiotherapy is one of the therapeutics selected for localized prostate cancer, in cases where the tumour is confined to the prostate, penetrates the prostatic capsule or has reached the seminal vesicles (T1 to T3 stages). The radiation therapy can be administered through various modalities, being historically used the 3D conformal radiotherapy (3DCRT). Other modality of radiation administration is the intensity modulated radiotherapy (IMRT), that allows an increase of the total dose through modulation of the treatment beams, enabling a reduction in toxicity. One way to administer IMRT is through helical tomotherapy (TH). With this study we intent to analyze the advantages of helical tomotherapy when compared with 3DCRT, by evaluating the doses in the organs at risk (OAR) and planning target volumes (PTV).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The majority of worldwide structures use concrete as its main material. This happens because concrete is economically feasible, due to its undemanding production technology and case Of use. However, it is widely recognized that concrete production has a strong environmental impact in the planet. Natural aggregates use is one of the most important problems of concrete production nowadays, since they are obtained from limited, and in some countries scarce, resources. In Portugal, although there are enough stone quarries to cover coarse aggregates needs for several more years, Supplies of fine aggregates are becoming scarcer, especially in the northern part of the country. On the other hand, as concrete structures' life cycle comes to an end, an urgent need emerges to establish technically and economically viable solutions for demolition debris, other than for use as road base and quarry fill. This paper presents a partial life cycle assessment (LCA) of concrete made with fine recycled concrete aggregates performed with EcoConcrete tool. EcoConcrete is a tailor-made, interactive, learning and communications tool promoted by the Joint Project Group (JPG) on the LCA of concrete, to qualify and quantify the overall environment impact of concrete products. It consists of an interactive Excel-spreadsheet in which several environmental inputs (material quantities, distances from origin to production Site, production processes) and outputs (material, energy, emissions to air, water, soil or waste) are collected in a life cycle inventory, and are then processed to determine the environmental impact (assessment) of the analysed concrete, in terms of ozone layer depletion, smog or "greenhouse" effect.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Os sistemas de armas da Força Aérea Portuguesa (FAP) têm por missão a defesa militar de Portugal, através de operações aéreas e da defesa do espaço aéreo nacional, sendo o F-16 o principal avião de ataque em uso nesta organização. Neste sentido, e tendo em conta o actual contexto económico mundial, as organizações devem rentabilizar todos os recursos disponíveis, custos associados e optimizar processos de trabalho. Tendo por base os pressupostos anteriores, o presente estudo pretende analisar a implementação de lean na FAP, uma vez que esta filosofia assenta na eliminação de desperdícios com vista a uma melhoria da qualidade e diminuição de tempos e custos. Posto isto, a análise deste trabalho vai recair sobre a área de manutenção do F-16, em concreto na Inspeção de Fase (IF), um tipo de manutenção que esta aeronave realiza a cada trezentas horas de voo. O estudo de caso vai incidir em dois momentos da IF: o primeiro ponto relaciona-se com o processamento da recolha de dados para a reunião preliminar onde são definidas, para as áreas de trabalho executantes, as ações de manutenção a realizar com a paragem da aeronave. Deste modo, pretende-se averiguar as causas inerentes aos atrasos verificados para a realização desta reunião. O segundo ponto em observação compreende a informação obtida através da aplicação informática SIAGFA, em uso na FAP, para o processamento de dados de manutenção das quatro aeronaves que inauguraram a IF com a filosofia lean. Esta análise permitiu perceber o número de horas de trabalho dispendidas (em média pelas quatro aeronaves) por cada uma das cartas de trabalho, verificando-se que as cartas adicionais comportam mais horas; foi possível compreender quais as áreas de trabalho consideradas críticas; foram identificados os dias de trabalho realizado e tempos de paragem sem qualquer tipo de intervenção. Foi ainda avaliado, por aeronave, o número de horas de trabalho realizadas na IF e quais os constrangimentos que se verificaram nas aeronaves, que não realizaram a IF no tempo definido para tal.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

