2 resultados para requirement-based testing

em WestminsterResearch - UK


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The paper starts from the concern that while there is a large body of literature focusing on the theoretical definitions and measurements of accessibility, the extent to which such measures are used in planning practice is less clear. Previous reviews of accessibility instruments have in fact identified a gap between the clear theoretical assumptions and the infrequent applications of accessibility instruments in spatial and transport planning. In this paper we present the results of a structured-workshop involving private and public stakeholders to test usability of gravity-based accessibility measures (GraBaM) to assess integrated land-use and transport policies. The research is part of the COST Action TU1002 “Accessibility Instruments for Planning Practice” during which different accessibility instruments where tested for different case studies. Here we report on the empirical case study of Rome.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As identified by Griffin (1997) and Kahn (2012), manufacturing organisations typically improve their market position by accelerating their product development (PD) cycles. One method for achieving this is to reduce the time taken to design, test and validate new products, so that they can reach the end customer before competition. This paper adds to existing research on PD testing procedures by reporting on an exploratory investigation carried out in a UK-based manufacturing plant. We explore the organisational and managerial factors that contribute to the time spent on testing of new products during development. The investigation consisted of three sections, viz. observations and process modelling, utilisation metrics and a questionnaire-based investigation, from which a proposed framework to improve and reduce the PD time cycle is presented. This research focuses specifically on the improvement of the utilisation of product testing facilities and the links to its main internal stakeholders - PD engineers.