3 resultados para Advanced Planning and Scheduling systems

em CiencIPCA - Instituto Politécnico do Cávado e do Ave, Portugal


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective and efficient implementation of intelligent and/or recently emerged networked manufacturing systems require an enterprise level integration. The networked manufacturing offers several advantages in the current competitive atmosphere by way to reduce, by shortening manufacturing cycle time and maintaining the production flexibility thereby achieving several feasible process plans. The first step in this direction is to integrate manufacturing functions such as process planning and scheduling for multi-jobs in a network based manufacturing system. It is difficult to determine a proper plan that meets conflicting objectives simultaneously. This paper describes a mobile-agent based negotiation approach to integrate manufacturing functions in a distributed manner; and its fundamental framework and functions are presented. Moreover, ontology has been constructed by using the Protégé software which possesses the flexibility to convert knowledge into Extensible Markup Language (XML) schema of Web Ontology Language (OWL) documents. The generated XML schemas have been used to transfer information throughout the manufacturing network for the intelligent interoperable integration of product data models and manufacturing resources. To validate the feasibility of the proposed approach, an illustrative example along with varied production environments that includes production demand fluctuations is presented and compared the proposed approach performance and its effectiveness with evolutionary algorithm based Hybrid Dynamic-DNA (HD-DNA) algorithm. The results show that the proposed scheme is very effective and reasonably acceptable for integration of manufacturing functions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper proposes a methodology especially focused on the generation of strategic plans of action, emphasizing the relevance of having a structured timeframe classification for the actions. The methodology explicitly recognizes the relevance of long-term goals as strategic drivers, which must insure that the complex system is capable to effectively respond to changes in the environment. In addition, the methodology employs engineering systems techniques in order to understand the inner working of the system and to build up alternative plans of action. Due to these different aspects, the proposed approach features higher flexibility compared to traditional methods. The validity and effectiveness of the methodology has been demonstrated by analyzing an airline company composed by 5 subsystems with the aim of defining a plan of action for the next 5 years, which can either: improve efficiency, redefine mission or increase revenues.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Risk management can be considered as part of the Occupational Health and Safety System (OHS) of an organization and can be used to develop and implement the OHS policy and manage the associated risks. The success of the integration of risk management in OHS depends on both technical and human aspects. Thus, this paper presents and discusses the case of a company working in the area of solid waste treatment. This company was certified in 2009 with an Integrated Management Systems for Quality, Environment, Occupational Health and Safety. The evolution of accidents before and after the implementation of the integrated system was analysed and a questionnaire was used to capture the perceptions of the technicians on the risk management system. The analysis of the findings showed that the frequency of accidents increased since 2009 but the severity has been reduced. Several interrelated causes and consequences were analysed and discussed. Furthermore, the analysis of the opinions of the company’s technicians permitted to highlight some important aspects on the integration of risk management in the OHS system of the company. In line with this discussion some hypothesis have been formulated.