7 resultados para Nonlinear mixed effects model
em Repositório Científico do Instituto Politécnico de Lisboa - Portugal
Resumo:
On 26 January 1531, a strong-magnitude earthquake heavily impacted Lisbon downtown. Immediately after the earthquake, the eyewitnesses reported large waves in the Tagus estuary, mainly north of the city and along the northern bank of the river. Descriptions include large impacts on ships anchored in the estuary and even morphological changes in the riverbed. We present a synthesis of the available information concerning both the earthquake and the water disturbance as a basis for the discussion of the probable tectonic source and the magnitude of the associated river oscillations. We hypothesize that the initial disturbance of the water can be attributed to the coseismic deformation of the estuary riverbed, and we use a nonlinear shallow water model to simulate the tsunami propagation and inundation. We show that the Vila Franca de Xira fault is the most probable source of the 1531 event. The largest inundation effects of the model correlate well with the historical descriptions: the impact is relevant in the inner Tagus estuary, but inundation in downtown Lisbon is small.
Resumo:
Neste trabalho é efectuado, não só o diagnóstico em regime permanente, mas também o estudo, simulação e análise do comportamento dinâmico da rede eléctrica da ilha de São Vicente em Cabo Verde. Os estudos de estabilidade transitória desempenham um importante papel, tanto no planeamento como na operação dos sistemas de potência. Tais estudos são realizados, em grande parte, através de simulação digital no domínio do tempo, utilizando integração numérica para resolver as equações não-lineares que modelam a dinâmica do sistema e dependem da existência de registos reais de perturbação (ex: osciloperturbografia). O objectivo do trabalho será também verificar a aplicabilidade dos requisitos técnicos que as unidades geradoras devem ter, no que concerne ao controlo de tensão, estabelecidos na futura regulamentação europeia desenvolvida pela ENTSO-E (European Network Transmission System Operator for Electricity). De entre os requisitos analisou-se a capacidade das máquinas existentes suportarem cavas de tensão decorrentes de curto-circuitos trifásicos simétricos, Fault Ride Through, no ponto de ligação à rede. Identificaram-se para o efeito os factores que influenciam a estabilidade desta rede, em regime perturbado nomeadamente: (i) duração do defeito, (ii) caracterização da carga, com e sem a presença do sistema de controlo de tensão (AVR) em unidades de geração síncronas. Na ausência de registos reais sobre o comportamento do sistema, conclui-se que este é sensível à elasticidade das cargas em particular do tipo potência constante, existindo risco de perda de estabilidade, neste caso, para defeitos superiores a 5ms sem AVR. A existência de AVR nesta rede afigura-se como indispensável para garantir estabilidade de tensão sendo contudo necessário proceder a uma correcta parametrização.
Resumo:
The interplay of seasonality, the system's nonlinearities and intrinsic stochasticity, is studied for a seasonally forced susceptible-exposed-infective-recovered stochastic model. The model is explored in the parameter region that corresponds to childhood infectious diseases such as measles. The power spectrum of the stochastic fluctuations around the attractors of the deterministic system that describes the model in the thermodynamic limit is computed analytically and validated by stochastic simulations for large system sizes. Size effects are studied through additional simulations. Other effects such as switching between coexisting attractors induced by stochasticity often mentioned in the literature as playing an important role in the dynamics of childhood infectious diseases are also investigated. The main conclusion is that stochastic amplification, rather than these effects, is the key ingredient to understand the observed incidence patterns.
Resumo:
This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain We propose a novel mixed-integer nonlinear programming (MINLP) approach, considering hydroelectric power generation as a nonlinear function of water discharge and of the head. As a new contribution to eat her studies, we model the on-off behavior of the hydro plants using integer variables, in order to avoid water discharges at forbidden areas Thus, an enhanced STHS is provided due to the more realistic modeling presented in this paper Our approach has been applied successfully to solve a test case based on one of the Portuguese cascaded hydro systems with a negligible computational time requirement.
Resumo:
Proceedings of International Conference - SPIE 7477, Image and Signal Processing for Remote Sensing XV - 28 September 2009
Resumo:
In this paper, a mixed-integer nonlinear approach is proposed to support decision-making for a hydro power producer, considering a head-dependent hydro chain. The aim is to maximize the profit of the hydro power producer from selling energy into the electric market. As a new contribution to earlier studies, a risk aversion criterion is taken into account, as well as head-dependency. The volatility of the expected profit is limited through the conditional value-at-risk (CVaR). The proposed approach has been applied successfully to solve a case study based on one of the main Portuguese cascaded hydro systems.
Resumo:
In this paper, a novel mixed-integer nonlinear approach is proposed to solve the short-term hydro scheduling problem in the day-ahead electricity market, considering not only head-dependency, but also start/stop of units, discontinuous operating regions and discharge ramping constraints. Results from a case study based on one of the main Portuguese cascaded hydro energy systems are presented, showing that the proposedmixed-integer nonlinear approach is proficient. Conclusions are duly drawn. (C) 2010 Elsevier Ltd. All rights reserved.