3 resultados para planejamento integrado
em Biblioteca Digital da Produção Intelectual da Universidade de São Paulo (BDPI/USP)
Resumo:
The determination of acetic acid in vinegar adulterated sample using simultaneous potentiometric and condutometric titrations was used as an example of integrated experiment in instrumental analysis. An Excel® spreadsheet, which allows the entry of simultaneous data and the construction of the superimposed experimental curves (condutometric, potentiometric, first and second derivative potentiometric curve and, distribution diagrama of the acetic species as function of pH), was used as powerful tool to discuss the fundamental concepts involved in each technique and choose the best of them to quantify, without mutual interference, H3CCOOH and HCl in vinegar adulterated sample.
Resumo:
Several mining companies operating in Brazil have been preparing mine closure plans describing end of life actions to ensure long term physical stability, land rehabilitation and, to a certain extent, socioeconomic measures. Most Brazilian and international guidelines, however, skip early closure and only feature guidance to closure planning after reserve depletion. In this paper, two cases of early closure in Australia are reviewed, causes for early closure are explored, criteria to evaluate preparedness to early mine closure are proposed and tested in two mines. It concludes that, despite recent advances, planning for mine closure seldom take account of early closure risks.