2 resultados para Illinois coal industry white paper
em Biblioteca Digital da Produção Intelectual da Universidade de São Paulo (BDPI/USP)
Resumo:
The aim of this study was to evaluate working conditions in the textile industry for different stages of Corporate Social Responsibility (CSR) development, and workers` perception of fatigue and workability. A cross-sectional study was undertaken with 126 workers in the production areas of five Brazilian textile plants. The corporate executive officers and managers of each company provided their personal evaluations of CSR. Companies were divided into 2 groups (higher and lower) of CSR scores. Workers completed questionnaires on fatigue, workability and working conditions. Ergonomic job analysis showed similar results for working conditions, independent of their CSR score. Multivariate analysis models were developed for fatigue and workability, indicating that they are both associated to factors related to working conditions and individual workers` characteristics and life styles. Work organization, (what, how, when, where and for how long the work is done), is also an associated factor for fatigue. This study suggests that workers` opinions should be taken into greater consideration when companies develop their CSR programs, in particular for those relating to working conditions. Relevance to industry: This paper underlines the importance of considering working conditions and workers` opinions of them, work organization and individual workers` characteristics and life styles in order to restore or to maintain workability and to reduce fatigue, independently of how developed a company may be in the field of Corporate Social Responsibility. (C) 2010 Elsevier B.V. All rights reserved.
Resumo:
An important production programming problem arises in paper industries coupling multiple machine scheduling with cutting stocks. Concerning machine scheduling: how can the production of the quantity of large rolls of paper of different types be determined. These rolls are cut to meet demand of items. Scheduling that minimizes setups and production costs may produce rolls which may increase waste in the cutting process. On the other hand, the best number of rolls in the point of view of minimizing waste may lead to high setup costs. In this paper, coupled modeling and heuristic methods are proposed. Computational experiments are presented.