O trabalho que a seguir se apresenta tem como objectivo descrever a criação de um modelo que sirva de suporte a um sistema de apoio à decisão sobre o risco inerente à execução de projectos na área das Tecnologias de Informação (TI) recorrendo a técnicas de mineração de dados. Durante o ciclo de vida de um projecto, existem inúmeros factores que contribuem para o seu sucesso ou insucesso. A responsabilidade de monitorizar, antever e mitigar esses factores recai sobre o Gestor de Projecto. A gestão de projectos é uma tarefa difícil e dispendiosa, consome muitos recursos, depende de numerosas variáveis e, muitas vezes, até da própria experiência do Gestor de Projecto. Ao ser confrontado com as previsões de duração e de esforço para a execução de uma determinada tarefa, o Gestor de Projecto, exceptuando a sua percepção e intuição pessoal, não tem um modo objectivo de medir a plausibilidade dos valores que lhe são apresentados pelo eventual executor da tarefa. As referidas previsões são fundamentais para a organização, pois sobre elas são tomadas as decisões de planeamento global estratégico corporativo, de execução, de adiamento, de cancelamento, de adjudicação, de renegociação de âmbito, de adjudicação externa, entre outros. Esta propensão para o desvio, quando detectada numa fase inicial, pode ajudar a gerir melhor o risco associado à Gestão de Projectos. O sucesso de cada projecto terminado foi qualificado tendo em conta a ponderação de três factores: o desvio ao orçamentado, o desvio ao planeado e o desvio ao especificado. Analisando os projectos decorridos, e correlacionando alguns dos seus atributos com o seu grau de sucesso o modelo classifica, qualitativamente, um novo projecto quanto ao seu risco. Neste contexto o risco representa o grau de afastamento do projecto ao sucesso. Recorrendo a algoritmos de mineração de dados, tais como, árvores de classificação e redes neuronais, descreve-se o desenvolvimento de um modelo que suporta um sistema de apoio à decisão baseado na classificação de novos projectos. Os modelos são o resultado de um extensivo conjunto de testes de validação onde se procuram e refinam os indicadores que melhor caracterizam os atributos de um projecto e que mais influenciam o risco. Como suporte tecnológico para o desenvolvimento e teste foi utilizada a ferramenta Weka 3. Uma boa utilização do modelo proposto possibilitará a criação de planos de contingência mais detalhados e uma gestão mais próxima para projectos que apresentem uma maior propensão para o risco. Assim, o resultado final pretende constituir mais uma ferramenta à disposição do Gestor de Projecto.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

