64 resultados para Planning, Practice, Wind, Perceptions
Resumo:
International theory and practice have promoted state-assisted upgrading of `informal` urban areas worldwide since the late 1970s, with various forms of monitoring and assessment of impact. Two independent studies of how residents perceive and evaluate such interventions have recently been undertaken for neighbouring parts of the upgraded area of Novos Alagados on the Itapagipe peninsula in the northwestern part of Salvador, Brazil`s third largest city. These studies start from different premises and have been implemented in very different ways, but both have the objective of permitting the `voice` of the residents to be heard concerning the upgrading process. Comparing them helps highlight the essential `fuzzy` nature of values concerning urban interventions of this nature and leaves us with thought-provoking questions concerning the role of local society in relation to the state in urban development, and the potential this has for on-going forms of urban management in cities which are emerging globally. Crown Copyright (C) 2009 Published by Elsevier Ltd. All rights reserved.
Resumo:
In this paper, a novel adaptive strategy to obtain technically justified fault-ride-through requirements for wind turbines (WTs) is proposed. The main objective is to promote an effective integration of wind turbines into power systems with still low penetration levels of wind power based on technical and economical considerations. The level of requirement imposed by the strategy is increased stepwise over time, depending on system characteristics and on wind power penetration level. The idea behind is to introduce stringent requirements only when they are technically needed for a reliable and secure power system operation. Voltage stability support and fault-ride-through requirements are considered in the strategy. Simulations are based on the Chilean transmission network, a midsize isolated power system with still low penetration levels of wind power. Simulations include fixed speed induction generators and doubly fed induction generators. The effects on power system stability of the wind power injections, integrated into the network by adopting the adaptive strategy, are compared with the effects that have the same installed capacity of wind power but only considering WTs able to fulfill stringent requirements (fault-ride-through capability and support voltage stability). Based on simulations and international experience, technically justified requirements for the Chilean case are proposed.
Resumo:
This paper reports on design of digital control for wind turbines and its relation to the quality of power fed into the Brazilian grid on connecting to it a 192 MW wind farm equipped with doubly fed induction generators. PWM converters are deployed as vector controlled regulated current voltage sources for their rotors, for independent control of both active and reactive power of those generators. Both speed control and active power control strategies are analyzed, in the search for maximum efficiency of conversion of wind kinetic energy into electric power and enhanced quality of delivered power. (C) 2009 Elsevier B.V. All rights reserved.
Resumo:
This paper proposes ail alternative configuration to conventional reverse osmosis (RO) desalination systems by incorporating the use of gravitational potential energy. The proposal suggests a model that can be viewed as the energy station of a RO desalination plant. Conventionally, RO plants use a high-pressure pump, powered by electricity or fossil fuel. The function of the pump is to send a flux of saline water to a group of semi-permeable membrane modules, capable of ""filtering"" the dissolved salts. In this proposed model, we intend to achieve a flux at the inlet of the membrane modules with a pressure high enough for the desalination process, without using, either electricity or fossil fuels. To do this we divised a hybrid system that uses both gravitational potential energy and wind energy. The technical viability of the alternative was theoretically proven by deductions based on physics and mathematics.
Resumo:
This paper describes the development of an optimization model for the management and operation of a large-scale, multireservoir water supply distribution system with preemptive priorities. The model considers multiobjectives and hedging rules. During periods of drought, when water supply is insufficient to meet the planned demand, appropriate rationing factors are applied to reduce water supply. In this paper, a water distribution system is formulated as a network and solved by the GAMS modeling system for mathematical programming and optimization. A user-friendly interface is developed to facilitate the manipulation of data and to generate graphs and tables for decision makers. The optimization model and its interface form a decision support system (DSS), which can be used to configure a water distribution system to facilitate capacity expansion and reliability studies. Several examples are presented to demonstrate the utility and versatility of the developed DSS under different supply and demand scenarios, including applications to one of the largest water supply systems in the world, the Sao Paulo Metropolitan Area Water Supply Distribution System in Brazil.
Resumo:
The effectiveness of environmental reclamation measures implemented in limestone mines is reviewed. An assessment procedure developed by Neri and Sanchez (2008) was used. This tool comprises else! of statements of good practice grouped in three categories (essential, important and accessory practices) which are assessed through (i) carrying outfield technical inspections guided by a series of protocols especially designed for this put pose; (ii) classifying inspection evidences according to previously defined categories (totally applied or satisfactorily adapted, partially applied, not applied or not applicable); and (iii) calculating conformity indexes.. The results showed that: planning activities featured the lowest performance (low conformity indexes), operational practices reached the most satisfactory results and management practices medium conformity indexes. A general conclusion is that in these mines, current practices are partially effective in establishing favorable conditions for long-term success of rehabilitation. Improvements in planning practices could significantly enhance performance and reduce risks.
