50 resultados para risk constraints
Resumo:
Naturally Occurring Radioactive Materials (NORM) are materials that are found naturally in the environment and contain radioactive isotopes that can cause negative effects on the health of workers who manipulate them. Present in underground work like mining and tunnel construction in granite zones, these materials are difficult to identify and characterize without appropriate equipment for risk evaluation. The assessing methods were exemplified with a case study applied to the handling and processing of phosphoric rock where one found significant amounts of radioactive isotopes and consequently elevated radon concentrations in enclosed spaces containing these materials. © 2015 Taylor & Francis Group, London.
Resumo:
Risk Based Inspection (RBI) is a risk methodology used as the basis for prioritizing and managing the efforts for an inspection program allowing the allocation of resources to provide a higher level of coverage on physical assets with higher risk. The main goal of RBI is to increase equipment availability while improving or maintaining the accepted level of risk. This paper presents the concept of risk, risk analysis and RBI methodology and shows an approach to determine the optimal inspection frequency for physical assets based on the potential risk and mainly on the quantification of the probability of failure. It makes use of some assumptions in a structured decision making process. The proposed methodology allows an optimization of inspection intervals deciding when the first inspection must be performed as well as the subsequent intervals of inspection. A demonstrative example is also presented to illustrate the application of the proposed methodology.
Resumo:
Innovation is considered crucial for enterprises survival and current economic environment demands the best ways of achieving it. However, the development of complex products and services require the utilization of diverse know-how and technology, which enterprises may not hold. An effective strategy for achieving them is to rely in open innovation. Still, open innovation projects may fail for many causes, e.g. due to the dynamics of collaboration between partners. To effectively benefit from open innovation, it is recommended the utilization of adequate risk models. For achieving such models, a preliminary conceptualization of open innovation and risk is necessary, which includes modeling experiments with existing risk models, such as the FMEA.
Resumo:
In the framework of multibody dynamics, the path motion constraint enforces that a body follows a predefined curve being its rotations with respect to the curve moving frame also prescribed. The kinematic constraint formulation requires the evaluation of the fourth derivative of the curve with respect to its arc length. Regardless of the fact that higher order polynomials lead to unwanted curve oscillations, at least a fifth order polynomials is required to formulate this constraint. From the point of view of geometric control lower order polynomials are preferred. This work shows that for multibody dynamic formulations with dependent coordinates the use of cubic polynomials is possible, being the dynamic response similar to that obtained with higher order polynomials. The stabilization of the equations of motion, always required to control the constraint violations during long analysis periods due to the inherent numerical errors of the integration process, is enough to correct the error introduced by using a lower order polynomial interpolation and thus forfeiting the analytical requirement for higher order polynomials.
Resumo:
Over the past decade, scientists have been called to participate more actively in public education and outreach (E&O). This is particularly true in fields of significant societal impact, such as earthquake science. Local earthquake risk culture plays a role in the way that the public engages in educational efforts. In this article, we describe an adapted E&O program for earthquake science and risk. The program is tailored for a region of slow tectonic deformation, where large earthquakes are extreme events that occur with long return periods. The adapted program has two main goals: (1) to increase the awareness and preparedness of the population to earthquake and related risks (tsunami, liquefaction, fires, etc.), and (2) to increase the quality of earthquake science education, so as to attract talented students to geosciences. Our integrated program relies on activities tuned for different population groups who have different interests and abilities, namely young children, teenagers, young adults, and professionals.