48 resultados para students at risk
Resumo:
Naturally Occurring Radioactive Materials (NORM) are materials that are found naturally in the environment and contain radioactive isotopes that can cause negative effects on the health of workers who manipulate them. Present in underground work like mining and tunnel construction in granite zones, these materials are difficult to identify and characterize without appropriate equipment for risk evaluation. The assessing methods were exemplified with a case study applied to the handling and processing of phosphoric rock where one found significant amounts of radioactive isotopes and consequently elevated radon concentrations in enclosed spaces containing these materials. © 2015 Taylor & Francis Group, London.
Resumo:
Risk Based Inspection (RBI) is a risk methodology used as the basis for prioritizing and managing the efforts for an inspection program allowing the allocation of resources to provide a higher level of coverage on physical assets with higher risk. The main goal of RBI is to increase equipment availability while improving or maintaining the accepted level of risk. This paper presents the concept of risk, risk analysis and RBI methodology and shows an approach to determine the optimal inspection frequency for physical assets based on the potential risk and mainly on the quantification of the probability of failure. It makes use of some assumptions in a structured decision making process. The proposed methodology allows an optimization of inspection intervals deciding when the first inspection must be performed as well as the subsequent intervals of inspection. A demonstrative example is also presented to illustrate the application of the proposed methodology.
Resumo:
Innovation is considered crucial for enterprises survival and current economic environment demands the best ways of achieving it. However, the development of complex products and services require the utilization of diverse know-how and technology, which enterprises may not hold. An effective strategy for achieving them is to rely in open innovation. Still, open innovation projects may fail for many causes, e.g. due to the dynamics of collaboration between partners. To effectively benefit from open innovation, it is recommended the utilization of adequate risk models. For achieving such models, a preliminary conceptualization of open innovation and risk is necessary, which includes modeling experiments with existing risk models, such as the FMEA.