Resumo:
Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on `what is strategic` is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval. (c) 2008 Elsevier Inc. All rights reserved.
Resumo:
A procedure to evaluate mine rehabilitation practices during the operational phase was developed and validated. It is based on a comparison of actually observed or documented practices with internationally recommended best practices (BP). A set of 150 BP statements was derived from international guides in order to establish the benchmark. The statements are arranged in six rehabilitation programs under three categories: (1) planning (2) operational and (3) management, corresponding to the adoption of the plan-do-check-act management systems model to mine rehabilitation. The procedure consists of (i) performing technical inspections guided by a series of field forms containing BP statements; (ii) classifying evidences in five categories; and (iii) calculating conformity indexes and levels. For testing and calibration purposes, the procedure was applied to nine limestone quarries and conformity indexes were calculated for the rehabilitation programs in each quarry. Most quarries featured poor planning practices, operational practices reached high conformity levels in 50% of the cases and management practices scored moderate conformity. Despite all quarries being ISO 14001 certified, their management systems pay low attention to issues pertaining to land rehabilitation and biodiversity. The best results were achieved by a quarry whose expansion was recently submitted to the environmental impact assessment process, suggesting that public scrutiny may play a positive role in enhancing rehabilitation practices. Conformity indexes and levels can be used to chart the evolution of rehabilitation practices at regular intervals, to establish corporate goals and for communication with stakeholders. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
Simulated annealing (SA) is an optimization technique that can process cost functions with degrees of nonlinearities, discontinuities and stochasticity. It can process arbitrary boundary conditions and constraints imposed on these cost functions. The SA technique is applied to the problem of robot path planning. Three situations are considered here: the path is represented as a polyline; as a Bezier curve; and as a spline interpolated curve. In the proposed SA algorithm, the sensitivity of each continuous parameter is evaluated at each iteration increasing the number of accepted solutions. The sensitivity of each parameter is associated to its probability distribution in the definition of the next candidate. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
Duplex and superduplex stainless steels present superior mechanical and corrosion properties when compared to usual stainless steels. This superiority is based on chemical composition when in a balanced microstructure (approximately 50% of ferrite). During welding, changes may occur in both, the chemical composition and volume fraction of phases in the material, which may generate the presence of intermetallic phases and, as a consequence, modify the mechanical and corrosion properties of this group of stainless steels. The objective of this work is to apply ASTM A923- Practice A to verify the presence of intermetallic phases in welded joints of UNS 32750 su-perduplex stainless steel. Tubes of UNS 32750, with external diameters of 18 and 44 mm and a thickness of 1.5 mm, were welded using orbital GTAW, with filler metal 25Cr-10Ni-4Mo and a diameter of 0.8 mm. The metal-based and welded joints were characterized by optical and scanning electron microscopy. The results showed that there was no precipitation of the intermetallic phase, such as sigma phase, detected by ASTM A923, but the HAZ of the two tubes studied presented small regions with chromium nitrides, which can also change the properties of welded joins.
Resumo:
Grass reference evapotranspiration (ETo) is an important agrometeorological parameter for climatological and hydrological studies, as well as for irrigation planning and management. There are several methods to estimate ETo, but their performance in different environments is diverse, since all of them have some empirical background. The FAO Penman-Monteith (FAD PM) method has been considered as a universal standard to estimate ETo for more than a decade. This method considers many parameters related to the evapotranspiration process: net radiation (Rn), air temperature (7), vapor pressure deficit (Delta e), and wind speed (U); and has presented very good results when compared to data from lysimeters Populated with short grass or alfalfa. In some conditions, the use of the FAO PM method is restricted by the lack of input variables. In these cases, when data are missing, the option is to calculate ETo by the FAD PM method using estimated input variables, as recommended by FAD Irrigation and Drainage Paper 56. Based on that, the objective of this study was to evaluate the performance of the FAO PM method to estimate ETo when Rn, Delta e, and U data are missing, in Southern Ontario, Canada. Other alternative methods were also tested for the region: Priestley-Taylor, Hargreaves, and Thornthwaite. Data from 12 locations across Southern Ontario, Canada, were used to compare ETo estimated by the FAD PM method with a complete data set and with missing data. The alternative ETo equations were also tested and calibrated for each location. When relative humidity (RH) and U data were missing, the FAD PM method was still a very good option for estimating ETo for Southern Ontario, with RMSE smaller than 0.53 mm day(-1). For these cases, U data were replaced by the normal values for the region and Delta e was estimated from temperature data. The Priestley-Taylor method was also a good option for estimating ETo when U and Delta e data were missing, mainly when calibrated locally (RMSE = 0.40 mm day(-1)). When Rn was missing, the FAD PM method was not good enough for estimating ETo, with RMSE increasing to 0.79 mm day(-1). When only T data were available, adjusted Hargreaves and modified Thornthwaite methods were better options to estimate ETo than the FAO) PM method, since RMSEs from these methods, respectively 0.79 and 0.83 mm day(-1), were significantly smaller than that obtained by FAO PM (RMSE = 1.12 mm day(-1). (C) 2009 Elsevier B.V. All rights reserved.
