3 resultados para temporal activity

em WestminsterResearch - UK


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The neuropsychological phenomenon of blindsight has been taken to suggest that the primary visual cortex (V1) plays a unique role in visual awareness, and that extrastriate activation needs to be fed back to V1 in order for the content of that activation to be consciously perceived. The aim of this review is to evaluate this theoretical framework and to revisit its key tenets. Firstly, is blindsight truly a dissociation of awareness and visual detection? Secondly, is there sufficient evidence to rule out the possibility that the loss of awareness resulting from a V1 lesion simply reflects reduced extrastriate responsiveness, rather than a unique role of V1 in conscious experience? Evaluation of these arguments and the empirical evidence leads to the conclusion that the loss of phenomenal awareness in blindsight may not be due to feedback activity in V1 being the hallmark awareness. On the basis of existing literature, an alternative explanation of blindsight is proposed. In this view, visual awareness is a “global” cognitive function as its hallmark is the availability of information to a large number of perceptual and cognitive systems; this requires inter-areal long-range synchronous oscillatory activity. For these oscillations to arise, a specific temporal profile of neuronal activity is required, which is established through recurrent feedback activity involving V1 and the extrastriate cortex. When V1 is lesioned, the loss of recurrent activity prevents inter-areal networks on the basis of oscillatory activity. However, as limited amount of input can reach extrastriate cortex and some extrastriate neuronal selectivity is preserved, computations involving comparison of neural firing rates within a cortical area remain possible. This enables “local” read-out from specific brain regions, allowing for the detection and discrimination of basic visual attributes. Thus blindsight is blind due to lack of “global” long-range synchrony, and it functions via “local” neural readout from extrastriate areas.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.