6 resultados para Patient-generated outccome measures
em CiencIPCA - Instituto Politécnico do Cávado e do Ave, Portugal
Resumo:
The success of dental implant-supported prosthesis is directly linked to the accuracy obtained during implant’s pose estimation (position and orientation). Although traditional impression techniques and recent digital acquisition methods are acceptably accurate, a simultaneously fast, accurate and operator-independent methodology is still lacking. Hereto, an image-based framework is proposed to estimate the patient-specific implant’s pose using cone-beam computed tomography (CBCT) and prior knowledge of implanted model. The pose estimation is accomplished in a threestep approach: (1) a region-of-interest is extracted from the CBCT data using 2 operator-defined points at the implant’s main axis; (2) a simulated CBCT volume of the known implanted model is generated through Feldkamp-Davis-Kress reconstruction and coarsely aligned to the defined axis; and (3) a voxel-based rigid registration is performed to optimally align both patient and simulated CBCT data, extracting the implant’s pose from the optimal transformation. Three experiments were performed to evaluate the framework: (1) an in silico study using 48 implants distributed through 12 tridimensional synthetic mandibular models; (2) an in vitro study using an artificial mandible with 2 dental implants acquired with an i-CAT system; and (3) two clinical case studies. The results shown positional errors of 67±34μm and 108μm, and angular misfits of 0.15±0.08º and 1.4º, for experiment 1 and 2, respectively. Moreover, in experiment 3, visual assessment of clinical data results shown a coherent alignment of the reference implant. Overall, a novel image-based framework for implants’ pose estimation from CBCT data was proposed, showing accurate results in agreement with dental prosthesis modelling requirements.
Resumo:
ZigBee-based Remote Patient Monitoring
Resumo:
Pectus excavatum is the most common congenital deformity of the anterior chest wall, in which an abnormal formation of the rib cage gives the chest a caved-in or sunken appearance. Today, the surgical correction of this deformity is carried out in children and adults through Nuss technic, which consists in the placement of a prosthetic bar under the sternum and over the ribs. Although this technique has been shown to be safe and reliable, not all patients have achieved adequate cosmetic outcome. This often leads to psychological problems and social stress, before and after the surgical correction. This paper targets this particular problem by presenting a method to predict the patient surgical outcome based on pre-surgical imagiologic information and chest skin dynamic modulation. The proposed approach uses the patient pre-surgical thoracic CT scan and anatomical-surgical references to perform a 3D segmentation of the left ribs, right ribs, sternum and skin. The technique encompasses three steps: a) approximation of the cartilages, between the ribs and the sternum, trough b-spline interpolation; b) a volumetric mass spring model that connects two layers - inner skin layer based on the outer pleura contour and the outer surface skin; and c) displacement of the sternum according to the prosthetic bar position. A dynamic model of the skin around the chest wall region was generated, capable of simulating the effect of the movement of the prosthetic bar along the sternum. The results were compared and validated with patient postsurgical skin surface acquired with Polhemus FastSCAN system
Resumo:
AIM: This work presents detailed experimental performance results from tests executed in the hospital environment for Health Monitoring for All (HM4All), a remote vital signs monitoring system based on a ZigBee® (ZigBee Alliance, San Ramon, CA) body sensor network (BSN). MATERIALS AND METHODS: Tests involved the use of six electrocardiogram (ECG) sensors operating in two different modes: the ECG mode involved the transmission of ECG waveform data and heart rate (HR) values to the ZigBee coordinator, whereas the HR mode included only the transmission of HR values. In the absence of hidden nodes, a non-beacon-enabled star network composed of sensing devices working on ECG mode kept the delivery ratio (DR) at 100%. RESULTS: When the network topology was changed to a 2-hop tree, the performance degraded slightly, resulting in an average DR of 98.56%. Although these performance outcomes may seem satisfactory, further investigation demonstrated that individual sensing devices went through transitory periods with low DR. Other tests have shown that ZigBee BSNs are highly susceptible to collisions owing to hidden nodes. Nevertheless, these tests have also shown that these networks can achieve high reliability if the amount of traffic is kept low. Contrary to what is typically shown in scientific articles and in manufacturers' documentation, the test outcomes presented in this article include temporal graphs of the DR achieved by each wireless sensor device. CONCLUSIONS: The test procedure and the approach used to represent its outcomes, which allow the identification of undesirable transitory periods of low reliability due to contention between devices, constitute the main contribution of this work.
Resumo:
Work-related musculoskeletal disorders (WMSDs) are among the most costly health problems that society is facing today. Prevention involves investments and it is important for organizations to make a cost ebenefit analysis of ergonomic projects. Return on prevention is a recent concern in the domain of occupational safety and health (OSH). There are many studies concerning the return on the prevention of WMSDs, in terms of the benefits for the organization in which the preventive measures are implemented. However, it is also important to perform an analysis of the impact of each measure on society (externalities). A model to perform a financial and economic costebenefit analysis related to OSH projects was developed and it was applied in the case of the prevention of WMSDs in a Portuguese hospital. An analysis of the accidents and corresponding costs has been made in six of the services of the hospital. Financial and an economic costebenefit analysis have been made and the benefitecost ratio (B/C) has been calculated. While the B/C financial ratio, considering only the benefits to the hospital, is around 2, the economic B/C ratio, taking into account all the external benefits that have been quantified, is higher than 14. Relevance to industry: Both the economic and the financial B/C ratio are important support tools for decision makers in public and private organizations, helping them to define which preventive measures should be implemented, taking into account the costs involved and the resulting quantified benefits, for the organization, for the workers and for the society.
Resumo:
BACKGROUND: When an organization performs an integrated analysis of risks through its Occupational Health and Safety Management System, several steps are suggested to address the implications of the identified risks. Namely, the organization should make a detailed analysis of the monetary impact for the organization of each of the preventive measures considered. However, it is also important to perform an analysis of the impact of each measure on society (externalities). OBJECTIVE: The aim of this paper is to present a case study related to the application of the proposed economic evaluation methodology. METHODS: An analysis of the work accidents in a hospital has been made. Three of the major types of accidents have been selected: needle stings, falls and excessive strain. Following the risk assessment, some preventive measures have been designed. Subsequently, the Benefit/Cost ratio (B/C) of these measures has been calculated, both in financial terms (from the organization’s perspective) and in economic terms (including the benefits for the worker and for the Society). RESULTS: While the financial ratio is only advantageous in some cases, when the externalities are taken into account, the B/C ratio increases significantly. CONCLUSIONS: It is important to consider external benefits to make decisions concerning the implementation of preventive measures in Occupational Health and Safety projects