Resumo:
The complex interactions among endangered ecosystems, landowners` interests, and different models of land tenure and use, constitute an important series of challenges for those seeking to maintain and restore biodiversity and augment the flow of ecosystem services. Over the past 10 years, we have developed a data-based approach to address these challenges and to achieve medium and large-scale ecological restoration of riparian areas on private lands in the state of Sao Paulo, southeastern Brazil. Given varying motivations for ecological restoration, the location of riparian areas within landholdings, environmental zoning of different riparian areas, and best-practice restoration methods were developed for each situation. A total of 32 ongoing projects, covering 527,982 ha, were evaluated in large sugarcane farms and small mixed farms, and six different restoration techniques have been developed to help upscale the effort. Small mixed farms had higher portions of land requiring protection as riparian areas (13.3%), and lower forest cover of riparian areas (18.3%), than large sugarcane farms (10.0% and 36.9%, respectively for riparian areas and forest cover values). In both types of farms, forest fragments required some degree of restoration. Historical anthropogenic degradation has compromised forest ecosystem structure and functioning, despite their high-diversity of native tree and shrub species. Notably, land use patterns in riparian areas differed markedly. Large sugarcane farms had higher portions of riparian areas occupied by highly mechanized agriculture, abandoned fields, and anthropogenic wet fields created by siltation in water courses. In contrast, in small mixed crop farms, low or non-mechanized agriculture and pasturelands were predominant. Despite these differences, plantations of native tree species covering the entire area was by far the main restoration method needed both by large sugarcane farms (76.0%) and small mixed farms (92.4%), in view of the low resilience of target sites, reduced forest cover, and high fragmentation, all of which limit the potential for autogenic restoration. We propose that plantations should be carried out with a high-diversity of native species in order to create biologically viable restored forests, and to assist long-term biodiversity persistence at the landscape scale. Finally, we propose strategies to integrate the political, socio-economic and methodological aspects needed to upscale restoration efforts in tropical forest regions throughout Latin America and elsewhere. (C) 2010 Elsevier BA/. All rights reserved.
Resumo:
Objective. To investigate the modes of water supply and the perception concerning the problems caused by this water among residents of a neighborhood without public supply of water, settled in an area previously used as a garbage dump in the city of Manaus, Brazil. Methods. One hundred and sixty-two semi-structured household interviews were conducted. In addition, a focal group with teachers from a local public school and a meeting with residents were held. The instruments employed focused on the perception and modes of water use and on the process of exposure to chemical contaminants through water. Results. Untreated well water was used by most families. This water was considered to be ""good"" by 64.8% of the individuals interviewed. Most residents (88.3%) declared knowledge about the garbage dump. Of these, 77.6% stated that the garbage dump caused health and environmental problems. However, qualitative analysis of the responses revealed that the residents were not aware of contamination by chemical elements or of the consequences of such contamination. The activities carried out with teachers revealed that they were partially aware of the problem, but did not design interventions to address the issue. In a meeting with neighborhood residents, the presence of social activism concerning the problem was identified, but it did not extend beyond the neighborhood or reach governmental spheres. Conclusions. The study identified a situation of critical exposure that tends to be maintained as a result of misperceptions and lack of social mobilization. The dissemination of research results to teachers and residents was useful to empower subjects.
Resumo:
This study examines the relationship between management accounting and planning profiles in Brazilian companies. The main goal is to understand the consequences of not including a fully structured management accounting scheme in the planning process. The authors conducted a field research among medium and large-sized companies, using a probabilistic sample from a population of 2281 companies. Using analytic hierarchy process (AHP) and statistical cluster analysis, the authors grouped the entities` strategic budget planning processes into five profiles, after which the authors applied statistical tests to assess the five clusters. The study concludes that poor or fully implemented strategic and budget-planning processes relate to the management accounting profiles of the Brazilian organizations studied. (C) 2009 Elsevier Inc. All rights reserved.
Resumo:
Overcommitment of development capacity or development resource deficiencies are important problems in new product development (NPD). Existing approaches to development resource planning have largely neglected the issue of resource magnitude required for NPD. This research aims to fill the void by developing a simple higher-level aggregate model based on an intuitive idea: The number of new product families that a firm can effectively undertake is bound by the complexity of its products or systems and the total amount of resources allocated to NPD. This study examines three manufacturing companies to verify the proposed model. The empirical results confirm the study`s initial hypothesis: The more complex the product family, the smaller the number of product families that are launched per unit of revenue. Several suggestions and implications for managing NPD resources are discussed, such as how this study`s model can establish an upper limit for the capacity to develop and launch new product families.