O objectivo deste trabalho passa pelo desenvolvimento de uma ferramenta de simulação dinâmica de recursos rádio em LTE no sentido descendente, com recurso à Framework OMNeT++. A ferramenta desenvolvida permite realizar o planeamento das estações base, simulação e análise de resultados. São descritos os principais aspectos da tecnologia de acesso rádio, designadamente a arquitectura da rede, a codificação, definição dos recursos rádio, os ritmos de transmissão suportados ao nível de canal e o mecanismo de controlo de admissão. Foi definido o cenário de utilização de recursos rádio que inclui a definição de modelos de tráfego e de serviços orientados a pacotes e circuitos. Foi ainda considerado um cenário de referência para a verificação e validação do modelo de simulação. A simulação efectua-se ao nível de sistema, suportada por um modelo dinâmico, estocástico e orientado por eventos discretos de modo a contemplar os diferentes mecanismos característicos da tecnologia OFDMA. Os resultados obtidos permitem a análise de desempenho dos serviços, estações base e sistema ao nível do throughput médio da rede, throughput médio por eNodeB e throughput médio por móvel para além de permitir analisar o contributo de outros parâmetros designadamente, largura de banda, raio de cobertura, perfil dos serviços, esquema de modulação, entre outros. Dos resultados obtidos foi possível verificar que, considerando um cenário com estações base com raio de cobertura de 100 m obteve-se um throughput ao nível do utilizador final igual a 4.69494 Mbps, ou seja, 7 vezes superior quando comparado a estações base com raios de cobertura de 200m.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reclaimed water from small wastewater treatment facilities in the rural areas of the Beira Interior region (Portugal) may constitute an alternative water source for aquifer recharge. A 21-month monitoring period in a constructed wetland treatment system has shown that 21,500 m(3) year(-1) of treated wastewater (reclaimed water) could be used for aquifer recharge. A GIS-based multi-criteria analysis was performed, combining ten thematic maps and economic, environmental and technical criteria, in order to produce a suitability map for the location of sites for reclaimed water infiltration. The areas chosen for aquifer recharge with infiltration basins are mainly composed of anthrosol with more than 1 m deep and fine sand texture, which allows an average infiltration velocity of up to 1 m d(-1). These characteristics will provide a final polishing treatment of the reclaimed water after infiltration (soil aquifer treatment (SAT)), suitable for the removal of the residual load (trace organics, nutrients, heavy metals and pathogens). The risk of groundwater contamination is low since the water table in the anthrosol areas ranges from 10 m to 50 m. Oil the other hand, these depths allow a guaranteed unsaturated area suitable for SAT. An area of 13,944 ha was selected for study, but only 1607 ha are suitable for reclaimed water infiltration. Approximately 1280 m(2) were considered enough to set up 4 infiltration basins to work in flooding and drying cycles.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Os Caminhos-de-ferro representam um conjunto de abordagens quase ilimitadas, nestes termos, o tema proposto – “A optimização de recursos na construção de linhas de Caminhos de Ferro”, incidirá particularmente sobre a optimização dos recursos: i) materiais; ii) mão-de-obra; iii) equipamentos, afectos a construção da via e da catenária. O presente estudo pretende traçar um encadeamento lógico e intuitivo que permita manter um fio condutor ao longo do todo o seu desenvolvimento, razão pela qual, a sequência dos objectivos apresentados constitui um caminho que permitira abrir sucessivas janelas de conhecimento. O conhecimento da via e da catenária, a compreensão da forma como os trabalhos interagem com os factores externos e a experiência na utilização das ferramentas de planeamento e gestão, são qualidades que conduzem certamente a bons resultados quando nos referimos a necessidade de optimizar os recursos na construção da via e da catenária. A transmissão e reciprocidade da informação, entre as fases de elaboração de propostas e de execução da obra, representam um recurso que pode conduzir a ganhos de produtividade. A coordenação e outro factor determinante na concretização dos objectivos de optimização dos recursos, que se efectua, quer internamente, quer exteriormente. A optimização de recursos na construção da via e da catenária representa o desafio permanente das empresas de construção do sector ferroviário. E neste pressuposto que investem na formação e especialização da sua mão-de-obra e na renovação tecnológica dos seus equipamentos. A optimização dos materiais requer aproximações distintas para o caso da via e para o caso da catenária, assim como, os equipamentos e a mão-de-obra não podem ser desligados, pois não funcionam autonomamente, no entanto a respectiva optimização obedece a pressupostos diferentes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação apresentada à Escola Superior de Educação de Lisboa para obtenção de grau de mestre em Ciências da Educação, especialidade Educação Especial – Problemas Cognitivos e Multideficiência

Relevância:

30.00% 30.00%

Publicador:

Resumo:

O estágio desenvolvido na empresa de construção Manuel da Graça Peixito, incidiu sobre Direcção e Gestão de Obra na execução de um projecto de reconversão urbanística a aplicar na AUGI 42 localizada no Casal do Sapo em Sesimbra. As áreas urbanas de génese ilegal, denominadas de AUGI, surgiram no inicio da década de 60, como um fenómeno que surgiu de forma a colmatar a carência no parque habitacional das periferias das grandes áreas metropolitanas do território nacional. O ambiente urbano gerado pela existência das AUGI, muitas vezes de proporções de grande dimensão, evidencia inúmeras carências e problemas a níveis sociais, económicos, urbanísticos e legais. A gestão de obra é uma actividade essencial na execução da obra e no planeamento de todas as tarefas a realizar com o melhor tratamento económico e financeiro. A direcção de obra tem como principais funções a selecção de recursos humanos, escolha e montagem dos órgãos de apoio logístico, a aquisição atempada e negociação de materiais. O Gestor e Director de Obra é colocado num ciclo operacional de optimização de recursos e eficiências, em que as duas funções, gestão e direcção de obra, são complementares e a abordagem do contexto interactivo do controlo da obra, em termos da produção, da gestão económica e financeira, da gestão do tempo, do cumprimento das normas de saúde e segurança no trabalho e no assegurar da qualidade, são claramente identificadas, enquanto veículo indispensável do cumprimento do contrato de empreitada. O processo de reconversão urbanística aplicado na AUGI 42 teve como estrutura de proposta a seguinte base: primeiro na recolha de dados relativo à AUGI 42 e na definição de um planeamento do faseamento numa estratégia de execução da empreitada; segundo na constituição e caracterização da execução de variadas infra-estruturas (rede de drenagem de esgotos domésticos e pluviais, rede de abastecimento de águas, rede de telecomunicações, rede eléctrica, rede de gás, rede viária e arranjos de espaços exteriores). Este processo e consequente proposta surgem como um contributo fundamental na melhoria da qualidade de vida das populações, como também da funcionalidade do sistema urbano que compõe as AUGI.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mestrado em Radiações Aplicadas às Tecnologias da Saúde.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a distributed model predictive control (DMPC) for indoor thermal comfort that simultaneously optimizes the consumption of a limited shared energy resource. The control objective of each subsystem is to minimize the heating/cooling energy cost while maintaining the indoor temperature and used power inside bounds. In a distributed coordinated environment, the control uses multiple dynamically decoupled agents (one for each subsystem/house) aiming to achieve satisfaction of coupling constraints. According to the hourly power demand profile, each house assigns a priority level that indicates how much is willing to bid in auction for consume the limited clean resource. This procedure allows the bidding value vary hourly and consequently, the agents order to access to the clean energy also varies. Despite of power constraints, all houses have also thermal comfort constraints that must be fulfilled. The system is simulated with several houses in a distributed environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A great number of low-temperature geothermal fields occur in Northern-Portugal related to fractured rocks. The most important superficial manifestations of these hydrothermal systems appear in pull-apart tectonic basins and are strongly conditioned by the orientation of the main fault systems in the region. This work presents the interpretation of gravity gradient maps and 3D inversion model produced from a regional gravity survey. The horizontal gradients reveal a complex fault system. The obtained 3D model of density contrast puts into evidence the main fault zone in the region and the depth distribution of the granitic bodies. Their relationship with the hydrothermal systems supports the conceptual models elaborated from hydrochemical and isotopic water analyses. This work emphasizes the importance of the role of the gravity method and analysis to better understand the connection between hydrothermal systems and the fractured rock pattern and surrounding geology. (c) 2013 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Este artigo tem como foco o uso de casos multimédia na formação inicial de professores e procura analisar o seu contributo para o desenvolvimento do conhecimento didático de futuras professoras acerca do ensino exploratório da Matemática, bem como apreciar as suas perspetivas sobre as mais-valias do caso multimédia utilizado como recurso formativo. Analisam-se questionários e relatórios de treze alunas do Mestrado em Educação Pré-Escolar e Ensino do 1.º Ciclo da Universidade de Évora, que trabalharam sobre um caso multimédia que retrata a prática de ensino de uma professora de 1º ciclo. O caso inclui recursos diversificados, sendo os vídeos de sala de aula complementados com o plano da aula, as resoluções da tarefa pelos alunos, as reflexões da professora sobre a sua prática, um quadro de referência sobre o ensino exploratório da Matemática e artigos teóricos sobre ensino de natureza exploratória da Matemática. As alunas em formação apreciaram conhecer e explorar o caso multimédia, ressaltando a possibilidade de através dele conhecerem uma nova prática real de ensino da Matemática; sublinharam a importância de ouvirem as reflexões da professora para dotar de sentido a respetiva prática, revelando as intenções das suas ações; aprenderam também conhecimentos relevantes para pôr em prática o ensino exploratório, nomeadamente relativos ao conhecimento do processo instrucional, tanto no diz respeito à planificação, como à condução da aula.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação apresentada à Escola Superior de Educação de Lisboa para obtenção do grau de Mestre em Educação - Especialização em Educação Especial

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trabalho de Projecto de natureza científica para obtenção do grau de Mestre em Engenharia Civil